Description
Army Cyber Command
Skyfold Wall Maintenance Agreement
Statement of Work (SOW)
-- 1 of 5 --
Statement of Work
1
TABLE OF CONTENTS
1.0 Introduction 2
1.1 Background 2
1.2 Scope 2
1.3 Objectives 2
2.0 Tasks 3
2.2 Deliverables 3
2.3 Schedule 4
3.0 Government Furnished Property 4
4.0 Security Requirements 4
5.0 Training Requirements 5
-- 2 of 5 --
Statement of Work
2
1.0 INTRODUCTION/OVERVIEW
This is a non-personal services contract to perform annual service on the Army Cyber
Command’s (ARCYBER) Skyfold Wall located at 930 15th Street, BLDG 61501, Fort
Gordon, GA 30905.
1.1 BACKGROUND
During the construction of the ARCYBER Headquarters two vertical folding acoustical
walls were install offering soundproofing indexes above and beyond industry standards
that is electrically operated and retracts neatly into the ceiling freeing up valuable floor
space and when engaged offering a level sound proofing that is required in a classified
environment.
1.2 SCOPE
The Contractor shall provide annual maintenance that includes all parts and labor to
perform the annual service. Additionally, ARCYBER is wanting stay eligible for the 10-
year extended warranty by maintaining this preventive maintenance agreement for the
duration of that period.
1.3 OBJECTIVES
The contractor shall carry out any repairs required to the Skyfold wall due to defects in
materials or workmanship and occurring under normal use, at no charge for parts and/or
labor during the warranty period, provided that: The Skyfold wall was operated according
to manufacturer’s specifications and/or operating instructions; The Skyfold wall was
always operated by two people, one per side of wall, each activating a switch wired in
series with the other; The Skyfold wall was operated in a normal environment like the one
that prevailed when it was originally installed; All servicing and inspections have been
performed by a local, authorized Skyfold dealer, according to the maintenance schedule
included in the manual.
2.0 TASKS
2.1 Inspect wall height as the upper position limit and the lower position limit may need
resetting.
2.2 Inspect lifting cable, drums, bearings, pulleys, couplings, tie-offs and other rigging
hardware for wear, alignment and fit.
-- 3 of 5 --
Statement of Work
3
2.3 Inspect the lift motor gearbox.
2.4 Inspect the electromagnetic brake.
2.5 Inspect the hydraulic checking device assembly includes a manifold, a reservoir, a
pressure gauge, a hydraulic motor, and a sprocket and chain. During normal operation, the
gauge pressure should be 0-100 psi (0-800 kPa) while the wall is ascending and 200-300
psi (15000-2000 kPa) while the wall is descending. The hydraulic checking device must be
inspected, and its operating pressure verified.
2.6 Test the entire electrical system including the following: the control box, encoder,
over-torque sensor, lifting motor, electromagnetic brake, obstruction/infra-red sensor, end
seals, switches, and all plugs and cables.
2.7 Inspect the lifting mechanisms for defects and abnormal wear.
2.8 Visually inspect the hydraulic oil and if necessary, change the oil.
2.2 DELIVERABLES
The Contractor shall provide one copy of the Skyfold Wall Service Inspection Report.
2.3 SCHEDULE
The work to be performed under this contract will at building 61501, 930 15th Street, Fort
Gordon, GA 30905. Work schedule Monday – Friday (weekends as required), with the
exception of federal holidays or if facility is closed due to unforeseen circumstances.
3.0 GOVERNMENT FURNISHED RESOURCES
3.1 Facilities: The Government will make available to the Contractor
building 61501 on Fort Gordon, GA to perform the work outlined in this
SOW.
3.2 Utilities: The Government will provide all standard utilities at no cost to
the Contractor. Such standard services at a minimum will include electricity,
water, sewage, heating and cooling, post telephone service and internet
service. The Contractor shall instruct employees in utilities conservation
practices. The contractor shall be responsible for operating under conditions
that preclude the waste of utilities, such as turning off the water faucets or
valves after using the required amount.
4.0 SECURITY REQUIREMENTS
-- 4 of 5 --
Statement of Work
4
4.1 Contractor and all associated sub-contractors employees shall provide all information
required for background checks to meet installation access requirements to be
accomplished by installation Provost Marshal Office, Director of Emergency Services or
Security Office. Contractor workforce must comply with all personal identity verification
requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor
Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes
otherwise authorized by the changes clause of this contract, should the Force Protection
Condition (FPCON) at any individual facility or installation change, the Government may
require changes in contractor security matters or processes.
4.2 Contractor and all associated sub-contractors employees shall comply with
adjudication standards and procedures using the National Crime Information Center
Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB)
(Army Directive 2014-05/AR 190-13), applicable installation, facility and area
commander installation/facility access and local security policies and procedures (provided
by government representative).
5.0 TRAINING REQUIREMENTS
5.1 All contractor employees, including subcontractor employees, requiring access to
Army installations, facilities, and controlled-access areas shall complete the following
training requirement:
5.2 AT Level I awareness training within thirty (30) calendar days after the contract start
date or effective date of incorporation of this requirement into the contract, whichever is
applicable. The contractor shall submit certificates of completion for each affected
contractor employee and subcontractor employee, to the COR or to the contracting officer,
if a C…
Source: SAM.gov, as posted. Verify the current solicitation before responding.