Skip to content

Open for responses

Souda Bay Job Order Contract

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
N6247026R0041
NAICS
236220
PSC
Y1JZ
Set-aside
No Set aside used
Posted
November 24, 2026
Response due
January 15, 2027
Place of performance
Chania

Description

TABLE OF CONTENTS Paragraph No. Title C.1 GENERAL REQUIREMENTS C.2 MANAGEMENT AND ADMINISTRATION C.3 TASK ORDER PRICING C.4 COEFFICIENTS C.5 RSMEANS COST DATA C.6 TOOLS AND EQUIPMENT C.7 IDENTIFICATION OF WORK AND TASK ORDER PREPARATION C.8 REVIEW OF CONTRACTOR PROPOSAL C.9 ISSUANCE OF TASK ORDER C.10 POST AWARD KICK-OFF MEETING AND PRECONSTRUCTION MEETING C.11 MINIMUM INSURANCE REQUIREMENTS C.12 PERFORMANCE GUARANTEE OR BOND REQUIREMENTS C.13 PARTNERING MEETINGS C.14 WORK RESTRICTIONS C.15 SCHEDULE C.16 HEALTH AND SAFETY C.17 QUALITY MANAGEMENT C.18 TEMPORARY FACILITIES AND CONTROLS C.19 ENVIRONMENTAL PROTECTION C.20 ENVIRONMENTAL MANAGEMENT SYSTEM C.21 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT INFORMATION (eOMSI) C.22 VALUE ADDED TAX (VAT) -- 1 of 43 -- C.1 GENERAL REQUIREMENTS Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to perform renovations, repairs, maintenance, replacements, alterations, and demolition task orders awarded at a Firm Fixed-Price (FFP), under this Indefinite Delivery, Indefinite Quantity (IDIQ) Job Order Contract (JOC). This JOC is for work within the Naval Facilities Engineering Systems Command (NAVFACSYSCOM) Europe Africa Central (EURAFCENT) Resident Officer in Charge of Construction (ROICC) Souda Bay Area of Responsibility (AOR), which includes Souda Bay the main installation at NSA Souda Bay and noncontiguous areas at Marathi Pier, Malaxa Site,Bay. Specific site locations shall be stated in individual task orders. Individual Task Order requests will provide Government performance requirements and standards. The Contractor is required to comply with all applicable U.S. federal and local host nation laws and regulations. All work performed shall conform to the NAVFACSYSCOM Unified Facilities Criteria (UFC) Uniform Facility Guide Specifications (UFGS), standard industry work practices, and the provisions of this contract. Data shall be provided for all applicable projects in accordance with UFGS 01 78 24.00 20 and UFGS 01 78 23 Electronic Operation and Maintenance Support Information (eOMSI) processes and as specified by Task Order. Unless otherwise directed by the Contracting Officer or his/her designated representative, all work must be in accordance with Uniform Facilities Criteria (UFC) 1-200-01 DoD Building Code (current version at time of individual Task Order award). Core UFCs and industrial references, policy, and standards in UFC 1-200-01 are incorporated by reference. In addition to the Core UFC, comply with other UFC as applicable to the system, structure, or facility type defined in the scope of the construction project at the Task Order level. UFC 1-200-01 takes precedence over all other direction provided herein or as part of individual Task Orders. If a discrepancy exists between specifications and drawings, then specifications take precedence. The Contracting Officer has sole authority to determine the applicability of criteria identified in UFC 1-200-01 at the Task Order level. The Contracting Officer also has sole authority to approve equivalent standards to those identified in UFC 1-200-01 that satisfy the intent of criteria, such as a material or component meeting a host-nation standard in a foreign location at the Task Order level. Deviations or variations from UFC 1-200-01 criteria are required to be approved by the Contracting Officer in advance at the Task Order level. UFC 1-200-01 criteria apply irrespective of equipment, material, or labor availability. C.1.1 Contract Type and Term This is an Indefinite-Quantity (IDIQ) contract with a base period of up to thirty-six (36) months with a potential of an additional Option Period One for thirty-six (36) months and Option Period Two for twenty-four (24) months which cumulatively will not exceed 96 months. The Government may exercise option periods at its discretion. Individual Firm Fixed Price (FFP) Task Orders issued hereunder shall specify delivery or performance requirements. Typically, projects will be within the minimum/ maximum dollar range of $5,000 to $4,500,000. Work ordered under this contract will not require the Contractor to provide designs. The contractor is, however, responsible for providing drawings, calculations, test reports, and additional information required by the Contracting Officer to demonstrate construction compliance with UFC and UFGS criteria after Task Order award. All Task Order work will require scope development by the Contractor. In select cases, the Government will provide design or basis for design. The Contractor may be required to provide narratives, sketches, material catalog cuts, and quantity take-off with each Task Order proposal to ensure common understanding. Pricing for each Task Order will be by pre-priced (R.S.MEANS Cost Data) and non-pre-priced methods. C.1.2 Basic Principles of the JOC A major element of the JOC process is the use of applying a coefficient (multiplier) to proposal costs in order to calculate the proposed cost for a task order. The coefficient must include not only the Contractor’s overhead and profit, but also all other costs associated with doing business that are not represented in the RSMEANS bare costs or in Subcontractor’s proposals, in accordance with section C.4.2., to include development of Detailed Scopes of Work. For each project, the Government and the Contractor follow the same steps: 1. Conduct a Joint Scope Meeting at the site to review and discuss the Government Scope of Work and the period of performance; -- 2 of 43 -- 2. Contractor prepares a Detailed Joint Scope of Work; 3. Government issues a Request for Proposal (RFP); 4. Contractor prepares a price proposal in the format requested and submits a proposed construction schedule, list of Subcontractors and other documents required by the Task Order; 5. Government revi…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220