What this opportunity is
The Department of Defense is seeking qualified small businesses, specifically 8(a), HUBZone, woman-owned, and service-disabled veteran-owned firms, to perform de-manufacturing operations at a Defense Logistics Agency Disposition Services site in Gimcheon, South Korea. The contract will require the provision of personnel, equipment, and materials necessary for disposal and recycling of excess U.S. Department of War property. This Sources Sought notice indicates that interested firms should prepare to comply with limitations on subcontracting, and it is essential to track this opportunity on SAM.gov for future solicitation details.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
PERFORMANCE WORK STATEMENT
TABLE OF CONTENTS
1.0 GENERAL INFORMATION
1.1 CONTRACT INFORMATION
1.2 CONTRACT LINE-ITEM NUMBER (CLIN) FORMAT AND COMPENSATION OF SERVICES
1.3 CONTRACTOR RESPONSIBILITIES
1.4 LICENSES AND/OR PERMITS
1.5 SPECIAL REQUIREMENTS
1.6 DBIDS INSTALLATION ACCESS
2.0 DEMANUFACTURING (DEMAN)
3.0 WEATHER/SAFETY
4.0 CONTACTOR PERSONNEL: CONTRACT MANAGER/ ALTERNATE CONTRACT MANAGER/ ON-SITE TECHNICAL REPRESENTATIVE
4.1 CONTRACTOR POINTS OF CONTACT
4.2 CONTRACTOR IDENTIFICATION
4.3 CONTRACTOR MANAGERS
4.4 APPEARANCE
4.5 ENGLISH REQUIREMENTS
4.6 CONTRACTOR KNOWLEDGE
4.7 RESTRICTIONS
4.8 EMPLOYEE TRAINING
4.9 PASSES FOR ENTRY INTO MILITARY INSTALLATIONS
5.0 U.S. GOVERNMENT FURNISHED MATERIAL
6.0 SECURITY
6.1 PHYSICAL SECURITY
6.2 KEY CONTROL
6.3 CLASSIFIED/ CONFIDENTIAL MATERIAL
6.4 CLASSIFIED/ CONFIDIENTIAL REPORT
7.0 POST-AWARD ORIENTATION CONFERENCE
8.0 PHASE OUT
9.0 REVERSION
10.0 DELIVERIES AND PERFORMANCE
11.1 PLACE OF PERFORMANCE
11.2 TIME OF PERFORMANCE
11.3 CONTACTOR NOTICE – LATE DELIVERY AND/ OR PERFORMANCE
11.4 ACCEPTABLE PERFORMANCE LEVELS (APLs)
11.5 ACCEPTABLE PERFORMANCE LEVEL TABLE
12.0 INVOICE PROCEDURES
12.1 INVOICE SUBMISSION
12.2 REQUIRED SUPPORTING DOCUMENTATION
1.0 GENERAL INFORMATION
a. The Contractor shall provide all personnel, equipment, containers, tools, materials, supervision, and other items or services necessary to perform de-manufacturing (DEMAN) operations. The Contractor shall meet the standards including disposal and recycling as defined in this Performance Work Statement for Defense Logistics Agency Disposition Services (DLA DS) site located at Gimcheon, South Korea. Additional pick-up locations and Forward Collection Sites (FCS) may be added at no additional cost to the government. Other FCS may be designated after award of the contract and will be identified by the Contracting Officer (KO).
b. Background. DLA DS disposes of foreign excess personal property of the United States Department of War (U.S. DoW). DLA DS receives property that is no longer required for use in the DoW and decides whether the property is usable or scrap. If usable property is not needed for redistribution within the Federal U.S. Government, it may be donated to state and local U.S. Governments, sold to the public, or processed for recovery of specific metals and materials required for use by the DoW. Only material that has not been disposed of by these outlets or is determined to be scrap shall be subject to this contract.
c. Purpose. The purpose of this contract is de-manufacturing electronics and recycling material in an environmentally responsible and compliant manner. This contract does NOT involve disposal of hazardous materials (HM) or hazardous waste (HW).
d. Objectives. The objectives of contracting for scrap services are to ensure compliant scrap disposal management; to decrease disposal costs; to maximize economic off-sets; to reduce the U.S. Government’s capital investment (facilities and equipment costs) and infrastructure; to reduce solid waste disposal through increased recycling; and to move property efficiently.
e. Definitions. A list of definitions is provided in Attachment 3.
1.1 CONTRACT INFORMATION
a. The contract(s) awarded from this solicitation will be a Firm Fixed Price, Indefinite Delivery / Indefinite Quantity (IDIQ), Performance-Based, Commercial Service contract. The contract includes one (1) 18-month base period and two (2) 18-month option periods.
b. The base period will begin upon contract award for an 18-month period which includes a 30-day commencement period to complete design and set up at collection points. The U.S. Government may exercise unilaterally in accordance with clause FAR 52.217-9, entitled “Option to Extend the Term of the Contract (Mar 2000)” which is incorporated in clauses section in full text.
c. In addition to the 18-month base period and two (2) 18-month option periods mentioned above, the U.S. Government has the option to extend the term of the contract by up to six (6) months in accordance with clause FAR 52.217-8, entitled “Option to Extend Services (Nov 1999)”, which is also incorporated in the clauses section in full text.
d. The minimum amount for the base period shall be ₩ 14,784,100, with no minimum for the option periods. The maximum amount for the base and each of the priced options shall be 200% of the estimated value of the period. The estimated value of a period is the sum of the Price Schedule for that period (Base period, 1st or 2nd option).
e. Task Order (TO) (DD Form 1155) will be issued based upon the unit prices established in the contract Price Schedule. No TO will be issued unless funds are available. The accounting and appropriation data will be stipulated on each TO. The issuance of a TO shall constitute notice of availability and obligation of funds for the items listed on the TO.
f. TO quantities are estimated amounts. The Contractor can expect that the TO quantities will be required to be adjusted upward or downward as removals take place and the actual pounds being removed are measured. Therefore, the U.S. Government has the unilateral right to increase the TO quantity in those instances where the U.S. Government has underestimated the amount of weight that is required to be removed so the Contractor can continue performance. The U.S. Government has the unilateral right to decrease the TO weight in those instances where the U.S. Government has overestimated the quantity that is required to be removed. In instances of decreasing weight, these decreases are not subject to FAR 52.212-4, termination for convenience coverage. In addition, it is agreed that it is acceptable for the U.S. Government to issue TO modification (i.e., quantity changes, noun descriptions, CLIN changes, adding/deleting lines, extending TO end dates, etc.) unilaterally. The Contractor will be paid for the actual items and quantities removed per t…
Source: SAM.gov, as posted. Verify the current solicitation before responding.