Skip to content

Open for responses

Stoneville Hazardous Chemical Waste Packaging, Transportation, and Disposal

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
12444727Q0004
NAICS
562211
PSC
S222
Set-aside
Small Business Set Aside - Total
Posted
November 13, 2026
Response due
November 20, 2026
Place of performance
Stoneville, MS

What this opportunity is

The Department of Agriculture is seeking a small business contractor for hazardous chemical waste packaging, transportation, and disposal services at its Stoneville, Mississippi laboratory. This total small business set-aside opportunity falls under NAICS code 562211, which pertains to hazardous waste treatment and disposal. Interested small businesses should note that this is a combined synopsis/solicitation, meaning they must submit quotations directly without a separate solicitation document. The deadline for quotation submission has been extended to November 19, 2026, with a revised performance period from November 30, 2026, to December 30, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 US Department of Agriculture (USDA) Stoneville Chemical Disposal October 20, 2026 -- 1 of 4 -- 2 Contents Project ........................................................................................................................................................................................................ 3 General Information .................................................................................................................................................................................. 3 1.0 Scope of Work .................................................................................................................................................................................. 3 2.0 Background ...................................................................................................................................................................................... 3 Contractor Requirements .......................................................................................................................................................................... 3 3.0 Technical Requirements / Tasks....................................................................................................................................................... 3 4.0 Government Furnished .................................................................................................................................................................... 4 5.0 Deliverables / Schedule.................................................................................................................................................................... 4 6.0 Travel ............................................................................................................................................................................................... 4 7.0 Contractor’s Key Personnel .............................................................................................................................................................. 4 8.0 Security Requirements ..................................................................................................................................................................... 4 9.0 Data Rights ....................................................................................................................................................................................... 4 10.0 Section 508 – Electronic and Information Technology Standards ................................................................................................. 4 Attachment ............................................................................................................................................................................................ 4 -- 2 of 4 -- 3 Project Hazardous Chemical Waste Disposal. General Information 1.0 Scope of Work Hazardous chemical waste that needs to be properly disposed of as soon as possible. The laboratory is closing. There is no one left on site that can take care of the chemicals. 2.0 Background The Southern Research Station (SRS) Lab has been running soil and plant samples for many years. As a result of lab procedures, hazardous waste is generated from the chemicals used. This waste needs to be properly disposed of by a responsible company. The SRS lab is closing, and all the chemical waste needs to be removed as soon as possible. There is large safety factor involved if there is a spill or leak of the waste. No one remains on site that has knowledge of the chemicals and how to take care of them. Urgency is needed to have the waste removed safely. Contractor Requirements 3.0 Technical Requirements / Tasks The hazardous waste items are stored in the Chemical Storage Building at SRS, and all containers are in good condition. The items being disposed of are: Category Quantity Container & Size Toxic 6.1 3 5-Gallon Pail Organic Treat 1 20-Gallon Drum Toxic 6.1 1 30-Gallon Drum Class 9 1 55-Gallon Drum Reducers 1 20-Gallon Drum Amines 1 5-Gallon Pail Sulfides 1 5-Gallon Pail Sodium Azide 1 5-Gallon Pail Oxidizer 1 5-Gallon Pail Arsenic 1 5-Gallon Pail Uranyl Acetate 1 Unit Flammable Incineration, Temp Controlled 1 5-Gallon Pail Toxic Liquids Organic 1 30-Gallon Drum Ethers 1 5-Gallon Pail 4.1 Nitroguanidine 1 5-Gallon Pail PIH 2 5-Gallon Pail Ether Stabilization 2 Unit Container & Size -- 3 of 4 -- 4 Azide Stabilization 1 Unit Flammable Solids 1 Unit Temp Controlled Stabilization 1 Un The waste disposal company will arrive on site with a truck containing all packing material, containers, and transportation manifests to ensure safe and legal transport to a North Carolina licensed chemical incinerator. The company will also pack the hazardous waste into the containers and load the containers onto the truck. After packing and loading, the company will provide an inventory of all waste to be reviewed before leaving and supply the signed DOT manifests. The company will provide a statement of incineration once the waste is processed. 4.0 Government Furnished None. 5.0 Deliverables / Schedule A pickup of Government hazardous chemical waste will be scheduled once the contract is approved. This will be a one-time only pickup. 6.0 Travel No travel. 7.0 Contractor’s Key Personnel Paula Phillips will be the Contracting Officer Representative (COR). 8.0 Security Requirements No security requirements since waste packing and loading will take place near the separate Chemical Storage building on site. 9.0 Data Rights Signed copies of the manifests will be provided once the waste loading is completed. 10.0 Section 508 – Electronic and Information Technology Standards None. Attachment None. -- 4 of 4 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 562211