Skip to content

Open for responses

Tinker AFB 2026 Multiple Award Construction Contract (MACC)

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA8137-26-R-0040
NAICS
236210
PSC
Z2JZ
Set-aside
Small Business Set Aside - Partial
Posted
November 13, 2026
Response due
November 30, 2026
Place of performance
0, OK

What this opportunity is

The Department of Defense is soliciting proposals for a Multiple Award Construction Contract (MACC) at Tinker Air Force Base in Oklahoma, classified under NAICS 236210. This opportunity is set aside for small businesses, allowing partial participation. Interested contractors should note that the solicitation includes updated evaluation criteria and instructions, with a proposal due date extended to November 30, 2026, at 1 PM. Tracking this solicitation is essential, as it involves multiple amendments and changes that require careful review of the provided documents.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Tinker AFB Tinker General Requirements SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS (ASHRAE) ASHRAE 52.2 (2017) Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP) ANSI/ASSP A10.34 (2021) Protection of the Public on or Adjacent to Construction Sites ANSI/ASSP A10.44 (2020) Control of Energy Sources (Lockout/Tagout) for Construction and Demolition Operations ANSI/ASSP Z490.1 (2016) Criteria for Accepted Practices in Safety, Health, and Environmental Training ASTM INTERNATIONAL (ASTM) ASTM D6245 (2012) Using Indoor Carbon Dioxide Concentrations to Evaluate Indoor Air Quality and Ventilation ASTM D6345 (2010) Standard Guide for Selection of Methods for Active, Integrative Sampling of Volatile Organic Compounds in Air ASTM F855 (2020) Standard Specifications for Temporary Protective Grounds to Be Used on De-energized Electric Power Lines and Equipment INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE) IEEE 1048 (2016) Guide for Protective Grounding of Power Lines IEEE C2 (2023) National Electrical Safety Code INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA) ANSI/ISEA Z89.1 (2014; R 2019) American National Standard for Industrial Head Protection October 2026 Page 1 Section 01 35 26 -- 1 of 17 -- Tinker AFB Tinker General Requirements NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA) NEMA Z535.2 (2011; R 2017) Environmental and Facility Safety Signs NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) NFPA 51B (2024) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work NFPA 70 (2023; ERTA 1 2024; TIA 24-1) National Electrical Code NFPA 70E (2024) Standard for Electrical Safety in the Workplace NFPA 241 (2022) Standard for Safeguarding Construction, Alteration, and Demolition Operations NFPA 306 (2024) Standard for the Control of Gas Hazards on Vessels SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION (SMACNA) ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition U.S. ARMY CORPS OF ENGINEERS (USACE) EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 10 CFR 20 Standards for Protection Against Radiation 29 CFR 1910 Occupational Safety and Health Standards 29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment 29 CFR 1919 Gear Certification 29 CFR 1926 Safety and Health Regulations for Construction 49 CFR 173 Shippers - General Requirements for Shipments and Packagings CPL 2.100 (1995) Application of the Permit-Required Confined Spaces (PRCS) Standards, 29 CFR 1910.146 October 2026 Page 2 Section 01 35 26 -- 2 of 17 -- Tinker AFB Tinker General Requirements 1.2 FORMS USACE Engineer Forms (ENG Form) cited in this specification may be obtained at the following link: https:\\www.publications.usace.army.mil/USACE-Publications/Engineer-Forms/ 1.3 DEFINITIONS The following definitions are for the convenience of the reader. If there is a referenced document in the text of this specification section, that is the document that should define terms for that paragraph. If further clarification is needed, contact the Contracting Officer. 1.3.1 Site Safety and Health Officer (SSHO) A Contractor Employee that is responsible for overseeing and ensuring implementation of the prime Contractor's Safety and Occupational Health (SOH) program according to the Contract, EM 385-1-1, applicable federal, state, and local requirements. 1.3.1.1 Level One SSHO A designated employee with full-time SOH responsibility that meets and follows the requirements of EM 385-1-1. 1.3.1.2 Level Two SSHO A designated employee with Level Two SSHO responsibility that meets and follows the requirements of EM 385-1-1. Level Two SSHOs cannot be assigned to projects that have a residual Risk Assessment Code (RAC) of high or extremely high. 1.3.1.3 Level Three SSHO A designated Qualified Person or Competent Person with SOH responsibility that meets and follows the requirements of EM 385-1-1. Level 3 SSHOs cannot be assigned to projects that have a residual RAC of high or extremely high. 1.3.1.4 Alternate SSHO An employee that meets the definition of the contract-required level SSHO, but is not the primary SSHO. 1.3.2 Competent Person (CP) The CP is a person designated in writing, who, through training, knowledge and experience, is capable of identifying, evaluating, and addressing existing and predictable hazards in the working environment or working conditions that are unsanitary, hazardous, or dangerous to personnel, and who has authorization to take prompt corrective measures to eliminate them. 1.3.3 Qualified Person (QP) The QP is a person designated in writing, who, by possession of a recognized degree, certificate, or professional standing, or extensive knowledge, training, and experience, has successfully demonstrated their ability to solve or resolve problems related to the subject matter, the October 2026 Page 3 Section 01 35 26 -- 3 of 17 -- Tinker AFB Tinker General Requirements work, or the project. 1.4 SUBMITTALS Government Acceptance or Approval does not remove responsibility from the Contractors for their actions or liability. Government approval is required for submittals with a "G" classification. Submittals not having a "G" classification are for information only. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-01 Preconstruction Submittals Accident Prevention Plan (APP) Design; G Accident Prevention Plan (APP) Construction; G SD-06 Test Reports Accident Reports; G LHE In…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236210