Skip to content

Open for responses

Tractor Purchase

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA855627PXXXX
NAICS
336120
PSC
2320
Set-aside
No Set aside used
Posted
November 3, 2026
Response due
November 23, 2026
Place of performance
Warner Robins, GA

What this opportunity is

The Department of Defense is seeking to purchase one new heavy-duty long-haul tractor with specific features, including an integrated dual-sleeper cab and manual transmission, to support its mission requirements. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested vendors should note that the solicitation type indicates a need to track the opportunity closely, as the contract will be awarded to the lowest priced, compliant quote.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

AIR FORCE LIFE CYCLE MANAGEMENT CENTER ROBINS AIR FORCE BASE, GEORGIA 31098-1670 STATEMENT of WORK (SOW) FOR Tractor Replacement Purchase PR Number: FX2372-27-10003 Date: 28 October 2027 Prepared by: AFLCMC/EBU 425 Eastman Street Robins AFB, GA 31098-1670 DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 17-08-21). Other requests for this document shall be referred to AFLCMC/EBAK, Robins AFB, GA 31098-1670. -- 1 of 8 -- PR: FX2372-27-10003 SOW REVISION: 0 2 Distribution Statement: C TABLE OF CONTENTS SECTION TITLE PAGE SECTION 1 DESCRIPTION OF SERVICES 3 SECTION 2 SCOPE OF WORK 3 SECTION 3 TECHNICAL REQUIREMENTS 4 SECTION 4 GENERAL INFORMATION 8 -- 2 of 8 -- PR: FX2372-27-10003 SOW REVISION: 0 3 Distribution Statement: C 1.0 Description of Services: 1.1 Objective(s): This Statement of Work Statement (SOW) describes the requirements for purchase of one (1) new heavy-duty long-haul tractor configured with an integrated dual-sleeper cab and manual transmission to support AFLCMC/EBU Robins, Weapons Superiority’s unique mission requirements. 1.2 Background: The AFLCMC/EBU Transportation program ensures secure, fully compliant transit of classified and/or hazardous materials. The organization maintains an authorized fleet allocation of 13 vehicles, with 10 assets currently assigned and operational within the program. The 78th Logistics Readiness Squadron (78 LRS) delivers comprehensive vehicle management and maintenance support, to include generating official End-of-Life (EOL) life cycle recommendations for all assets assigned to the organization. The owning organization retains budgetary responsibility for funding and procuring replacement assets for vehicles designated as nearing or exceeding their operational EOL threshold. The objective of this procurement is to replace the program’s authorized 2018 Freightliner tractor. Although the asset has not yet reached its standard operational end-of-life (EOL) lifecycle threshold, the EBU Transportation program secured formal authorization for premature replacement due to severe structural, operational, and safety liabilities. Local Purchase Approval was granted for the previous replacement purchase due to our unique requirement not being available through the mandated source of supply. The Local Purchase saved the Government in overall costs and ensured the tractor was delivered in a ready-to- operate configuration with no additional cost or time needed for modifications. Local Purchase Approval was granted for this replacement purchase on 25 September 2026. 2.0 Scope of Work 2.1 The Contractor shall furnish and deliver one (1) new, commercial-grade, heavy-duty Class 8 replacement long-haul tractor configured with an integrated dual-sleeper cab and manual transmission to support continuous, multi-driver over-the-road operations throughout the Continental United States (CONUS). The tractor shall be engineered and equipped to operate reliably across diverse geographic terrains and extreme climatic conditions while hauling hazardous materials (HAZMAT) and/or classified assets. To minimize engine idle time, optimize fuel efficiency, and ensure driver comfort and electrical auxiliary reliability during mandatory rest periods, the vehicle shall come equipped with a fully integrated diesel-powered Auxiliary Power Unit (APU) capable of providing autonomous heating, air conditioning, and continuous secondary electrical power without requiring the primary engine to run. Vehicle acceptance is also contingent upon the successful installation of brush guards. Prime contractors are authorized to utilize subcontracted support to fulfill post sale modification requirements. 2.2 The vehicle must be fully compliant with all applicable federal, state, and local motor vehicle safety and environmental standards at the time of delivery, including all Title 49 Code of Federal Regulations (49 CFR) and Federal Motor Carrier Safety Administration (FMCSA) requirements governing commercial motor vehicles and hazardous materials transportation. In -- 3 of 8 -- PR: FX2372-27-10003 SOW REVISION: 0 4 Distribution Statement: C addition to standard heavy-duty powertrain and chassis capabilities, the tractor shall incorporate HAZMAT-specific transport provisions, including specialized electrical isolation/battery disconnect switches, dedicated placard holders, chemical/spill and emergency equipment securement points, and compliant fire suppression mounts. The Contractor's scope encompasses complete vehicle assembly, installation of all specified optional and mandatory components, thorough Pre-Delivery Inspection (PDI), provision of standard and extended warranty packages, operator and maintenance technical documentation, and final delivery and operational turnover to the designated receiving facility. 3.0 Technical Requirements 3.1 Contract/Order Period of Performance: The period of performance for the contract/order is 30-60 days ARO order with a buyer acceptance inspection prior to equipment being accepted. 3.1.2 Contract Data Requirements List (CDRL): Document Identifier DID Title SOW Reference(s) A001 DI-TMSS-80527C/T COTS Manuals and Associated Data 4.4 3.2 Tractor Specifications: 2027 Year Model 3.2.1 2027 Year Model 3.2.2 Dual Bunk High Rise Roof Sleeper 3.2.3 Tractor/Trailor Configuration 3.3 Engine and Transmission: 3.3.1 DD15 Gen High Power 14.8L 505 HP @1625 RPM, 1900 GOV RPM, 1650 LB-FT @975 RPM 3.3.2 2010 EPA/CARB/GHG21 Configuration 3.3.3 Fan Hub: Variable Speed for MX-13 Belt Driven 3.3.4 Cooling Module: 1456 Square Inch 3.3.5 Fuel Filter: PACCAR EXT. ON-ENG Fuel/Water Sep, 2021 MX Only 3.3.6 Immersion Eng Block HTR: 110-120V/1500W 3.3.7 Alternator: SEG HDS 200 AMP Brushed 3.3.8 Batt: 4 PACCAR GP31 THR (700-730), 2800-2920 CCA Duel Purpose Batteries 3.3.9 12V Low Voltage Disconnect for Starter Battery Protection 3.3.10 Manual 60 3.4 Front Axle …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 336120