What this opportunity is
The Department of Defense is seeking a small business to modernize the hydraulic motion system at Tunnel 9 in Silver Spring, MD. This project involves design, engineering, procurement, fabrication, installation, and commissioning of core components, including a primary control valve, main actuating cylinder, and hydraulic power unit, all adhering to specific ASME and ISO standards. As a total small business set-aside, this solicitation is suitable for small contractors, and interested parties should track the notice for further details before bidding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
06 Nov 2026
STATEMENT OF OBJECTIVE
FOR
TUNNEL 9 HYDRAULIC SYSTEM UPGRADE
Revision Date
0 16 Jun 2026
1 06 Nov 2026 Added section 4.4.1.iii - Confined Space reqs
ARNOLD ENGINEERING DEVELOPMENT COMPLEX
ARNOLD AIR FORCE BASE, TN 37389-9998
Distribution A.
Approved for Public Release. Distribution is unlimited.
Per AEDC-IRA-26-1719
-- 1 of 25 --
06 Nov 2026
Distribution A.
Approved for Public Release. Distribution is unlimited.
Per AEDC-IRA-26-1719
Table of Contents-1
Table of Contents
1. BACKGROUND
1.1. Background
1.2. Statement of Need
1.3. Justification
2. SCOPE OF WORK
3. APPLICABLE DOCUMENTS
2.1 Government Documents
2.2 Non-Government Documents
4. REQUIREMENTS
4.1. General
4.2. Engineering/Design
4.3. Part Procurement
4.4. Demolition/Installation/Verification
Appendix A – Submittal Procedure
Appendix B – Scope Split Table
-- 2 of 25 --
06 Nov 2026
Distribution A.
Approved for Public Release. Distribution is unlimited.
Per AEDC-IRA-26-1719
Page-1
1. Background
1.1. NOTICE TO OFFERERS
This Statement of Objectives (SOO) is a high-level summary of a project that
seeks to find contractors capable and willing to complete this project. Once a
contractor that meets these requirements, along with the ability to access CUI,
submits their capabilities for this project, a more detailed Controlled Unclassified
Information (CUI) Statement of Work will be shared prior to bidding on the
contract.
1.2. Background
Tunnel 9, a geographically separated unit of AEDC located in Silver Spring, MD,
provides the Department of Defense with unique hypersonic ground test
capabilities. A core feature of this facility is a high-speed, single-axis positioning
system that allows for the collection of vital performance data under demanding
conditions. This capability is powered by a complex hydraulic system that actuates
several critical functions, including the primary high-speed motion of the test
apparatus. Motion control is managed through a custom control architecture that
sends command signals to a specialized three-stage servo-proportional valve,
which is the centerpiece of the motion control and the primary focus of this
upgrade initiative.
2. OBJECTIVE
2.1. The objective of this project is for the Contractor to perform a comprehensive
modernization of a high-performance hydraulic motion system. The scope
includes the design, procurement, installation, and commissioning of core
system components, including the primary control valve, main actuating cylinder,
and the Hydraulic Power Unit (HPU). All associated accumulators, intermediate
valves, regulators, and piping necessary for the new system shall also be
replaced.
Furthermore, the upgrade shall introduce two key enhancements: a dedicated
filtration and cooling circuit to maintain hydraulic fluid health and additional
instrumentation for improved system monitoring. The newly installed system
must be designed for full mechanical and functional compatibility with existing,
interconnected facility systems that are out of the scope of this replacement.
2.2. This Contract shall be broken up into 3 separate phases that will be quoted and
executed separately to ensure flexibility for AEDC Tunnel 9 on scheduling/period
of performance. Phase 1 includes engineering/design efforts. Phase 2 shall
include component procurement and any pre-demolition assembly, testing, and
verification. And phase 3 shall cover demolition of the current system and post-
demolition assembly/installation, and testing/verification to complete delivery.
These 3 phases will be described in further detail in the subsequent sections and
the requirements section.
-- 3 of 25 --
06 Nov 2026
Distribution A.
Approved for Public Release. Distribution is unlimited.
Per AEDC-IRA-26-1719
Page-2
2.2.1. Phase 1 Engineering Design: The Contractor shall develop and deliver a
comprehensive engineering design package. This includes all component
sizing calculations, system simulations, schematics, a detailed bill of
materials, and 2D/3D models. The design must be approved by AEDC
before proceeding to Phase 2. Procurement of long-lead items may be
initiated prior to phase 2 only with approval from AEDC. Phase is expected
to begin upon award of contract.
2.2.2. Phase 2 Part Procurement: Following design approval, the Contractor shall
procure all components. This phase also includes any off-site fabrication,
pre-assembly of subsystems, and associated testing and verification
required to prepare for on-site installation. Phase is expected to begin Fall
2026.
2.2.3. Phase 3 Demolition/Installation/Commissioning: The Contractor shall
execute the on-site work at Tunnel 9, beginning with the demolition and
disposal of the existing legacy system. The new system components and
assemblies shall then be installed, integrated, and fully commissioned.
Final acceptance testing and verification will be performed to complete the
project delivery. Phase is expected to begin Summer or Fall of 2027.
2.3. AEDC will be responsible for specific portions of the system design and
integration. To ensure clarity, these responsibilities are outlined in a "Scope Split
Table." Further details are provided in the Requirements within Section 4. w/
support from Contractor. A “supporting role” means that the party will answer
questions and provide assistance but is not responsible for completing the task.
If a support request exceeds the scope of this definition, the parties involved will
discuss a formal change.
No. Description AEDC Contractor
1 Project schedule coordination. Hold Required SE reviews with
AEDC. Support Responsible
2 CAD model/measurements of structures interfacing with
Hydraulic Equipment. Responsible Support
3
Design and Layout of Hydraulic Equipment & associated
instrumentation (Proportional Valve, Cylinder, HPU, Manifolds,
Accumulator, intermediate piping/components, pressure
transducers, LDT).
Responsible
4 Design of brackets, mounts, enclosures for Hydraulic equipment. Sup…
Source: SAM.gov, as posted. Verify the current solicitation before responding.