Open for responses

Tunnel 9 Pitch Upgrade

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA9101T9PU
NAICS
332912
PSC
4320
Set-aside
Small Business Set Aside - Total
Posted
November 6, 2026
Response due
December 10, 2026
Place of performance
Silver Spring, MD

What this opportunity is

The Department of Defense is seeking a small business to modernize the hydraulic motion system at Tunnel 9 in Silver Spring, MD. This project involves design, engineering, procurement, fabrication, installation, and commissioning of core components, including a primary control valve, main actuating cylinder, and hydraulic power unit, all adhering to specific ASME and ISO standards. As a total small business set-aside, this solicitation is suitable for small contractors, and interested parties should track the notice for further details before bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

06 Nov 2026 STATEMENT OF OBJECTIVE FOR TUNNEL 9 HYDRAULIC SYSTEM UPGRADE Revision Date 0 16 Jun 2026 1 06 Nov 2026 Added section 4.4.1.iii - Confined Space reqs ARNOLD ENGINEERING DEVELOPMENT COMPLEX ARNOLD AIR FORCE BASE, TN 37389-9998 Distribution A. Approved for Public Release. Distribution is unlimited. Per AEDC-IRA-26-1719 -- 1 of 25 -- 06 Nov 2026 Distribution A. Approved for Public Release. Distribution is unlimited. Per AEDC-IRA-26-1719 Table of Contents-1 Table of Contents 1. BACKGROUND 1.1. Background 1.2. Statement of Need 1.3. Justification 2. SCOPE OF WORK 3. APPLICABLE DOCUMENTS 2.1 Government Documents 2.2 Non-Government Documents 4. REQUIREMENTS 4.1. General 4.2. Engineering/Design 4.3. Part Procurement 4.4. Demolition/Installation/Verification Appendix A – Submittal Procedure Appendix B – Scope Split Table -- 2 of 25 -- 06 Nov 2026 Distribution A. Approved for Public Release. Distribution is unlimited. Per AEDC-IRA-26-1719 Page-1 1. Background 1.1. NOTICE TO OFFERERS This Statement of Objectives (SOO) is a high-level summary of a project that seeks to find contractors capable and willing to complete this project. Once a contractor that meets these requirements, along with the ability to access CUI, submits their capabilities for this project, a more detailed Controlled Unclassified Information (CUI) Statement of Work will be shared prior to bidding on the contract. 1.2. Background Tunnel 9, a geographically separated unit of AEDC located in Silver Spring, MD, provides the Department of Defense with unique hypersonic ground test capabilities. A core feature of this facility is a high-speed, single-axis positioning system that allows for the collection of vital performance data under demanding conditions. This capability is powered by a complex hydraulic system that actuates several critical functions, including the primary high-speed motion of the test apparatus. Motion control is managed through a custom control architecture that sends command signals to a specialized three-stage servo-proportional valve, which is the centerpiece of the motion control and the primary focus of this upgrade initiative. 2. OBJECTIVE 2.1. The objective of this project is for the Contractor to perform a comprehensive modernization of a high-performance hydraulic motion system. The scope includes the design, procurement, installation, and commissioning of core system components, including the primary control valve, main actuating cylinder, and the Hydraulic Power Unit (HPU). All associated accumulators, intermediate valves, regulators, and piping necessary for the new system shall also be replaced. Furthermore, the upgrade shall introduce two key enhancements: a dedicated filtration and cooling circuit to maintain hydraulic fluid health and additional instrumentation for improved system monitoring. The newly installed system must be designed for full mechanical and functional compatibility with existing, interconnected facility systems that are out of the scope of this replacement. 2.2. This Contract shall be broken up into 3 separate phases that will be quoted and executed separately to ensure flexibility for AEDC Tunnel 9 on scheduling/period of performance. Phase 1 includes engineering/design efforts. Phase 2 shall include component procurement and any pre-demolition assembly, testing, and verification. And phase 3 shall cover demolition of the current system and post- demolition assembly/installation, and testing/verification to complete delivery. These 3 phases will be described in further detail in the subsequent sections and the requirements section. -- 3 of 25 -- 06 Nov 2026 Distribution A. Approved for Public Release. Distribution is unlimited. Per AEDC-IRA-26-1719 Page-2 2.2.1. Phase 1 Engineering Design: The Contractor shall develop and deliver a comprehensive engineering design package. This includes all component sizing calculations, system simulations, schematics, a detailed bill of materials, and 2D/3D models. The design must be approved by AEDC before proceeding to Phase 2. Procurement of long-lead items may be initiated prior to phase 2 only with approval from AEDC. Phase is expected to begin upon award of contract. 2.2.2. Phase 2 Part Procurement: Following design approval, the Contractor shall procure all components. This phase also includes any off-site fabrication, pre-assembly of subsystems, and associated testing and verification required to prepare for on-site installation. Phase is expected to begin Fall 2026. 2.2.3. Phase 3 Demolition/Installation/Commissioning: The Contractor shall execute the on-site work at Tunnel 9, beginning with the demolition and disposal of the existing legacy system. The new system components and assemblies shall then be installed, integrated, and fully commissioned. Final acceptance testing and verification will be performed to complete the project delivery. Phase is expected to begin Summer or Fall of 2027. 2.3. AEDC will be responsible for specific portions of the system design and integration. To ensure clarity, these responsibilities are outlined in a "Scope Split Table." Further details are provided in the Requirements within Section 4. w/ support from Contractor. A “supporting role” means that the party will answer questions and provide assistance but is not responsible for completing the task. If a support request exceeds the scope of this definition, the parties involved will discuss a formal change. No. Description AEDC Contractor 1 Project schedule coordination. Hold Required SE reviews with AEDC. Support Responsible 2 CAD model/measurements of structures interfacing with Hydraulic Equipment. Responsible Support 3 Design and Layout of Hydraulic Equipment & associated instrumentation (Proportional Valve, Cylinder, HPU, Manifolds, Accumulator, intermediate piping/components, pressure transducers, LDT). Responsible 4 Design of brackets, mounts, enclosures for Hydraulic equipment. Sup…

Source: SAM.gov, as posted. Verify the current solicitation before responding.