U.S. ARMY 63RD READINESS DIVISION MILCON ERCIP MICROGRID

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W9123826RA016
NAICS
237130
PSC
Y1MG
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 12, 2026
Response due
June 29, 2026

What this opportunity is

The Department of Defense is seeking a contractor to install a microgrid system for the U.S. Army Reserve 63rd Readiness Division in Mountain View, CA. This project involves a 750kWdc photovoltaic system, a 750kWh battery energy storage system, and an 800kW generator. The opportunity is set aside for total small businesses, making it suitable for small contractors with relevant capabilities. As a solicitation notice, interested businesses should prepare to submit bids rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Specifications Install Microgrid, 750kWdc PV, 750kWh BESS, & 800kW Generator System Contract No. W912DY19D0027 Task Order No. W912DY21F0044 US Army Reserve 63d Readiness Division Mountain View, CA Final Design Submittal Draft October 6, 2025 -- 1 of 1704 -- INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR SYSTEM - US ARMY RESERVES 63D READINESS DIVISION 10/06/2025 Pages or sheets covered by this seal: 01 11 00, 01 14 00, 01 20 00, 01 30 00, 01 32 01.00 10, 01 33 00, 01 35 26,01 45 00, 01 45 00.15 10, 01 50 00, 01 57 19, 01 58 00, 01 74 19, 01 78 00, 01 78 23, 07 84 00 10/06/2025 Pages of sheets covered by this seal: 01 45 35, 03 30 00, 05 12 00, 05 50 13, 05 51 00, 05 52 00, 07 92 00 10/06/2025 Pages or sheets covered by this seal: 01 91 00.16, 26 37 13, 27 10 00, 33 82 00, 40 60 00 10/06/2025 Pages or sheets covered by this seal: 02 41 00, 03 42 13.00 10, 31 00 00, 31 11 00, 32 01 19.61, 32 11 20, 32 11 23, 32 12 13, 32 12 16.16, 32 13 13.06, 32 16 19, 32 31 13, 33 11 00, 33 40 00 -- 2 of 1704 -- INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR SYSTEM - US ARMY RESERVES 63D READINESS DIVISION 10/06/2025 Pages or sheets covered by this seal: 09 97 13.17, 09 97 13.27, 13 48 73, 23 05 93, 33 01 50.31, 33 08 55, 33 09 52, 33 52 10, 33 52 23.15, 33 56 10, 33 57 55 10/06/2025 Pages or sheets covered by this seal: 25 05 11 10/06/2025 Pages or sheets covered by this seal: 26 05 19.00 10, 26 05 48, 26 05 73, 26 08 00, 26 12 19, 26 13 13, 26 13 14, 26 20 00, 26 31 00, 26 32 15, 26 33 57, 33 71 02 10/06/2025 Pages or sheets covered by this seal: 28 31 70 -- 3 of 1704 -- INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR SYSTEM - US ARMY RESERVES 63D READINESS DIVISION PROJECT TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS 01 11 00 02/24 SUMMARY OF WORK 01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS 01 20 00 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES 01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS 01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE 01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES 01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS 01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS 01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL 01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM) 01 45 35 05/24 SPECIAL INSPECTIONS 01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS 01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS 01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION 01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS 01 78 23 05/23 OPERATION AND MAINTENANCE DATA 01 91 00.16 05/23 COMMISSIONING - MICROGRID DIVISION 02 - EXISTING CONDITIONS 02 41 00 08/22 DEMOLITION DIVISION 03 - CONCRETE 03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE 03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE CONSTRUCTION DIVISION 05 - METALS 05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL 05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS 05 51 00 08/23 METAL STAIRS 05 52 00 08/23 METAL RAILINGS DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING 07 92 00 08/23 JOINT SEALANTS DIVISION 09 - FINISHES 09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL PETROLEUM FUEL TANKS 09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL STRUCTURES DIVISION 13 - SPECIAL CONSTRUCTION 13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS EQUIPMENT PROJECT TABLE OF CONTENTS Page 1 -- 4 of 1704 -- INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR SYSTEM - US ARMY RESERVES 63D READINESS DIVISION DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR HVAC DIVISION 25 - INTEGRATED AUTOMATION 25 05 11 08/24 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS DIVISION 26 - ELECTRICAL 26 05 19.00 10 11/22 INSULATED WIRE AND CABLE 26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT 26 05 73 08/23 POWER SYSTEM STUDIES 26 08 00 11/22 APPARATUS INSPECTION AND TESTING 26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS 26 13 13 11/21 METAL-CLAD SWITCHGEAR 26 13 14 11/21 SWITCHGEAR HOUSE 26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM 26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV) SYSTEMS 26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES 26 33 57 12/21 BATTERY ENERGY STORAGE SYSTEM (BESS) 26 37 13 02/24 MICROGRID CONTROL SYSTEM DIVISION 27 - COMMUNICATIONS 27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING SYSTEM DIVISION 28 - ELECTRONIC SAFETY AND SECURITY 28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE DIVISION 31 - EARTHWORK 31 00 00 08/23 EARTHWORK 31 11 00 11/18 CLEARING AND GRUBBING DIVISION 32 - EXTERIOR IMPROVEMENTS 32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT 32 11 20 05/22 BASE COURSE FOR RIGID PAVING 32 11 23 05/22 AGGREGATE BASE COURSE 32 12 13 05/24 BITUMINOUS PRIME COATS 32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING 32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES 32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS 32 31 13 11/21 CHAIN LINK FENCES AND GATES DIVISION 33 - UTILITIES 33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS PROJECT TABLE OF CONTENTS Page 2 -- 5 of 1704 -- INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR SYSTEM - US ARMY RESERVES 63D READINESS DIVISION 33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP (NON-HYDRANT) 33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION SYSTEM (NON-HYDRANT) 33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING 33 40 00 11/21 STORMWATER UTILITIES 33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION) 33 52 23.15 11/18 POL SERVICE PIPING WELDING 33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS 33 57 55 11/

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237130)