Description
Specifications
Install Microgrid, 750kWdc PV, 750kWh
BESS, & 800kW Generator System
Contract No. W912DY19D0027
Task Order No. W912DY21F0044
US Army Reserve 63d
Readiness Division
Mountain View, CA
Final Design Submittal Draft
October 6, 2025
-- 1 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
10/06/2025
Pages or sheets covered by this seal:
01 11 00, 01 14 00, 01 20 00,
01 30 00, 01 32 01.00 10, 01 33 00,
01 35 26,01 45 00, 01 45 00.15 10,
01 50 00, 01 57 19, 01 58 00,
01 74 19, 01 78 00, 01 78 23,
07 84 00
10/06/2025
Pages of sheets covered by this seal:
01 45 35, 03 30 00, 05 12 00,
05 50 13, 05 51 00, 05 52 00,
07 92 00
10/06/2025
Pages or sheets covered by this seal:
01 91 00.16, 26 37 13, 27 10 00,
33 82 00, 40 60 00
10/06/2025
Pages or sheets covered by this seal:
02 41 00, 03 42 13.00 10, 31 00 00,
31 11 00, 32 01 19.61, 32 11 20,
32 11 23, 32 12 13, 32 12 16.16,
32 13 13.06, 32 16 19, 32 31 13,
33 11 00, 33 40 00
-- 2 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
10/06/2025
Pages or sheets covered by this seal:
09 97 13.17, 09 97 13.27, 13 48 73,
23 05 93, 33 01 50.31, 33 08 55,
33 09 52, 33 52 10, 33 52 23.15,
33 56 10, 33 57 55
10/06/2025
Pages or sheets covered by this seal:
25 05 11
10/06/2025
Pages or sheets covered by this seal:
26 05 19.00 10, 26 05 48, 26 05 73,
26 08 00, 26 12 19, 26 13 13,
26 13 14, 26 20 00, 26 31 00,
26 32 15, 26 33 57, 33 71 02
10/06/2025
Pages or sheets covered by this seal:
28 31 70
-- 3 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24 SUMMARY OF WORK
01 14 00 11/22, CHG 3: 08/24 WORK RESTRICTIONS
01 20 00 11/20, CHG 4: 08/24 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 4: 08/24 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 08/23, CHG 1: 08/24 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
01 91 00.16 05/23 COMMISSIONING - MICROGRID
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 9: 08/24 CAST-IN-PLACE CONCRETE
03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR
BELOW GRADE CONSTRUCTION
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 50 13 08/24 MISCELLANEOUS METAL FABRICATIONS
05 51 00 08/23 METAL STAIRS
05 52 00 08/23 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/23 JOINT SEALANTS
DIVISION 09 - FINISHES
09 97 13.17 05/22 THREE COAT EPOXY INTERIOR COATING OF
WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 73 05/22 SEISMIC CONTROL FOR MISCELLANEOUS
EQUIPMENT
PROJECT TABLE OF CONTENTS Page 1
-- 4 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 13 13 11/21 METAL-CLAD SWITCHGEAR
26 13 14 11/21 SWITCHGEAR HOUSE
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)
SYSTEMS
26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 33 57 12/21 BATTERY ENERGY STORAGE SYSTEM (BESS)
26 37 13 02/24 MICROGRID CONTROL SYSTEM
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 11 23 05/22 AGGREGATE BASE COURSE
32 12 13 05/24 BITUMINOUS PRIME COATS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 13.06 05/20 PORTLAND CEMENT CONCRETE PAVEMENT FOR
ROADS AND SITE FACILITIES
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 31 13 11/21 CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 01 50.31 02/20 LEAK DETECTION FOR FUELING SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
-- 5 of 1704 --
INSTALL MICROGRID, 750kW PV, 750kWh BESS, & 800kW GENERATOR
SYSTEM - US ARMY RESERVES 63D READINESS DIVISION
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
33 40 00 11/21 STORMWATER UTILITIES
33 52 10 11/18, CHG 1: 11/20 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 56 10 05/19, CHG 1: 11/20 FACTORY-FABRICATED FUEL STORAGE TANKS