Description
PR #: 2126406Y6164A81010
PERFORMANCE WORK STATEMENT UHP Water Jet Blasting
November 5, 2026
PERFORMANCE WORK STATEMENT (PWS)
FOR
Ultra High-Pressure Water Jet Blasting (36,000 to 40,000 PSI Services)
November 5, 2026
1.1 BACKGROUND
This is a non-personal services contract to provide Ultra-High Pressure (UHP) Water Jet
Blasting Services at the U.S. Coast Guard Yard, Curtis Bay, Baltimore, MD, where performance
shall take place on both dry-docked vessels and internally on pier-side vessels. It is anticipated
that these services will be required due to the high volume of vessels scheduled for Yard
Availabilities, which include, but are not limited to, the 327’ Eagle, 270’ Medium Endurance
Cutters, 225’ Seagoing Buoy Tenders, 210’ Medium Endurance Cutters, 175’ Coastal Buoy
Tender, 154’ Sentinel-Class, 140’ Ice Breakers, 110’ and 87’ Patrol Boats, 75’ and 65’
Tender/Barge configurations, as well as Foreign Military Sales or Other Government Agency
(OGA) vessels. The Government shall not exercise any supervision or control over the contract
service providers performing the services herein; such contract service providers shall be
accountable solely to the Contractor who, in turn, is responsible to the Government.
1.2 SCOPE
The scope of this Performance Work Statement (PWS) encompasses the provision of Ultra-
High Pressure (UHP) water jet blasting and supplementary vacuum-assisted mechanical/hand
tooling services to safely and efficiently remove coatings and contaminants from U.S. Coast
Guard vessels. The Contractor must provide labor, materials, administration, and quality control
necessary to perform these services on both aluminum and steel substrates. This notification
will be issued in the form of a task order by the contracting officer. All work will be authorized by
task orders, detailing the location and amount services to be provided.
Limits and Range of Work:
• Target Areas: Exterior and interior vessel surfaces, including underwater bodies,
freeboards, superstructures, stacks, weather decks, crane or king posts, handrails,
ventilation, exterior bulkheads, overheads, exterior appendages, and attached metal
surfaces that adhere to the vessel.
• Standards: Primary coating removal must achieve the WJ-2/L standard via water jet
blasting on accessible areas, with an allowance of up to 5 percent for physically
inaccessible areas.
• Clearance Zones & Secondary Tooling: To prevent damage, UHP water blasting must
maintain an approximate six-inch clearance from sensitive areas (such as hoses, piping,
port lights, and electronic devices). These inaccessible areas or complex geometries
must be cleaned using vacuum-assisted mechanical power tools to the SSPC-SP11
standard. If SSPC-SP11 cannot be achieved, mechanical tooling to SSPC-SP3 or hand
tooling to SSPC-SP2 must be used.
• Volume Estimation: Mechanical power tooling services are estimated at a ratio of 10
percent of the total requested surface area for superstructure and weather deck task
orders.
-- 1 of 20 --
PR #: 2126406Y6164A81010
PERFORMANCE WORK STATEMENT UHP Water Jet Blasting
November 5, 2026
• Response & Compliance: Services must be initiated within 72 hours of task order
notification. The Contractor must maintain an active SSPC QP1 certification and adhere
strictly to federal, state, local, and Coast Guard regulations (including environmental,
fire, safety, and security policies)
1.3 OBJECTIVE
The primary objective of this contract is to secure environmentally safe, rapid-response surface
preparation and coating removal services for U.S. Coast Guard vessels utilizing Ultra-High
Pressure (UHP) water blasting.
By employing UHP water blasting over traditional grit blasting, the Coast Guard aims to achieve
a highly cost-effective and low-impact coating removal process that effectively strips
contaminants (such as salt and grease) without pounding them into the substrate or creating
hazardous dust clouds. The desired outcome is to consistently produce clean, bare aluminum or
steel surfaces prepared to rigorous SSPC standards. These prepared surfaces will be directly
utilized to facilitate immediate vessel maintenance, preservation, and recoating operations,
thereby maintaining the operational readiness of the fleet while strictly minimizing yard lay days
and environmental liabilities.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied
with in order to meet the requirements of this contract:
• Coast Guard Coatings and Color Manual COMDTINST M10360.3C
• 29 CFR 1915 Occupational Safety and Health Standards for Shipyard Employment
• Coast Guard Yard Quality Assurance Desk Guide
• ISO 14001 Environmental Management System Manual
• Yard National Pollution Discharge Elimination System (NPDES) Permit
• Yard 12SW Storm water Permit
• Yard Title V Operating Air Permit
• Yard Sanitary Wastewater Discharge Permit
• Yard Oil Operations Permit
• All applicable Federal laws, regulations, executive orders, standards, permits, codes, and
requirements; all applicable laws and regulations of the State of Maryland; and all applicable
ordinances, codes, permitting requirements, and regulations of the local jurisdiction in which
the work is performed.
1.4.2 Reference Documents
The following documents may be helpful to the Contractor in performing the work described in
this document:
• SFLC Standard Specification 6310
• SFLC Standard Specification 0000
• Coast Guard Coatings and Color Manual COMDTINST M10360.3C
• USCG Safety and Environmental Health Manual (COMDTINST M5100.47 series)
-- 2 of 20 --
PR #: 2126406Y6164A81010
PERFORMANCE WORK STATEMENT UHP Water Jet Blasting
November 5, 2026
1.5 PERFORMANCE REQUIREMENTS SUMMARY.
This contract includes a Performance Requirements Summary (PRS) at PWS 9.0. The PRS
plays an integral role in the administration of the contract. In addition to any applicable
inspection clauses or other related terms and conditions contai…