Skip to content

Open for responses

*UPDATED PoP DATES* USCG TRACEN PETALUMA MONTHLY BOILER MAINTENANCE

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
61200PR270000061
NAICS
238220
PSC
J045
Set-aside
Small Business Set Aside - Total
Posted
November 17, 2026
Response due
December 7, 2026
Place of performance
Petaluma, CA

Description

PR # 61200PR270000061 STATEMENT OF WORK LAST UPDATED: 11/13/2026 STATEMENT OF WORK (SOW) FOR MONTHLY BOILER MAINTENACE AND CHEMICAL TESTING 1.0 GENERAL 1.1 BACKGROUND U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road Petaluma; CA 94952 is the Coast Guard’s largest West Coast Training Center. Our graduates are the latest chefs, medics, storekeepers, yeoman, information systems technicians, electronics technicians, operations specialists, and aviation survival technicians (AST). We are also home to the Coast Guard Leadership Development Center’s Chief Petty Officer Academy. 1.2 SCOPE The requirement of this contract is for the contractor to furnish all labor, tools, materials, equipment, supplies, services, supervision, and all other items necessary to provide comprehensive boiler chemical testing, preventative water treatment, and scale/corrosion control on eleven (11) hot water loops, one (1) steam boiler, and associated cooling tower systems located at USCG TRACEN Petaluma. The contractor is responsible for all phases of chemical water treatment, system monitoring, periodic inspections, inventory control, and waterside efficiency assurance. 1.3 OBJECTIVE The service provider shall provide all labor, equipment, materials, vehicles, and appliances necessary to perform all operations in connection with routine water testing, scale and corrosion mitigation, equipment calibration, and chemical water treatment across facility heating loops, steam boilers, and cooling systems at U.S. Coast Guard (USCG) Training Center (TRACEN) Petaluma located at 599 Tomales Road, Petaluma, CA 94952-4154. 1.4 APPLICABLE DOCUMENTS 1.4.1 Reference Documents The following documents may be helpful to the Contractor in performing the work described in this document: • 29 CFR Part 1910 - Occupational Safety and Health Standards (General Industry) • 29 CFR Part 1910.1200 - Hazard Communication Standard (Safety Data Sheets / Chemical Safety) • Federal Acquisition Regulation (FAR) 4.1103 - System for Award Management 2.0 SPECIFIC REQUIREMENTS/TASKS 2.1 TASK ONE. ROUTINE MONTHLY ONSITE SERVICE AND WATER TESTING • Provide one (1) onsite service visit per calendar month to conduct testing, monitoring, and chemical servicing of eleven (11) hot water loops and one (1) steam boiler. • Perform standard chemical testing on boiler water, feedwater, condensate, and closed loop systems (evaluating pH, conductivity, dissolved solids, inhibitor levels, and alkalinity). • Provide and maintain access to an online portal for digital service reporting, data trending, and continuous operational logging. -- 1 of 5 -- PR # 61200PR270000061 STATEMENT OF WORK LAST UPDATED: 11/13/2026 List of boilers locations: 2.2 TASK TWO. SCALE AND CORROSION INHIBITOR APPLICATION • Furnish and apply chemical water treatment products engineered to retard scale and corrosion in the steam boilers. • Furnish and apply corrosion inhibitor to closed hydronic loops should water loss occur from the systems. • Provide supplemental corrosion inhibitors to treat system water loss up to a maximum volume of 10% total system capacity per calendar year at no additional cost to the Government. 2.3 TASK THREE. FEED EQUIPMENT CALIBRATION AND MAINTENANCE • Check, clean, calibrate, and service all chemical control, dosing, and feeding equipment. • Check, inspect, and verify the operational integrity of all associated water treatment control hardware and monitoring probes. 2.4 TASK FOUR. INVENTORY CONTROL AND CONTAINER DISPOSAL • Maintain strict inventory control of all onsite chemical reserves, ensuring adequate supplies are always maintained. • Promptly remove all empty chemical drums, containers, and packaging from Government property and dispose of them legally in full compliance with applicable environmental regulations. 2.5 TASK FIVE. COOLING TOWER AND WATERSIDE INSPECTIONS -- 2 of 5 -- PR # 61200PR270000061 STATEMENT OF WORK LAST UPDATED: 11/13/2026 • Inspect facility cooling towers during monthly service visits for operational anomalies, cleanliness, and safety concerns. • Perform waterside inspections of boilers and condensers during scheduled facility shutdowns (provided sufficient advance notice is given by the Government). • Provide a comprehensive written inspection report following open-vessel inspections, including color photographic evidence of waterside equipment conditions. 2.6 TASK SIX. LABORATORY ANALYSIS AND TECHNICAL SAFETY TRAINING • Provide certified laboratory analyses for backup diagnostic support whenever anomalous conditions, severe contamination, or baseline verification is required. • Conduct chemical safety and operational handling training for onsite USCG facility maintenance personnel. • Participate in annual management reviews conducted at the discretion of TRACEN Petaluma facility engineering personnel. • Guarantee that the present degree of operating efficiency of the cooling and heating systems will be maintained while under the contractor's program; should fouling or loss of efficiency occur as a result of chemical treatment failure, the contractor shall clean the affected systems at no additional cost to the Government. 3.0 CONTRACTOR PERSONNEL 3.1 QUALIFIED PERSONNEL The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. 3.2 CONTINUITY OF SUPPORT The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor must ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor must provide e-mail notification to the Government Technical Representative prior to employee absence. Otherwise, the Contractor must provide a fully qualified replacement. 3.3 EMPLOYEE IDENTIFICATION 3.3.1 Contr…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 238220