Skip to content

Open for responses

USCG District Northeast Snow Plowing and Ice Management

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
70ZL1427Q0000002
NAICS
561730
PSC
S218
Set-aside
No Set aside used
Posted
November 24, 2026
Response due
December 4, 2026
Place of performance
Boston, MA

Description

DEPARTMENT OF HOMELAND SECURITY UNITED STATES COAST GUARD PERFORMANCE WORK STATEMENT (PWS) SNOW PLOWING AND ICE MANAGEMENT SERVICES UNITED STATES COAST GUARD NORTHEAST DISTRICT BASE BOSTON COMMANDING OFFICER UNITED STATES COAST GUARD 408 ATLANTIC AVE, BOSTON, MA 02110 -- 1 of 6 -- 1 | P a g e PERFORMANCE WORK STATEMENT (PWS) Snow Plowing and Ice Management Services U.S. Coast Guard District Northeast — John Foster Williams (JFW) Building 1. INTRODUCTION / BACKGROUND The Contractor shall provide comprehensive snow plowing, snow clearing and ice management services for the U.S. Coast Guard (USCG) District Northeast at the John Foster Williams (JFW) Building, located at 408 Atlantic Ave, Boston, MA 02110. The objective of this requirement is to maintain safe, passable, and accessible vehicle and pedestrian routes within the designated service areas during winter weather conditions. 2. SCOPE OF WORK AND PERFORMANCE REQUIREMENTS a. General Requirements: The contractor shall provide all personnel, materials, supplies, equipment, supervision, vehicles, fuel, and incidental items necessary for managing and performing snow plowing, snow clearing, and ice management services in accordance with this PWS. The Contractor shall continuously monitor weather conditions throughout the period of performance and shall initiate services without waiting for Government notification when any of the following conditions occur within the designated service areas: 1. Snow accumulation reaches 2 inches or more; or 2. The Contracting Officer Representative (COR) or designated Government point of contact (POC) requests services that are within the established scope of this contract. b. Service Areas: The Contractor shall service the areas identified below (see Enclosure 1, Service Area Map for reference).  The road/causeway leading up to the entrance gate  The access road leading to the parking lot  The entire parking lot  The front entrance area of the building, to include sidewalks and stairs  The open area along the side of the building c. Snow Clearing and Snow Relocation: The Contractor shall plow, shovel, blow, or otherwise remove snow as appropriate for access conditions to all service areas. The Contractor shall not push, pile, or discharge snow in a manner that blocks entrances, pedestrian routes, accessible parking, fire hydrants, drainage features, parked vehicles, or emergency access. The Contractor shall relocate snow only to Government-designated on-site storage locations. The Contractor shall obtain Government direction before using a storage that has not been designated for that purpose. d. Deicing and Ice Management: The Contractor shall apply salt, sand, or other appropriate deicing material to all service areas to mitigate ice and traction hazards. e. Completion Deadline: All services shall be completed no later than 6:30 AM. f. Proactive Mitigation: During continuous snowfall events that continues through 6:30 AM, the Contractor shall perform the following:  An initial pass before morning commute hours to provide safe access to the service areas. -- 2 of 6 -- 2 | P a g e  Periodic clearing during extended storms when accumulations reach an agreed threshold.  A final cleanup after the storm ends, including widening, edge cleanup and treatment. g. After-Hours Operations: The Contractor shall respond promptly when contacted by the designated USCG representative to perform after-hours plowing and sanding/salting. 3. HOURS OF OPERATION, LOCATION, AND POINTS OF CONTACT a. Standard & Weekend Hours: Because the USCG facility operates 24 hours a day, 7 days a week, 365 days a year, the Contractor shall provide coverage seven days a week, including Saturdays and Sundays, or as otherwise directed by the COR. b. Federal Holidays: Service is required on all Federal Holidays due to continuous 24/7/365 facility operations, unless otherwise specified by the COR. c. Adjusted Work Schedules: If circumstances require the Contractor to request an adjusted work schedule different from the requirements in Sections 3.a and 3.b, the Contractor must submit a written request to the COR at least 24 hours prior to the requested change. If the requested change takes effect on a Monday, the written request must be submitted to the COR prior to 9:00 AM on the preceding Friday. d. Place of Performance: John Foster Williams (JFW) Building 408 Atlantic Ave Boston, MA 02110 e. Government Point of Contact (POC): The Government POC will be available to coordinate site access and answer operational questions. The Contractor shall immediately notify the POC of conditions that delay, prevent, or materially affect performance.  POC Name: SKC Ebenezer Oforiafram  Email: ebenezer.n.oforiafram@uscg.mil  Phone: (571) 610-4520 4. PERIOD OF PERFORMANCE The Period of Performance for this contract is December 7, 2026, through May 31, 2027. 5. CONTRACTOR PERSONNEL 5.1 Contract Manager a. Designation: The Contractor shall designate a Contract Manager, and at least one alternate to act in the manager's absence, in writing to the Contracting Officer prior to contract start. The Contract Manager is responsible for overseeing the timely performance and completion of all work under this PWS. b. Authority: The Contract Manager or designated alternate shall have full authority to act on behalf of the Contractor on all daily operational matters and shall be reachable throughout each active service event. c. Language Proficiency: The Contract Manager and all alternates must be able to read, write, speak, and understand English fluently. d. After-Hours & Verification Check-Ins: The Contract Manager must notify the USCG Command Center at (617) 603-8555 prior to performing service during after-hours windows. After-hours windows are weekdays between 4:00 -- 3 of 6 -- 3 | P a g e PM and 6:00 AM and weekends and Federal holidays from 4:00 PM Friday through 6:00 AM Monday, including all Federal holidays. The Contractor shall also notify the Comm…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561730