Skip to content

Open for responses

USCG Mission System Integration Lab Packing, Rigging, Transportation, Offloading, and Unpacking of Office, Computers, Electronic Equipment, Heavy Equipment, and Mission System Assets

HOMELAND SECURITY, DEPARTMENT OF

Notice type
Sources Sought
Solicitation #
RFI_FY27001
NAICS
484210
PSC
V112
Set-aside
No Set aside used
Posted
November 17, 2026
Response due
December 4, 2026
Place of performance
0, MD

Description

STATEMENT OF WORK (SOW) FOR USCG Mission System Integration Lab Packing, Rigging, Transportation, Offloading, and Unpacking of Office, Computers, Electronic Equipment, Heavy Equipment, and Mission System Assets RFI_FY270001 1.0 GENERAL Background The purpose of this Statement of Work is to obtain contractor support for the packing, rigging, loading, transportation, offloading, and unpacking of equipment, furnishings, and related assets from the USCG Mission System Integration Lab (MSIL) located in a secure facility at Naval Air Station Patuxent River located at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670 and move it to another designated facility approximately 240 miles away at 112 Corporate Dr. in Elizabeth City North Carolina 27909. The MSIL occupies approximately 2000 square feet of office and equipment space on the second floor of a secure facility located Naval Air Station Patuxent River, MD. The space contains multiple equipment racks populated with electronic equipment, radios, servers, flat screen televisions, large mock-ups, office furniture, and heavy equipment or large assets weighing up to 2,000 pounds. The Contracting Officer’s Representative (COR) requires professional relocation services to safely pack, protect, rig, remove, transport, offload, unpack, and place these items at a destination facility in North Carolina. Due to the location of the office space and the size and weight of certain items, the contractor must provide specialized equipment capable of reaching the second-floor access point and safely removing large and heavy equipment from the building. The Contracting Officer intends to award a Firm Fixed Price contract for this effort. Scope The contractor must provide all labor, supervision, materials, tools, packing supplies, rigging equipment, lift equipment, vehicles, transportation, and incidentals necessary to complete the relocation. Provision and operation of special equipment necessary to reach the second-floor access point of the building. Access to the building for moving oversized items will be through a removable exterior wall section on the second floor, approximately 79 inches high by 46 inches wide. Certain large and heavy assets may require specialized hoisting equipment capable of operating on soft/uneven/unpaved ground able to access the second floor and remove the large/heavy items from the building. Work includes, but is not limited to: Pre-move coordination, site assessment, and planning. Packing and protection of electronic equipment, radios, servers, televisions, office furniture, mock-ups, and related assets. Safe rigging, lifting, lowering, removal, and loading of large or heavy equipment weighing up to 2,000 pounds. Movement of items from a second-floor office location within a secure facility. Loading items onto contractor-provided transportation vehicles. Transporting items approximately 240 miles to the destination facility in North Carolina in vehicles that are enclosed to protect and secure the contents from the elements and theft. Offloading items at the destination facility. Unpacking and placing items in designated locations as directed by the COR. Removal and disposal of packing materials and debris generated by the contractor. Packing material and debris generated by contractor must be disposed of at an approved offsite location. Submit a r to the COR for approval. OBJECTIVE The government is looking to obtain contractor support for the packing, rigging, loading, transportation, offloading, and unpacking of equipment, furnishings, and related assets from the USCG Mission System Integration Lab (MSIL) located in a secure facility at Naval Air Station Patuxent River located at 48192 Switzer Road, BLDG 2191, Room F-201, Patuxent River, MD 20670 and move it to another designated facility approximately 240 miles away at 112 Corporate Dr. Elizabeth City North Carolin 27909. The period of performance is not to exceed 90 days from anticipated contract award date of 01 March, 2027. SPECIFIC REQUIREMENTS/TASKS 2.1 TASK ONE. Pre-Move Coordination, Site Assessment, and Planning The contractor must coordinate with the COR before the move to confirm requirements, schedule, access procedures, equipment needs, site constraints, second-floor access requirements, and heavy equipment removal requirements. 2.1.1 The contractor must participate in a pre-move planning meeting with the COR. 2.1.2 The contractor must review the types and approximate quantities of items to be moved. 2.1.3 The contractor must conduct or participate in a site assessment, if authorized by the COR, to determine access limitations, second-floor removal requirements, floor loading considerations, exterior access constraints, staging areas, and lift or rigging equipment requirements. 2.1.4 The contractor must identify required packing materials, lift equipment, rigging equipment, carts, dollies, pallets, crates, protective coverings, and vehicle requirements. 2.1.5 The contractor must identify specialized equipment required to reach the second-floor access point and remove large equipment weighing up to 2,000 pounds. 2.1.6 The contractor must identify staffing requirements, including qualified rigging, lift, or heavy equipment operators qualified and licensed in accordance with the state of performance. 2.1.7 The contractor must coordinate access requirements for both origin and destination facilities. 2.1.8 The contractor must identify any COR-furnished information or support needed to complete the work. 2.1.9 The contractor must submit a move plan for COR review and approval prior to work. The move plan must include, at a minimum: Proposed move schedule. Staffing plan. Packing and protection approach. Rigging, lifting, hoisting, or heavy equipment removal approach. Description of specialized equipment to be used to reach the second-floor access point. Description…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 484210