What this opportunity is
The Department of Defense is soliciting competitive bids for Voyage Repair Availability services for the USNS SACAGAWEA (T-AKE 2), with work to be performed in South Korea. This opportunity is not set aside for small businesses, but it is suitable for contractors authorized to operate in the region. Interested parties must monitor SAM.gov for amendments and are required to register in SAM.gov to be eligible for award, making it essential for businesses to track the solicitation closely rather than submit bids immediately.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
1
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for monitoring and
evaluating the contractor's performance for each of the objectives listed in the Performance Work Statement (PWS).
The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is
performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. To provide a quality surveillance strategy for the USNS
SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) from 15 Dec 2026 – 6 Jan 2027. The primary intent
of the plan is to provide a basis of the Principal Port Engineer (PPE) / Port Engineer (PE) evaluation of performance
quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the PPE/PE
and Contracting Officer a productive mechanism to preclude major deficiencies in performance, provide input for
annual contractor past performance evaluations.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed
against original due dates and milestones established for the contract.
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the
deliverables detailed in the contract and the Quality Control Plan (QCP), if required by the contract, for the required
content, quality, timeliness, and accuracy.
c. Past Performance - In addition to any schedule and deliverables of performance discussed above, pursuant
to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to
standards of good workmanship. Additionally, the Government will assess the contractor’s adherence to contract
schedules including the administrative aspects of performance, the contractor’s history of reasonable and
cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the
interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will
include, but not be limited to, random or planned sampling, inspections and validated customer complaints.
4. Performance Measurement: Performance of the contractor’s performance will be measured utilizing the
Performance Requirements Summary (PRS) below.
Performance Requirements Summary
Performance
Element
Performance
Requirement
Surveillance
Method Frequency Acceptable
Quality Level
Contractor Quality
Assurance Plan
and Process
Control
Procedures
QC activities,
inspections, and
corrective actions
completed as required
by the plan.
Inspection by the
PPE/PE
As required for
corrective actions
100%
Compliance
with the
contractor plan
Performance
Element
Performance
Objective
Surveillance
Method Frequency Acceptable
Quality Level
Contract
Deliverables
Contract deliverables
furnished as prescribed
in the PWS, Work Item
attachments, CDRLs,
etc., as applicable.
Inspection by the
PPE/PE
100% inspection of
all contract
deliverables.
>95% of
deliverables
submitted timely
and without
rework required.
-- 1 of 2 --
2
Overall Contract
Performance
Overall contract
performance of
sufficient quality to
earn a Satisfactory (or
higher) rating in the
PPE/PE’s final report
on Contractor
Performance
Assessment by the
PPE/PE Project Completion
All performance
elements rated
Satisfactory (or
higher)
Note:If performance is within acceptable levels, it will be considered to be satisfactory.If not, overall
performance may be considered unsatisfactory.
5. Incentives/Disincentives:
The PPE/PE makes a final evaluation report on Contractor Performance (CPARS or other annual report). The
contractor’s failure to achieve satisfactory performance under the contract, reflected in the PPE/PE’s final report,
may result in termination of the contract and may also result in the loss of future Government contracts.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must
reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based
upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any
further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to
provide quality products in a timely manner since the Government can require the Contractor, at no additional cost,
to replace or correct work that fails to meet contract requirements.
-- 2 of 2 --