Skip to content

Open for responses

USNS SACAGAWEA (T-AKE 2) VRA KR

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
N6264927RK001
NAICS
336611
PSC
J999
Set-aside
No Set aside used
Posted
November 23, 2026
Response due
December 3, 2026
Place of performance
Changwon (Chinhae), KR-48

What this opportunity is

The Department of Defense is soliciting competitive bids for Voyage Repair Availability services for the USNS SACAGAWEA (T-AKE 2), with work to be performed in South Korea. This opportunity is not set aside for small businesses, but it is suitable for contractors authorized to operate in the region. Interested parties must monitor SAM.gov for amendments and are required to register in SAM.gov to be eligible for award, making it essential for businesses to track the solicitation closely rather than submit bids immediately.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

1 QUALITY ASSURANCE SURVEILLANCE PLAN Purpose: To ensure that the Government has an effective and systematic method of surveillance for monitoring and evaluating the contractor's performance for each of the objectives listed in the Performance Work Statement (PWS). The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion. 1. Critical performance processes and requirements. To provide a quality surveillance strategy for the USNS SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) from 15 Dec 2026 – 6 Jan 2027. The primary intent of the plan is to provide a basis of the Principal Port Engineer (PPE) / Port Engineer (PE) evaluation of performance quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the PPE/PE and Contracting Officer a productive mechanism to preclude major deficiencies in performance, provide input for annual contractor past performance evaluations. 2. Performance Standards a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract. b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy. c. Past Performance - In addition to any schedule and deliverables of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship. Additionally, the Government will assess the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer. 3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, inspections and validated customer complaints. 4. Performance Measurement: Performance of the contractor’s performance will be measured utilizing the Performance Requirements Summary (PRS) below. Performance Requirements Summary Performance Element Performance Requirement Surveillance Method Frequency Acceptable Quality Level Contractor Quality Assurance Plan and Process Control Procedures QC activities, inspections, and corrective actions completed as required by the plan. Inspection by the PPE/PE As required for corrective actions 100% Compliance with the contractor plan Performance Element Performance Objective Surveillance Method Frequency Acceptable Quality Level Contract Deliverables Contract deliverables furnished as prescribed in the PWS, Work Item attachments, CDRLs, etc., as applicable. Inspection by the PPE/PE 100% inspection of all contract deliverables. >95% of deliverables submitted timely and without rework required. -- 1 of 2 -- 2 Overall Contract Performance Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the PPE/PE’s final report on Contractor Performance Assessment by the PPE/PE Project Completion All performance elements rated Satisfactory (or higher) Note:If performance is within acceptable levels, it will be considered to be satisfactory.If not, overall performance may be considered unsatisfactory. 5. Incentives/Disincentives: The PPE/PE makes a final evaluation report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the PPE/PE’s final report, may result in termination of the contract and may also result in the loss of future Government contracts. For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken. In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements. -- 2 of 2 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 336611