Open for responses
V22 Assembly Hardware
DEPT OF DEFENSE
Notice type
Combined Synopsis/Solicitation
Solicitation #
N6852027Q1003
NAICS
334515
PSC
6625
Set-aside
Small Business Set Aside - Total
Posted
November 16, 2026
Response due
November 24, 2026
Place of performance
Cherry Point, NC
Description
STATEMENT OF WORK
V-22 OTPS 8 UPGRADE LOAD BOX ASSEMBLY AND TEST
1.0 Objective
This Statement of Work (SOW) establishes the requirement for the build-to-print assembly, contractor testing, packaging, and delivery of forty-eight (48) copies each of the load box assemblies required for the V-22 OTPS 8 Upgrade for use on the Navy’s Consolidated Automated Support System (CASS) family of Automated Test Equipment (ATE).
2.0 Applicable Documents
2.1 Government Documents
Attachment 1 – MIL-PRF-32070A, Performance Specification for Test Program Sets
3.0 Requirements
3.1 General
The contractor shall provide all labor, supervision, assembly, testing, documentation, packaging, and delivery necessary to support Fleet Readiness Center East (FRC-East), Cherry Point, NC, Code ATS10, in execution of the OTPS Manufacturing and Assembly project as assigned by Naval Air Systems Command (NAVAIR) Headquarters, PMA-275.
The contractor shall assemble and test, in accordance with the Government-furnished Technical Data Package (TDP), forty-eight (48) copies each of the load box assemblies required for the V-22 OTPS 8 Upgrade. These assemblies will be used on the Navy’s CASS family of ATE to test the functionality of the MAO DSIU and FMU Unit Under Test (UUT).
3.2 Program Management
The contractor shall provide monthly status reports throughout contract performance. Status reports shall address, at a minimum:
Assembly progress
Testing status
Material issues
Schedule status
Problems encountered
Corrective actions taken or planned
The purpose of the monthly reporting requirement is to provide visibility into contract execution and support timely resolution of issues affecting schedule or performance.
3.3 Assembly Requirements
The Government shall furnish the parts and material necessary for assembly of the required load box hardware. Upon receipt, the contractor shall review Government-furnished material for completeness and suitability for assembly of the required end items.
The contractor shall assemble the end items identified in Table 1 in accordance with the Government-furnished TDP.
Table 1. OTPS Load Box Assemblies
Nomenclature Part Number Quantity
Load Box Assembly, WLB1 18D90975-1 48
Load Box Assembly, WLB2 18D90976-1 48
Load Box Assembly, WLB3 18D90977-1 48
The contractor shall:
a. Assemble all load box hardware in accordance with the TDP.
b. Verify completeness and workmanship of all assemblies.
c. Identify and report any material shortages, defects, or drawing discrepancies to the Government.
d. Red-line any drawing defects identified during production and provide such red-lines to FRC-East for correction.
e. Ensure completed assemblies are ready for Government verification and final acceptance upon delivery.
3.4 Period of Performance
The contractor shall complete all work required under this contract no later than 180 calendar days after contract award (ACA).
3.5 Delivery
All completed assemblies, associated test documentation, and required deliverables shall be delivered to Fleet Readiness Center East, Cherry Point, NC, no later than 180 calendar days after contract award (ACA).
Delivery shall be made to:
Commanding Officer N65923
Fleet Readiness Center East Cherry Point
Attn: To Be Provided with a Contract Award
Cunningham Street, Bldg. 148 Bay A
Cherry Point, NC 28533
To facilitate Government inventory and verification, the contractor shall deliver the completed end items in sets of ten (10), or as otherwise coordinated with the Government.
3.5.1 Packing Instructions
Each hardware set, consisting of the items identified in paragraph 3.3, shall be packaged in one (1) tri-wall cardboard box. Packaging shall be in accordance with normal industry standards and shall provide adequate protection during handling and shipment.
3.6 Contractor Testing
Prior to delivery, the contractor shall perform manual and/or automated wiring ring-out testing on all wired assemblies produced under this contract. Testing shall verify wiring continuity, correct interconnection, and conformance to the TDP.
The contractor shall provide documented evidence of all testing performed. Test documentation shall include, at a minimum:
a. Identification of the item or assembly tested
b. Description of the tests performed
c. Test conditions
d. Results of all testing
e. Identification of any discrepancies and the corrective actions taken
All test documentation shall accompany the complete hardware at the time of delivery.
3.7 Quality Assurance Program
Upon contract award, the contractor shall maintain a documented quality assurance process that meets contract requirements and program objectives and supports delivery of defect-free assemblies. The quality system shall include procedures, planning, records, and internal auditing sufficient to ensure effective quality control. ISO 9000 compliance shall be considered acceptable for purposes of this contract.
4.0 Government Furnished Information (GFI)
The Government shall provide the contractor with the Technical Data Package (TDP) identified in Section 3.0. The TDP shall be provided on DVD-ROM upon contract award.
Note: Any drawing defects identified by the contractor during assembly or testing shall be red-lined and submitted to FRC-East for correction.
5.0 Government Furnished Material (GFM)
The Government shall provide the parts and material required to assemble the end items identified in Table 1. The contractor shall review all Government-furnished material for completeness sufficient to assemble forty-eight (48) copies each of the required end items.
6.0 Government Inspection and Final Acceptance
All work performed, materials delivered, and data submitted under this contract shall be made available for Government inspection and review by the TPOC via DD250.
The hardware assemblies identified in Table 1 shall be inventoried and verified by FRC-East personnel up…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 334515
Test Equipment Modernization
DEPT OF DEFENSE · Sources Sought · due November 24, 2026
V22 Assembly Hardware
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 24, 2026
VERIFICATION STAND
DEPT OF DEFENSE · Solicitation · due November 19, 2026
FOPR for F-16 AAGs for the Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV)
DEPT OF DEFENSE · Solicitation · due January 19, 2027
66--TESTER,AVIATION LIFE S
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
Radio Detection Kit with Accessories - No Alternatives
ENERGY, DEPARTMENT OF · Solicitation · due November 23, 2026