Skip to content

Open for responses

Vent Hood Services

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
FA483027Q0004
NAICS
561790
PSC
J073
Set-aside
Small Business Set Aside - Total
Posted
October 22, 2026
Response due
November 24, 2026
Place of performance
0, GA

What this opportunity is

The Department of Defense is soliciting a small business set-aside for vent hood cleaning services at Moody Air Force Base, GA, under NAICS 561790. The contract requires the contractor to provide all labor, equipment, and materials necessary to clean kitchen hoods and duct systems in compliance with NFPA 96 standards. This opportunity is suitable for small businesses with expertise in non-personal services related to kitchen exhaust systems. Interested parties should note that this is a solicitation notice, indicating they should prepare to submit bids.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Page 1 of 8 RFQ No.: FA483027Q0004 Contract No.: FA4830- Contract Title: Clean Kitchen Hoods and Ducts CUI CUI 23RD CIVIL ENGINEER SQUADRON STATEMENT OF WORK CLEAN KITCHEN HOODS AND DUCTS Dated 1 April 2026 23rd Contracting Squadron Moody AFB GA -- 1 of 8 -- Page 2 of 8 RFQ No.: FA483027Q0004 Contract No.: FA4830- Contract Title: Clean Kitchen Hoods and Ducts CUI CUI CLEAN KITCHEN HOODS AND DUCTS STATEMENT OF WORK (SOW) 1. DESCRIPTION OF SERVICES. The Contractor shall provide services non-personal consisting of furnishing all labor, equipment, materials and related items, and performing all operations necessary to clean hoods and duct systems as cited in this statement of work. This is to include, but not limited to, such procedures as using a power jet washer, hand scraping, and hand wiping. Hood and duct cleaning shall meet the requirements of National Fire Protection Association NFPA 96, paragraph 12.6. This requirement is for Moody AFB GA and Grassy Pond annex. 1.1. Specific Tasks. The following is a general outline of the primary features of the work to be performed. This outline is intended only to establish the broad scope of the work and does not in any way limit the responsibility of the Contractor who shall be required to perform all operations necessary to meet the requirements as established in this SOW. 1.1.1. Clean all grease and residue accumulation off the hood and ducting systems. This cleaning includes the metal hood section, ducting, vents, fans, louvers, filters, bates and exterior walls, roofs, etc., where systems exhaust to the outside. 1.1.2. All surfaces of the hood, ducts and associated fans shall be cleaned to bare metal. Contractors shall be required to disassemble the fan shrouds as necessary to clean the fan. After cleaning and inspection, the fan shrouds shall be replaced as they were prior to being disassembled. 1.1.3. The Contractor shall provide and install a temporary shroud, connected to the outside of the hood, on all accessible sides, and shall extend to the floor. The shroud shall be taped to the walls and hood surfaces during the cleaning operation. The shroud shall be installed so that it minimizes the amount of debris and water, which could splash onto adjacent equipment and walls. When the pressure washing and cleaning operation is complete, the shroud and tape shall be removed and any tape residue, which may remain on the walls or hood surfaces, shall be removed and cleaned. 1.1.4. The Contractor shall provide protection to cooking equipment from falling debris as well as clean any debris having fallen on the floor, on the equipment or having splashed onto any nearby equipment or walls. Prior to leaving the facility it shall be returned to the level of cleanliness it was before work started. 1.1.5. At the start of the cleaning, electrical switches, detecting devices, and system components shall be locked, pinned, protectively covered, and/or sealed to prevent accidental activation. When cleaning procedures are completed, all system components having been pinned, sealed, etc., shall be returned to an operable state. The Contractor shall be responsible for servicing the fire suppression systems at no additional cost to the Government, in the event of a discharge -- 2 of 8 -- Page 3 of 8 RFQ No.: FA483027Q0004 Contract No.: FA4830- Contract Title: Clean Kitchen Hoods and Ducts CUI CUI caused by the Contractor. The Contractor shall be responsible for cleaning up all residues from a discharge. 1.1.6. The Contractor shall wait until the hood and duct system has been inspected and accepted to reinstall any components of the system, including fan shrouds, which were removed to facilitate cleaning. 1.1.7. Flammable solvents or other flammable desired aids shall not be used. 1.1.8. The Contractor must contact the Fire Department immediately upon completion of hood and duct cleanings for inspection and quality assurance purposes In Accordance With (IAW) the Air Force Occupational Safety, Fire and Health Standards (DAFMAN 91-203), paragraph 4.4.2.3. 2. CLEANING SCHEDULE. The hoods shall all be cleaned q uarterly and semi-annually as shown in Table 1 below. The Contractor shall contact the Quality Assurance Inspection Section, telephone (229) 257 2492 or 257-4393, not more than two (2) weeks prior to the planned start of work. 2.1. The Contractor shall provide a copy of the schedule to the Point of Contact (POC) not less than five (5) working days prior to work start. Upon completion of work, if an inspector is not present, the Contractor shall notify the Quality Assurance Inspection Section to request an inspector to check and verify the work accomplished. 3. SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS. 3.1. Security Requirements. Contractor employees shall always comply with the base security requirements imposed by the Installation Commander while on the base premises. The Contractor shall obtain all necessary passes, decals, badges, or other items required for access to perform contract services on the base. The Contractor is responsible for accountability of all such media, which shall be surrendered to the Security Forces Squadron Pass and Registration Section upon completion or termination of the contract or upon termination of an individual’s employment with the Contractor. The Contractor shall comply with all the base policies regarding installation entry, rules of the road, contingency operations compliance, and photography prohibitions. Contractor employees are authorized base entry for the purpose of work only under this contract and are not authorized in other facilities or areas without prior government authorization. Due to safety/security requirements, Contractor personnel shall be required to fluently speak, comprehend, read, and write English. 3.1.1. Base Access. The Contractor must be aware entry requirements are subject to change due to installation and world situations. All employees may be subject to a background check through…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 561790