Description
PERFORMANCE WORK STATEMENT
FOR
VERTICAL TRANSPORTATION EQUIPMENT (VTE) MAINTENANCE,
REPAIR, & INSPECTION SERVICES
LITTLE ROCK AIR FORCE BASE
1 April 2026
-- 1 of 20 --
1.0 Description of Services
1.1 Objective(s): This Performance Work Statement (PWS) describes the services required to
provide all management, tools, supplies, equipment, parts and labor necessary to maintain,
repair, and inspect the real property vertical transportation equipment (VTE) at Little Rock AFB,
AR 72099 in a manner that will ensure continuous and safe operation (full maintenance and
repair with the exception of the exclusions listed in paragraph 1.4). The VTE and their locations
will be listed in Appendix C. NOTE: The term “VTE” in this Performance Work Statement
(PWS) includes all equipment listed in Appendix C: freight and passenger elevators, escalators,
and may include wheelchair/stair lifts, dock levelers, and dumbwaiters.
1.1.1 The contractor (and/or sub-contractor if used) shall be fully licensed in the State of
Arkansas to perform VTE maintenance.
1.2 Benefit to United States Air Force (USAF): This acquisition will benefit the United States
Air Force (USAF) by providing safe operation to all VTE units on Little Rock AFB (except Base
Clinic)
1.3 Description of Work Requirements
1.3.1 This full maintenance contract signifies a VTE service provider (Contractor) takes total
service responsibility for the equipment identified in the contract. Except those services covered
in paragraph 1.4 below, the monthly fixed price includes all inspections, maintenance, repairs,
replacements, routine and emergency service calls and monthly (every 30 days) fire service
inspections. This contract allows the Government to budget total yearly costs and eliminates
concerns relating to individual parts repair or replacement invoicing. The Contractor assumes all
responsibility and determines the amount of service visits and types of service required to keep
the VTE operating safely and within the performance objectives of paragraph 2.0.
1.3.2 Work conducted on VTE will be in accordance with the American Society of Mechanical
Engineers (ASME) A17.1-2016 (or applicable code for year VTE put in service) Safety Code for
Elevators and Escalators (ASME A17.1); ANSI/ASME A17.2-2014, Guide for Inspection of
Elevators, Escalators, and Moving Walks (applicable to equipment); A17.3-2015, Safety Code
for Existing Elevators and Escalators (applicable to equipment); National Fire Protection
Association Standards (NFPA); Unified Facilities Criteria (UFC) 3-600-01; Fire Protection
Engineering for Facilities, Occupational Safety and Health Administration (OSHA) Standards,
the recommendations of the original equipment manufacturer (OEM) and any State of Arkansas
regulations and requirements for elevators and escalators.
1.4 Excluded Services: The following are not covered in the full maintenance service
arrangement and are considered over and above services:
1.4.1 Alterations (a.k.a., modernizations) are not covered in the full maintenance service
arrangement. (See Paragraph 1.4 enclusive)
-- 2 of 20 --
1.4.2 Acts by parties other than the Contractor of vandalism, abuse, negligence, damage resulting
from rescue and recovery operations and acts of God are not included in the contract.
1.4.3 Additional items excluded in the full maintenance coverage are cosmetic, construction,
ancillary components of the VTE system including the finishing, or replacement of the cab
enclosure, ceiling frames, hoist-way door panels, door frames, sills, car flooring, floor covering,
main line power switches, main power breaker(s), buried piping, smoke and fire sensors, main
communication feeders to controller, security systems, batteries for emergency lighting and
lowering that are not solely dedicated to the VTE, air conditioners, and heaters.
1.4.4 Routine cleaning and refinishing the interior of cars and the exterior of the hoist-way doors
and frames is not included in the basic full maintenance service.
1.4.5 In the event that the Contractor encounters an item of work included in paragraph 1.4
(inclusive) the Contractor will report the situation to the Contracting Officer’s Representative
(COR). The report will include the work location, a detailed scope of the required work,
justification for Contractor determination that the work was not included in the contract, and an
itemized cost estimate (including time to repair, all required parts and a breakdown of labor
hours). NOTE: Any part, component or assembly unavailable from the manufacturer due to
obsolescence, remains the Contractor’s responsibility to obtain an engineered equivalent product
from a commercial source and is not excluded from the basic maintenance contract.
1.5 Definitions:
1.5.1 Maintenance, Repair and Replacement. Maintenance, repair and replacement are in
existing VTEs and included in the contract scope of services. All maintenance, repair and
replacement of damaged, broken, or worn parts. Example: mechanical or electronic, including
emergency telephones, cables, belts, motors, CPUs and boards, hydraulic cylinder rebuilds, door
motors, rail guides and relays are to be done in a manner that ensures that the equipment may be
operated safely. Maintenance, repair and replacement are actions to restore equipment to a state
in which it may safely perform its required operations as installed in accordance with the
manufacturer’s recommendations. See ASME A17.1 for requirements.
1.5.2 Alteration. An alteration is also on existing VTE but is not included under the full
maintenance service arrangement. Alteration/modernization will be covered on an over and
above Contract Line Item, or it may result in a modification to the contract. The typical
alteration results in a betterment to the safe operation of the equipment. In the case of elevators,
when an alteration is made, all affected safety requirements must be complied with. All work as
part of an alteration is required to comply with specific re…
Source: SAM.gov, as posted. Verify the current solicitation before responding.