What this opportunity is
The Department of Defense is seeking Waste Water Treatment Plant Services at Lajes Field, Azores, Portugal, through a Request for Quotation (RFQ) under NAICS 221320. This opportunity is not set aside for small businesses, meaning it is open to all business sizes. Interested contractors must provide comprehensive management, sampling, and maintenance services for the facility, which operates continuously and includes various treatment components. Note that funding is not currently available, and no awards will be made until funds are secured, so tracking this notice is essential for potential bidders.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Waste Water Treatment Plant PWS
Date: 7 Sep 2026 revision 3
Page 1 of 17
PERFORMANCE WORK STATEMENT
OPERATE AND MAINTAIN WASTE WATER TREATMENT PLANT
LAJES FIELD, AZORES, PORTUGAL
-- 1 of 17 --
Waste Water Treatment Plant PWS
Date: 7 Sep 2026 revision 3
Page 2 of 17
1. DESCRIPTION OF SERVICES
1.1. Description: Non-personal service- The contractor shall provide all management, sampling, tools, supplies,
repair parts, equipment, incidentals, qualified personnel, and transportation necessary to operate and
maintain waste water treatment plant (WWTP), lift station, oil-water separator, and grease traps at Lajes
Field, Terceira, Azores, Portugal. The waste water treatment plant has a full capacity of 800K gallons per
day with activated sludge. In addition, there are 14 lift stations, 8 oil water separators, and 2 grease traps.
1.2. Waste Water Treatment Operations: Operations shall be conducted in order to provide continuous, cost
effective, and efficient treatment of all wastewater. The system shall operate 24 hours a day, 7 days a week.
The contractor shall also perform appropriate sampling and laboratory analysis to ensure compliance with
all regulatory requirements. The contractor shall notify the contracting officer representative (COR) of any
unusual conditions observed and shall assist in determining the cause and resolving the situation. The
contractor shall follow, and ensure water quality continually meets or exceeds, the appropriate regulatory
guidance provided by current applicable Air Force Instructions and the Final Governing Standards for
Portugal (FGS-P) (see Appendix A).
1.3. Preventive Maintenance Inspection (PMI) Plan: A preventive maintenance program shall be established
to help prevent equipment failures before they happen. The contractor shall conduct preventive maintenance
inspections (PMI) and related services to sustain the proper operation of the system and to minimize
breakdowns and service interruptions. The contractor shall develop a PMI plan which covers 52 consecutive
weeks that includes all of the necessary inspections, tests, services, lubrication, tank cleanings and repair of
each component of major system covered under this contract. The plan shall include all components to be
inspected and maintained, inspection and maintenance frequencies (weekly, monthly, quarterly, etc.) and
methodology. Equipment maintenance cards shall be made for each piece of equipment. The plan shall
follow and reference specific manufacturer’s recommendations, handbooks, manuals, and standard trade
practices. The contractor shall update the plan and schedules as necessary to reflect any changes in
equipment inventory. The completed PMI plan shall be submitted to the Contracting Officer within 30 days
after contract award.
1.4. Preventive Maintenance Work: Once approved, the contractor shall follow the schedule as closely as
possible unless unforeseen circumstances require a deviation. Any proposed changes to the approved
schedules must be submitted to the Contracting Officer for approval. The contractor shall correct all
equipment deficiencies identified during PMI’s subject to the limits specified in the following Corrective
Maintenance paragraph. When possible, equipment deficiencies detected during PMI’s shall be corrected
prior to departing the job site.
1.5. Preventive Maintenance Records/Reports: Records and reports shall be maintained documenting all
corrective and preventive maintenance tasks accomplished and shall reflect the status of each system after
the corrective or preventive maintenance is completed. A Preventive/Corrective Maintenance Report shall
be submitted no later than 1200hrs Monday of each week during the term of the contract. The report shall
be submitted to the COR summarizing the preventive inspections and maintenance and corrective
maintenance performed during the previous week. The report shall also include status of equipment and
current status of any parts on order.
1.6. Corrective Maintenance Plan (CMP): Corrective maintenance shall be performed to correct breakdowns
and deficiencies. Corrective maintenance includes adjustments, service, repairs, or replacement required to
return systems and equipment to proper operation. When possible, equipment and system deficiencies shall
be corrected along with preventive maintenance work. All deficiencies, if within the scope of corrective
maintenance, must be corrected within the time frames for an emergency, urgent, or routine service call as
-- 2 of 17 --
Waste Water Treatment Plant PWS
Date: 7 Sep 2026 revision 3
Page 3 of 17
appropriate. All maintenance, repairs, alterations, and modifications to water treatment systems shall be
performed avoiding cross connections. The contractor shall make every effort to prevent water
contamination from infiltration, flooding, and back flowing the pipe systems.
1.7. Corrective Maintenance Repair Limitation: Contractor is liable for all labor costs associated with
maintenance and repairs for the plant and system. The contractor’s liability for component replacement
parts (to include single spare part) or repair parts are limited to not more than €2,000 for each item after
the following conditions have been met. Any item with a replacement part cost over €2,000, which is
removed from the equipment shall be inspected by the COR prior to final disposition. The contractor shall
furnish 3 quotes for any new parts or repair parts costing over €2,000. For any new parts or repair of parts
that exceed €2,000, three (3) quotes must be sent to the Contracting Officer for a final determination. If the
COR determines items can be repaired instead of replaced, the contractor shall make the repair. Repaired
items shall be used before newly purchased items are used. If it is determined by the COR that items are
beyond repair the contractor shall dispose of them in the appropriate manner. Items with salvage value shall
be turned in to the Base Reutilization Material Office (DRMO) by …
Source: SAM.gov, as posted. Verify the current solicitation before responding.