Waste Water Treatment Plant Services

DEPT OF DEFENSE

Notice type
Combined Synopsis/Solicitation
Solicitation #
FA448627Q0002
NAICS
221320
PSC
M1ND
Set-aside
No Set aside used
Posted
October 12, 2026
Response due
November 23, 2026
Place of performance
Praia da Vitoria, PT-20

What this opportunity is

The Department of Defense is seeking Waste Water Treatment Plant Services at Lajes Field, Azores, Portugal, through a Request for Quotation (RFQ) under NAICS 221320. This opportunity is not set aside for small businesses, meaning it is open to all business sizes. Interested contractors must provide comprehensive management, sampling, and maintenance services for the facility, which operates continuously and includes various treatment components. Note that funding is not currently available, and no awards will be made until funds are secured, so tracking this notice is essential for potential bidders.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Waste Water Treatment Plant PWS Date: 7 Sep 2026 revision 3 Page 1 of 17 PERFORMANCE WORK STATEMENT OPERATE AND MAINTAIN WASTE WATER TREATMENT PLANT LAJES FIELD, AZORES, PORTUGAL -- 1 of 17 -- Waste Water Treatment Plant PWS Date: 7 Sep 2026 revision 3 Page 2 of 17 1. DESCRIPTION OF SERVICES 1.1. Description: Non-personal service- The contractor shall provide all management, sampling, tools, supplies, repair parts, equipment, incidentals, qualified personnel, and transportation necessary to operate and maintain waste water treatment plant (WWTP), lift station, oil-water separator, and grease traps at Lajes Field, Terceira, Azores, Portugal. The waste water treatment plant has a full capacity of 800K gallons per day with activated sludge. In addition, there are 14 lift stations, 8 oil water separators, and 2 grease traps. 1.2. Waste Water Treatment Operations: Operations shall be conducted in order to provide continuous, cost effective, and efficient treatment of all wastewater. The system shall operate 24 hours a day, 7 days a week. The contractor shall also perform appropriate sampling and laboratory analysis to ensure compliance with all regulatory requirements. The contractor shall notify the contracting officer representative (COR) of any unusual conditions observed and shall assist in determining the cause and resolving the situation. The contractor shall follow, and ensure water quality continually meets or exceeds, the appropriate regulatory guidance provided by current applicable Air Force Instructions and the Final Governing Standards for Portugal (FGS-P) (see Appendix A). 1.3. Preventive Maintenance Inspection (PMI) Plan: A preventive maintenance program shall be established to help prevent equipment failures before they happen. The contractor shall conduct preventive maintenance inspections (PMI) and related services to sustain the proper operation of the system and to minimize breakdowns and service interruptions. The contractor shall develop a PMI plan which covers 52 consecutive weeks that includes all of the necessary inspections, tests, services, lubrication, tank cleanings and repair of each component of major system covered under this contract. The plan shall include all components to be inspected and maintained, inspection and maintenance frequencies (weekly, monthly, quarterly, etc.) and methodology. Equipment maintenance cards shall be made for each piece of equipment. The plan shall follow and reference specific manufacturer’s recommendations, handbooks, manuals, and standard trade practices. The contractor shall update the plan and schedules as necessary to reflect any changes in equipment inventory. The completed PMI plan shall be submitted to the Contracting Officer within 30 days after contract award. 1.4. Preventive Maintenance Work: Once approved, the contractor shall follow the schedule as closely as possible unless unforeseen circumstances require a deviation. Any proposed changes to the approved schedules must be submitted to the Contracting Officer for approval. The contractor shall correct all equipment deficiencies identified during PMI’s subject to the limits specified in the following Corrective Maintenance paragraph. When possible, equipment deficiencies detected during PMI’s shall be corrected prior to departing the job site. 1.5. Preventive Maintenance Records/Reports: Records and reports shall be maintained documenting all corrective and preventive maintenance tasks accomplished and shall reflect the status of each system after the corrective or preventive maintenance is completed. A Preventive/Corrective Maintenance Report shall be submitted no later than 1200hrs Monday of each week during the term of the contract. The report shall be submitted to the COR summarizing the preventive inspections and maintenance and corrective maintenance performed during the previous week. The report shall also include status of equipment and current status of any parts on order. 1.6. Corrective Maintenance Plan (CMP): Corrective maintenance shall be performed to correct breakdowns and deficiencies. Corrective maintenance includes adjustments, service, repairs, or replacement required to return systems and equipment to proper operation. When possible, equipment and system deficiencies shall be corrected along with preventive maintenance work. All deficiencies, if within the scope of corrective maintenance, must be corrected within the time frames for an emergency, urgent, or routine service call as -- 2 of 17 -- Waste Water Treatment Plant PWS Date: 7 Sep 2026 revision 3 Page 3 of 17 appropriate. All maintenance, repairs, alterations, and modifications to water treatment systems shall be performed avoiding cross connections. The contractor shall make every effort to prevent water contamination from infiltration, flooding, and back flowing the pipe systems. 1.7. Corrective Maintenance Repair Limitation: Contractor is liable for all labor costs associated with maintenance and repairs for the plant and system. The contractor’s liability for component replacement parts (to include single spare part) or repair parts are limited to not more than €2,000 for each item after the following conditions have been met. Any item with a replacement part cost over €2,000, which is removed from the equipment shall be inspected by the COR prior to final disposition. The contractor shall furnish 3 quotes for any new parts or repair parts costing over €2,000. For any new parts or repair of parts that exceed €2,000, three (3) quotes must be sent to the Contracting Officer for a final determination. If the COR determines items can be repaired instead of replaced, the contractor shall make the repair. Repaired items shall be used before newly purchased items are used. If it is determined by the COR that items are beyond repair the contractor shall dispose of them in the appropriate manner. Items with salvage value shall be turned in to the Base Reutilization Material Office (DRMO) by …

Source: SAM.gov, as posted. Verify the current solicitation before responding.