Description
Statement of Work
Fermi National Accelerator Laboratory 1
AD-Proton Source Low Energy Solenoid and
Corrector Magnet Package
Preparation Date: 07/24/2026
Date: 08/03/2026
Preparing Organization: AD-Proton Source Department
Document Number:
Document Approval
Signatures Required Date Approved
Originator: Daniel C. Jones 8/18/26
Approver: Lionel Prost
Revision History
Revision Date of Release Description of Change
- August 2026 Initial Release
-- 1 of 15 --
Statement of Work
Fermi National Accelerator Laboratory 2
Table of Contents
1. INTRODUCTION ............................................................................................................................ 3
2. SCOPE AND DELIVERABLES ....................................................................................................... 3
3. REQUIREMENTS/SPECIFICATIONS ............................................................................................ 4
4. REVIEWS ....................................................................................................................................... 7
5. DELIVERY SCHEDULE AND HOLD POINTS ................................................................................ 8
6. REPORTING/MEETING REQUIREMENTS .................................................................................... 8
7. QUALITY REQUIREMENTS ........................................................................................................... 8
8. ACCEPTANCE ............................................................................................................................. 10
8.1. Subcontractor Factory Acceptance Test ................................................................................ 10
8.2. FFDG Site Acceptance Testing ............................................................................................. 11
8.3. Serialization ........................................................................................................................... 12
9. SHIPPING .................................................................................................................................... 13
10. Technical Requirements ............................................................................................................... 13
11. POST-AWARD MANUFACTURER'S EXCEPTION DOCUMENT ................................................. 14
12. Attachments.................................................................................................................................. 14
APPENDIX A ....................................................................................................................................... 15
A.1 ACRONYMS ......................................................................................................................... 15
-- 2 of 15 --
Statement of Work
Fermi National Accelerator Laboratory 3
1. INTRODUCTION
The Proton Source Department of Fermi National Accelerator Laboratory (FNAL) is responsible for
providing high-intensity proton beams for FNAL’s broad physic program. To facilitate the complex’s
continued success the Proton Source Department is seeking proposals for the design and fabrication
of 2 magnet packages that will steer, focus, and match the 30 keV H- beam from the ion source into the
Radio Frequency Quadrupole (RFQ) accelerator. The magnet packages must include the solenoid coil and
two dipole corrector magnets for steering the beam in both the vertical and horizontal planes.
This Statement Of Work (SOW) outlines the technical tasks and requirements for the Prospective Offerors
(hereafter referred to as “the Subcontractor”), including reporting, documentation, scheduling, change
management, deliverables, and communication with The Buyer, Fermi Forward Discovery Group (FFDG).
These requirements must be fulfilled in accordance with FNAL standards and guidelines.
2. SCOPE AND DELIVERABLES
The primary scope of work covers design, manufacturing, fabrication, quality control (QC), and delivery
for a built-to-spec package inclusive of all associated and/or described work within this SOW. The
Subcontractor will provide all shop facilities, manufacturing/fabrication equipment, qualified shop
personnel, engineering personnel, inspection services, magnetic testing services, cleaning services, and
packaging services for completing the scope of work defined in this SOW.
Table 1 provides a list of all contract deliverables, including documentation which is listed as required (AR).
Only released drawings shall be used for manufacturing and fabrication. The Subcontractor is responsible
for verifying the drawing release state with FFDG prior to the start of any manufacturing or fabrication. The
requirements for documentation to be provided to FFDG are outlined in Section 7.
Table 1: List of Contract Deliverables
Item Quantity
Solenoid with integrated dipole correctors 2
Complete Drawing Set AR
Production Schedule AR
Material Certifications of Major Components AR
Final Design Report AR
QC: Fabrication & Inspection Plans AR
Magnetic Measurement Test Plans# AR
QC Reports: Fabrication & Inspection Report AR
Magnetic Measurement Test Reports AR
# Magnetic measurements may not be required (see further for details)
The Subcontractor is encouraged to use the reference design provided by FFDG; however, it is the
Subcontractor’s responsibility to perform the detailed final design for FFDG’s approval prior to start of
fabrication. This includes magnet design, core design, coils/sections design, power and water connections
design, and support design.
-- 3 of 15 --
Statement of Work
Fermi National Accelerator Laboratory 4
If the Subcontractor does not use FFDG’s suggested design but instead chooses to make significant
modifications or prefers to make its own design per the provided specification, the full set of magnetic,
thermal and hydraulic calculations must be performed and provided to FFDG prior to the start …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Open opportunities in NAICS 332999
25--HOUSING,PANEL,VEHICULA
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
30--BELL CRANK
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
25--LOCK SET,VEHICULAR DOO
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026
Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project
ENERGY, DEPARTMENT OF · Combined Synopsis/Solicitation · due November 26, 2026
45--WATER CLOSET
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due November 30, 2026
25--TAILGATE,VEHICLE BODY
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due December 2, 2026