Skip to content

Open for responses

WFE Solenoid/Corrector Magnet Spares

ENERGY, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
389116swk
NAICS
332999
PSC
5945
Posted
November 17, 2026
Response due
January 5, 2027
Place of performance
Batavia, IL

Description

Statement of Work Fermi National Accelerator Laboratory 1 AD-Proton Source Low Energy Solenoid and Corrector Magnet Package Preparation Date: 07/24/2026 Date: 08/03/2026 Preparing Organization: AD-Proton Source Department Document Number: Document Approval Signatures Required Date Approved Originator: Daniel C. Jones 8/18/26 Approver: Lionel Prost Revision History Revision Date of Release Description of Change - August 2026 Initial Release -- 1 of 15 -- Statement of Work Fermi National Accelerator Laboratory 2 Table of Contents 1. INTRODUCTION ............................................................................................................................ 3 2. SCOPE AND DELIVERABLES ....................................................................................................... 3 3. REQUIREMENTS/SPECIFICATIONS ............................................................................................ 4 4. REVIEWS ....................................................................................................................................... 7 5. DELIVERY SCHEDULE AND HOLD POINTS ................................................................................ 8 6. REPORTING/MEETING REQUIREMENTS .................................................................................... 8 7. QUALITY REQUIREMENTS ........................................................................................................... 8 8. ACCEPTANCE ............................................................................................................................. 10 8.1. Subcontractor Factory Acceptance Test ................................................................................ 10 8.2. FFDG Site Acceptance Testing ............................................................................................. 11 8.3. Serialization ........................................................................................................................... 12 9. SHIPPING .................................................................................................................................... 13 10. Technical Requirements ............................................................................................................... 13 11. POST-AWARD MANUFACTURER'S EXCEPTION DOCUMENT ................................................. 14 12. Attachments.................................................................................................................................. 14 APPENDIX A ....................................................................................................................................... 15 A.1 ACRONYMS ......................................................................................................................... 15 -- 2 of 15 -- Statement of Work Fermi National Accelerator Laboratory 3 1. INTRODUCTION The Proton Source Department of Fermi National Accelerator Laboratory (FNAL) is responsible for providing high-intensity proton beams for FNAL’s broad physic program. To facilitate the complex’s continued success the Proton Source Department is seeking proposals for the design and fabrication of 2 magnet packages that will steer, focus, and match the 30 keV H- beam from the ion source into the Radio Frequency Quadrupole (RFQ) accelerator. The magnet packages must include the solenoid coil and two dipole corrector magnets for steering the beam in both the vertical and horizontal planes. This Statement Of Work (SOW) outlines the technical tasks and requirements for the Prospective Offerors (hereafter referred to as “the Subcontractor”), including reporting, documentation, scheduling, change management, deliverables, and communication with The Buyer, Fermi Forward Discovery Group (FFDG). These requirements must be fulfilled in accordance with FNAL standards and guidelines. 2. SCOPE AND DELIVERABLES The primary scope of work covers design, manufacturing, fabrication, quality control (QC), and delivery for a built-to-spec package inclusive of all associated and/or described work within this SOW. The Subcontractor will provide all shop facilities, manufacturing/fabrication equipment, qualified shop personnel, engineering personnel, inspection services, magnetic testing services, cleaning services, and packaging services for completing the scope of work defined in this SOW. Table 1 provides a list of all contract deliverables, including documentation which is listed as required (AR). Only released drawings shall be used for manufacturing and fabrication. The Subcontractor is responsible for verifying the drawing release state with FFDG prior to the start of any manufacturing or fabrication. The requirements for documentation to be provided to FFDG are outlined in Section 7. Table 1: List of Contract Deliverables Item Quantity Solenoid with integrated dipole correctors 2 Complete Drawing Set AR Production Schedule AR Material Certifications of Major Components AR Final Design Report AR QC: Fabrication & Inspection Plans AR Magnetic Measurement Test Plans# AR QC Reports: Fabrication & Inspection Report AR Magnetic Measurement Test Reports AR # Magnetic measurements may not be required (see further for details) The Subcontractor is encouraged to use the reference design provided by FFDG; however, it is the Subcontractor’s responsibility to perform the detailed final design for FFDG’s approval prior to start of fabrication. This includes magnet design, core design, coils/sections design, power and water connections design, and support design. -- 3 of 15 -- Statement of Work Fermi National Accelerator Laboratory 4 If the Subcontractor does not use FFDG’s suggested design but instead chooses to make significant modifications or prefers to make its own design per the provided specification, the full set of magnetic, thermal and hydraulic calculations must be performed and provided to FFDG prior to the start …

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 332999