What this opportunity is
The Department of Veterans Affairs is seeking a contractor to replace existing carpet with VCT flooring in Buildings B2, B1, and B28 at the St. Cloud VA Health Care System in Minnesota. This project is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for eligible small firms in the flooring installation sector (NAICS 238330). Interested businesses should note that this is a solicitation notice, indicating they need to prepare to bid on the project.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
VA SPECIFICATION COVER PAGE (FINAL VERSION)
Department of Veterans Affairs
St. Cloud VA Health Care System
Project Manual
PROJECT TITLE
Replace Carpet with VCT – Buildings B2, B1, and B28
Project Number: 656-26-201
LOCATION
St. Cloud VA Health Care System
St. Cloud, MN
PREPARED FOR
Department of Veterans Affairs
Office of Facilities Management
St. Cloud VA Health Care System
DATE
June 2026
-- 1 of 224 --
PROJECT DESCRIPTION
Replacement of existing carpet and carpet tile with VCT flooring across Buildings B2, B1,
and B28, including removal of carpet, mastic, and base; substrate preparation; moisture
testing; installation of new VCT and 6" cove base; and associated phasing, ICRA, furniture
movement, and coordination per Exhibit A.
-- 2 of 224 --
03-01-2026
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-2021
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 12-2025
01 33 23 Shop Drawings, Product Data, and Samples 03-2026
01 35 26 Safety Requirements 05-2024
01 42 19 Reference Standards 11-2020
01 45 00 Quality Control 02-2021
01 57 19 Temporary Environmental Controls 01-2021
01 74 19 Construction Waste Management 04-2022
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-2017
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-2021
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-2021
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-2026
09 65 13 Resilient Base and Accessories 01-2021
09 65 19 Resilient Tile Flooring 05-2018
09 68 00 Carpeting 01-2021
09 91 00 Painting 01-2021
-- 3 of 224 --
11/06/25
SECTION 01 00 00
GENERAL REQUIREMENTS TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS ........................................ 1
1.2 GENERAL INTENTION ........................................... 1
1.3 STATEMENT OF BID ITEM(S) .................................... 5
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR .................. 6
1.5 CONSTRUCTION SECURITY REQUIREMENTS .......................... 7
1.6 OPERATIONS AND STORAGE AREAS ............................... 12
1.7 ALTERATIONS ................................................ 18
1.8 DISPOSAL AND RETENTION ..................................... 19
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS ................................ 20
1.10 RESTORATION ............................................... 21
1.13 LAYOUT OF WORK ............................................ 22
1.14 AS-BUILT DRAWINGS ......................................... 22
1.15 USE OF ROADWAYS ........................................... 23
1.18 TEMPORARY USE OF EXISTING ELEVATORS ....................... 23
1.21 AVAILABILITY AND USE OF UTILITY SERVICES .................. 24
1.23 TESTS ..................................................... 26
1.24 INSTRUCTIONS .............................................. 27
1.33 REBATE DOCUMENTATION ...................................... 29
1.34 SITE INSPECTIONS .......................................... 29
1.35 Project/Phase Occupancy ................................... 31
1.36 Contracting Officer Representative Coordination .......... 32
i
-- 4 of 224 --
11/06/25
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection
control requirements. Throughout the campus there is existing hazardous
material (lead paint, asbestos, etc); not all areas are shown on the
drawings. Contractor shall maintain awareness, have safety plans, PPE
and comply with OSHA, EPA and other related regulations when working
near assemblies.
In addition to the requirements of the safety section, the contractor
shall submit Safety Data Sheets per OSHA, for all products, chemicals,
etc. to be used on site within 15 calendar days of contract award. Any
changes to the material, products, and chemicals planned for use during
the project shall be submitted and approved 15 calendar days prior to
bringing the material onsite.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations,
including demolition and removal of existing structures, and furnish
labor and materials and perform work for Replace Carpet – B2, B28
Basement, B1-1 (Project No. 656-26-201) as required by Statement of Work,
drawings and specifications. All contract work is required to be
completed prior to acceptance of the work.
1. The contract duration shall include all work, inspections and
punch list corrections. Beneficial occupancy and final
acceptance shall be achieved within the contract duration.
Progress payments do not indicate acceptance. The process of
formal acceptance shall be used in this contract. The process
of conditional acceptance and/or use without acceptance may be
used in this contract as coordinated with the COR.
2. Contract normal working hours are 8 am to 4:30 pm Monday
through Friday, excluding Federal Holidays. Some locations
require normal working hours, some require off-hours work.
3. Off-hours and night work is required. Review the SOW
document and the construction plans.
4. Contractor shall coordinate all off-hours and night work with
the COR at least 15 calendar days in advance.
-- 5 of 224 --
11/06/25
01 00 00 -2
B. Visits to the site by Bidders may be made only by appointment with the
Contracting Officer.
C. Before placement and installation of work subject to tests by testing
laboratory retained by the Contractor. The Contractor shall notify the
COR not less than two workdays in advance of the tests/inspection.
D. All employees of general contractor and subcontractors shall comply
with VA security management program and obtain permission of the VA
police, be identified by project and employer, and restricted from
unauthorize…
Source: SAM.gov, as posted. Verify the current solicitation before responding.