Z1DA--Design Building (DB) 626-27-504 MHEOCC Compliance TVHS VAMC (Nashville Campus)

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Presolicitation
Solicitation #
36C24927R0021
NAICS
236220
PSC
Z1DA
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Posted
November 17, 2026
Response due
December 2, 2026
Place of performance
Nashville, TN

Description

MHEOCC COMPLIANCE TENNESSEE VALLEY HEALTHCARE SYSTEM – NASHVILLE, TN PROJECT#: 626-27-504 PUB. DATE: 11-01-21 GENERAL REQUIREMENTS 01 00 00 - 1 PART 1 - GENERAL 1.1 SAFETY REQUIREMENTS SECTION 01 00 00 GENERAL REQUIREMENTS A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. 1.2 GENERAL INTENTION A. Contractor shall completely prepare area of work for building operations, including demolition and removal of existing equipment, finishes, and other items as shown throughout the contract documents, and Contractor shall furnish labor and materials to perform work for the Tennessee Valley Healthcare System (1310 24th Ave South, Nashville, TN 37212) for project 626-25-101 Upgrade Critical Environments I as required by contract drawings and specifications. B. Visits to the site by Bidders may be made only by appointment with the Contracting Officer’s Representative (COR). C. Offices of Spees Design Build, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative. D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR. E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. 1.3 STATEMENT OF BID ITEM(S) A. BASE BID :Performance of all Work represented in the Bid Documents shall include architectural, structural, mechanical, plumbing, electrical, and fire protection tasks necessary to complete the work depicted throughout the contract drawings and specifications. This also includes the necessary demolition and removal or relocation of existing equipment, finishes, and other items as shown. Most of the work takes place on levels 0-4, however selective work on the roof is also required. -- 1 of 22 -- MHEOCC COMPLIANCE TENNESSEE VALLEY HEALTHCARE SYSTEM – NASHVILLE, TN PROJECT#: 626-27-504 PUB. DATE: 11-01-21 GENERAL REQUIREMENTS 01 00 00 - 2 B. BID DEDUCT 1: Do not include new ACT ceiling suspension grids indicated as part of Bid Deduct 1. All indicated rooms shall still receive new ACT tiles. C. BID DEDUCT 2: Do not include new light fixtures indicated as part of Bid Deduct 2. D. BID DEDUCT 3: Do not include Architectural, Mechanical, and Electrical work in rooms E-23 and G-121S. E. BID DEDUCT 4: Do not include new Architectural finishes in rooms G-105, G-105I, and G-105J. 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. B. Security Procedures: 1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. 2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. 3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time. 4. VA reserves the right to close or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. C. Key Control: 1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. -- 2 of 22 -- MHEOCC COMPLIANCE TENNESSEE VALLEY HEALTHCARE SYSTEM – NASHVILLE, TN PROJECT#: 626-27-504 PUB. DATE: 11-01-21 GENERAL REQUIREMENTS 01 00 00 - 3 2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate. D. Document Control: 1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”. 2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project. 3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request. 4. These security documents shall not be removed or tra…

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Open opportunities in NAICS 236220