Z1DZ--695-22-123 Upgrade N Campus Medium Voltage Feeders

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C25226B0023
NAICS
238210
PSC
Z1DZ
Posted
July 23, 2026
Response due
July 22, 2026

What this opportunity is

The Department of Veterans Affairs is buying construction services to upgrade medium voltage feeders at the Clement J. Zablocki VA Medical Center. This solicitation suits businesses classified under NAICS code 238210. As a solicitation notice, this means that interested businesses should prepare to bid on the project rather than simply tracking its progress.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

PROJECT NO: 695-22-123 PROJECT NAME: Upgrade North Campus Medium Voltage Feeders Clement J. Zablocki VA Medical Center Upgrade North Campus Medium Voltage Feeders Project 695-22-123 Statement of Work October 7, 2025 US Department of Veterans Affairs Clement J. Zablocki VA Medical Center 5000 W. National Ave. Milwaukee, WI 53295-0001 STATEMENT OF WORK Prepared by: Facility Management Division -- 1 of 4 -- Page 2 of 4 I. General Description Provide Construction Services for Project 695-22-123 Upgrade North Campus Medium Voltage Feeders II. General Project Scope 1. Contractor shall furnish all labor, materials, equipment, qualified supervision, and all items designated in this contract in accordance with the specifications and drawings to complete Project 695-22-123 Upgrade North Campus Medium Voltage Feeders. 2. The general scope of the project involves: i. Converting the Clement J. Zablocki VA North Campus Electrical Distribution System from a Radial System to a Composite Primary Loop Radial System. ii. Addition and replacement of select pad-mounted electrical distribution equipment and associated components. iii. Addition and replacement of select underground medium voltage feeders and associated electrical fittings. iv. Trenching and installation of new duct banks. v. Integration of kirk-key interlock system. vi. Addition and replacement of current transducer fault indicators. vii. Detailed project phasing, sequencing, and outage planning to mitigate impacts to buildings, medical center operations, and vehicle traffic/accessibility. viii. Thorough utility survey services to develop and deliver a comprehensive utility survey report, recording precise geographic location and depth information (where attainable) of the North Campus Electrical Distribution System. This utility survey report shall be delivered along with the as-builts. 3. The VA anticipates a minimum of 60 calendar days for processing long lead time equipment and material submittals. See Section III Phase 0 below. 4. All work following the Notice to Proceed shall be completed within 410 calendar days. -- 2 of 4 -- Page 3 of 4 III. Project Duration/Phases 1. Phase 0: Preliminary Work Phase i. Provide submittals for long lead time equipment and materials. Promptly order long lead time equipment and materials once the submittals have been approved by the VA. Once long lead time equipment and materials have been ordered, the project shall be placed onto suspension in order to preserve contract days. The suspension duration shall be subject to the lead times and critical path planning. The VA anticipates a minimum of 60 calendar days for the completion of Phase 0, including the submission of the long lead time submittals, and the review and approval of the submittals. Once suspension is lifted, the project shall be constructed within a single year. The construction of the project shall not overlap into multiple years, specifically the construction phase. Provide contingencies for maintaining communication with the VA during the suspension. 2. Notice To Proceed/Pre-construction Meeting i. Once long lead time equipment and materials are anticipated to arrive and a construction mobilization date can be established, the contract suspension shall be lifted, and the VA will issue a Notice To Proceed (NTP) and schedule a Pre- construction Meeting with the Contractor. 3. Phase 1: Pre-Construction Period (A) i. Duration is 30 calendar days and shall not exceed NTP + 30 calendar days. Within this period the contract shall submit the following and schedule a review meeting with the COR and VA Safety (as applicable per the specification requirements): a. Construction Schedule (Initial) – 01 32 16.15 b. Accident Prevention Plan – 01 35 26 4. Phase 2: Pre-Construction Period (B) i. Duration is 30 calendar days and shall not exceed NTP + 60 calendar days. Within this period the contractor shall submit the following Pre-Construction Submittals (as applicable per the specification requirements): a. Construction Site Security Plan – 01 00 00 b. Construction Phasing Plan(s) – 01 00 00 c. Existing Conditions Survey – 01 00 00 d. Obtain PIV Badges – 01 01 10-SN e. Contractor’s Impact Statement – 01 01 10-SN f. Contractor Checklist – 01 01 10-SN g. Submittal Register – 01 33 23 h. Quality Control Plan – 01 33 23 i. Schedule of Values – 01 33 23 j. Activity Hazard Analyses – 01 35 26 -- 3 of 4 -- Page 4 of 4 k. SSHO and CP List for the Project – 01 35 26 l. OSHA Certificates, Licenses, and Training Documents – 01 35 26 m. Fire Safety Plan – 01 35 26 n. Construction Waste Management Plan – 01 74 19 5. Phase 3: Pre-Construction VA Review Period/Construction Kickoff Meeting i. Duration is 30 calendar days and shall not exceed NTP + 90 calendar days. Within this period the VA shall complete review of all Contractor Pre-Construction Submittals. Once all Pre-Construction Submittals have been approved and the Contractor is ready to mobilize, the VA will schedule a Construction Kickoff Meeting with the Contractor. 6. Phase 4: Construction Period i. Duration is anticipated to be 245 calendar days and shall be completed no later than NTP + 335 calendar days. All applicable documentation in Phases 1, 2, 3, and any other submittals required to mobilize must be approved by the COR prior to commencement of work by the Contractor. No demolition or construction shall be started without COR review and approval of those items listed in the Pre- Construction Period unless authorized in writing by the COR or the CO. 7. Phase 5: Post-Substantial Completion Period i. Duration is anticipated to be 75 calendar days and shall be completed no later than NTP + 410 calendar days. The Contractor shall provide all required materials within 45 days of reaching Post Substantial Completion (NTP + 380 calendar days). The Contractor shall provide the following: a. Inspection and Approval by the COR and/or the CO b. Final Approval and Benefic

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238210)