Z2DZ--FY26 NRM -Replace FTD Fuel Dispenser 539-25-504

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C25026Q0564
NAICS
236220
PSC
Z2DZ
Posted
June 15, 2026
Response due
June 30, 2026

What this opportunity is

The Department of Veterans Affairs is soliciting bids for the replacement of a fuel dispenser (FTD) at a medical center, classified under NAICS 236220 for general construction. This opportunity is suitable for small businesses capable of providing labor, materials, and supervision for demolition, construction, and structural surveys as outlined in the specifications. Interested contractors should note that site visits require prior appointment, and the solicitation is available online, indicating a need for tracking rather than immediate bidding.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

06-01-24 00 01 10-1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24 01 33 23 Shop Drawings, Product Data, and Samples 11-23 01 35 26 Safety Requirements for Major Projects 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 74 19 Construction Waste Management 04-22 02 41 00 DEMOLITION 08-17 03 30 00 CAST-IN-PLACE CONCRETE 01-21 07 21 13 THERMAL INSULATION 01-21 26 05 11 ELECTRICAL 11-22 32 05 23 EXTERIOR IMPROVEMENTS 08-16 -- 1 of 201 -- 11-01-21 01 00 00 -1 SECTION 01 00 00 GENERAL REQUIREMENTS GENERAL 1.1 SAFETY REQUIREMENTS A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. 1.2 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 539-25-504 Replace FTD Fuel Dispenser as required by drawings and specifications. B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer. 1.3 STATEMENT OF BID ITEM(S) A. ITEM I, GENERAL CONSTRUCTION: BASE BID: Contractor to provide all labor, materials, equipment, supervision to repair joint sealants and failed concrete as laid out in construction drawings. B. ITEM II, SURVEY: BASE BID: Contractor to provide all labor, materials, equipment, supervision to complete structural survey of current conditions as laid out in drawing general notes and SOW. 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. -- 2 of 201 -- 11-01-21 01 00 00 -2 B. Security Procedures: 1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. 2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. 3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time. 4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. C. Key Control: 1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. 2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate. D. Document Control: 1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”. 2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This -- 3 of 201 -- 11-01-21 01 00 00 -3 information shall be shared only with those with a specific need to accomplish the project. 3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request. 4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer. 5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA. 6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”. 7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS). Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed. E. Motor Vehicle Restrictions 1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies. 2. No contractor parking onsite. -- 4 of 201 -- 11-01-21 01 00 00 -4 1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10) A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall ho

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)