Federal Contractor Profile
Ahtna-cdm Smith Jv
Federal contracting record: $121M obligated across 28 awards from 2 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
PCNBBY9CJAJ6
CAGE Code
75T10
Address
3200 EL CAMINO REAL, STE 240, IRVINE, CA, 926021381
First Federal Award
Mar 9, 2016
Most Recent Award
Jul 28, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$120M
100.0% of total obligations
- Environmental Protection Agency$25K
0.0% of total obligations
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Jun 17, 2026 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $122K |
| Jun 5, 2026 | Department of DefenseFA8903 772 ESS PK | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $8K |
| May 8, 2026 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $28K |
| Jan 21, 2026 | Department of DefenseFA8903 772 ESS PK | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $673K |
| Dec 29, 2025 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $261K |
| Dec 11, 2025 | Department of DefenseFA4686 9 CONS PK | 236220 | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS | $43K |
| Sep 16, 2025 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $65K |
| Jul 10, 2025 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $24K |
| May 9, 2025 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $28K |
| Feb 7, 2025 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $968K |
| Nov 26, 2024 | Department of DefenseFA4686 9 CONS PK | 236220 | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS | $36K |
| Sep 6, 2024 | Department of DefenseFA8903 772 ESS PK | 236220 | DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB | $500K |
| Aug 11, 2024 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $1.7M |
| Apr 17, 2024 | Department of DefenseFA4686 9 CONS PK | 236220 | SOUTH APRON CONCRETE EXPANSION PROJECT | $122K |
| Apr 10, 2024 | Department of DefenseFA4621 22 CONS PK | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $25M |
| Jan 30, 2024 | Department of DefenseFA8903 772 ESS PK | 236220 | DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB | $5.4M |
| Jan 10, 2024 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $1.1M |
| Nov 17, 2023 | Department of DefenseFA4686 9 CONS PK | 236220 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT. | $89K |
| Nov 16, 2023 | Department of DefenseFA4686 9 CONS PK | 236220 | THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND THE REPLACEMENT THROUGH THE CONSTRUCTION OF A CONCRETE MASONRY UNIT CMU WALL. ADDITIONALLY THERE IS A ROOF LIKE STRUCTURE ON TOP TO DETER CRITTERS (AKA RACOON ROOF). | $35K |
| Sep 28, 2023 | Department of DefenseFA8903 772 ESS PK | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $5.5M |
| Sep 28, 2023 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $12M |
| Sep 22, 2023 | Department of DefenseFA8903 772 ESS PK | 236220 | DESIGN AND CONSTRUCTION SERVICES FOR CARGO DEPLOYMENT RAMP REPAIR, EBBING ANGB, FT. SMITH, AR. | $7.3M |
| Aug 11, 2023 | Department of DefenseFA4686 9 CONS PK | 236220 | DESIGN AND REPLACE BOILERS FOR DORMS. | $113K |
| Jun 30, 2023 | Department of DefenseFA4686 9 CONS PK | 236220 | CONSTRUCTION: B1068 REPLACE FIRE SUPPRESSION AND ALARM SYSTEMS | $3.2M |
| Sep 13, 2022 | Department of DefenseFA4686 9 CONS PK | 236220 | AIRFIELD PAINTING AND RUBBER REMOVAL | $293K |
Want to win work like Ahtna-cdm Smith Jv?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.