Federal Contractor Profile
Ahtna-cdm Smith Jv
$121M obligated·28 awards·2 agencies·2 NAICS
Federal Contracts
Showing award actions 1–50 of 55 funded award actions, most recent first.
- Contracts with positive obligations
- 28
- Funded award actions shown
- 55
- Obligations shown
- $121M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of July 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jul 21, 2026 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $231K |
| Jun 30, 2026 | Department of DefenseFA8903 772 ESS PK | FA890323F0146 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $754K |
| Jun 17, 2026 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $122K |
| Jun 5, 2026 | Department of DefenseFA8903 772 ESS PK | FA890323F0130 | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $8K |
| May 8, 2026 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $28K |
| Jan 21, 2026 | Department of DefenseFA8903 772 ESS PK | FA890323F0130 | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $673K |
| Dec 29, 2025 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $261K |
| Dec 11, 2025 | Department of DefenseFA4686 9 CONS PK | FA468622F0041 | 236220 | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS | $43K |
| Sep 16, 2025 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $65K |
| Jul 10, 2025 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $24K |
| May 9, 2025 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $28K |
| Feb 7, 2025 | Department of DefenseFA8903 772 ESS PK | FA890323F0146 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $968K |
| Nov 26, 2024 | Department of DefenseFA4686 9 CONS PK | FA468622F0041 | 236220 | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS | $36K |
| Sep 6, 2024 | Department of DefenseFA8903 772 ESS PK | FA890324F0030 | 236220 | DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB | $500K |
| Aug 11, 2024 | Department of DefenseFA8903 772 ESS PK | FA890323F0146 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $1.7M |
| Apr 17, 2024 | Department of DefenseFA4686 9 CONS PK | FA468621F0076 | 236220 | SOUTH APRON CONCRETE EXPANSION PROJECT | $122K |
| Apr 10, 2024 | Department of DefenseFA4621 22 CONS PK | FA462124F0017 | 236220 | INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF. | $25M |
| Jan 30, 2024 | Department of DefenseFA8903 772 ESS PK | FA890324F0030 | 236220 | DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB | $5.4M |
| Jan 10, 2024 | Department of DefenseFA8903 772 ESS PK | FA890323F0146 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $1.1M |
| Nov 17, 2023 | Department of DefenseFA4686 9 CONS PK | FA468620F0120 | 236220 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT. | $89K |
| Nov 16, 2023 | Department of DefenseFA4686 9 CONS PK | FA468622F0036 | 236220 | THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND THE REPLACEMENT THROUGH THE CONSTRUCTION OF A CONCRETE MASONRY UNIT CMU WALL. ADDITIONALLY THERE IS A ROOF LIKE STRUCTURE ON TOP TO DETER CRITTERS (AKA RACOON ROOF). | $35K |
| Sep 28, 2023 | Department of DefenseFA8903 772 ESS PK | FA890323F0130 | 236220 | REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA | $5.5M |
| Sep 28, 2023 | Department of DefenseFA8903 772 ESS PK | FA890323F0146 | 236220 | DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR. | $12M |
| Sep 22, 2023 | Department of DefenseFA8903 772 ESS PK | FA890323F0145 | 236220 | DESIGN AND CONSTRUCTION SERVICES FOR CARGO DEPLOYMENT RAMP REPAIR, EBBING ANGB, FT. SMITH, AR. | $7.3M |
| Aug 11, 2023 | Department of DefenseFA4686 9 CONS PK | FA468622F0005 | 236220 | DESIGN AND REPLACE BOILERS FOR DORMS. | $113K |
| Jun 30, 2023 | Department of DefenseFA4686 9 CONS PK | FA468623F0022 | 236220 | CONSTRUCTION: B1068 REPLACE FIRE SUPPRESSION AND ALARM SYSTEMS | $3.2M |
| Sep 13, 2022 | Department of DefenseFA4686 9 CONS PK | FA468622F0047 | 236220 | AIRFIELD PAINTING AND RUBBER REMOVAL | $293K |
| Sep 12, 2022 | Department of DefenseFA4686 9 CONS PK | FA468622F0041 | 236220 | DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS | $2.0M |
| Aug 31, 2022 | Department of DefenseFA4686 9 CONS PK | FA468622F0036 | 236220 | THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND THE REPLACEMENT THROUGH THE CONSTRUCTION OF A CONCRETE MASONRY UNIT CMU WALL. ADDITIONALLY THERE IS A ROOF LIKE STRUCTURE ON TOP TO DETER CRITTERS (AKA RACOON ROOF). | $1.3M |
| Jul 5, 2022 | Department of DefenseFA4686 9 CONS PK | FA468622F0005 | 236220 | DESIGN AND REPLACE BOILERS FOR DORMS. | $50K |
| Feb 8, 2022 | Department of DefenseFA4686 9 CONS PK | FA468622F0005 | 236220 | DESIGN AND REPLACE BOILERS FOR DORMS. | $474K |
| Sep 30, 2021 | Department of DefenseFA4686 9 CONS PK | FA468621F0098 | 236220 | REC TASK ORDER TO REPLACE THE FIRE SUPPRESSION SYSTEM AT B1073 AT BEALE AFB | $771K |
| Sep 30, 2021 | Department of DefenseFA5215 766 ESS PKP | FA521520F0022 | 236220 | WHEELER GENERATOR REPLACEMENT AT B310 | $783K |
| Sep 23, 2021 | Department of DefenseFA4686 9 CONS PK | FA468621F0076 | 236220 | SOUTH APRON CONCRETE EXPANSION PROJECT | $1.2M |
| Sep 22, 2021 | Department of DefenseFA4686 9 CONS PK | FA468620F0112 | 236220 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE. | $22K |
| Sep 16, 2021 | Department of DefenseFA4686 9 CONS PK | FA468621F0067 | 236220 | RUBBER REMOVAL AND PAINT | $649K |
| Jun 30, 2021 | Department of DefenseFA4686 9 CONS PK | FA468620F0120 | 236220 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT. | $128K |
| Mar 23, 2021 | Department of DefenseFA8903 772 ESS PK | FA890320F1078 | 236220 | REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X | $374K |
| Mar 8, 2021 | Department of DefenseFA4686 9 CONS PK | FA468620F0120 | 236220 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT. | $52K |
| Jan 20, 2021 | Department of DefenseFA8903 772 ESS PK | FA890320F1078 | 236220 | REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X | $168K |
| Nov 10, 2020 | Department of DefenseFA8903 772 ESS PK | FA890320F1078 | 236220 | REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X | $297K |
| Sep 30, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0112 | 236220 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE. | $240K |
| Sep 29, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0112 | 236220 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE. | $115K |
| Sep 28, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0112 | 236220 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE. | $115K |
| Sep 24, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0120 | 236220 | INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT. | $747K |
| Sep 23, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0112 | 236220 | REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE. | $153K |
| Sep 22, 2020 | Department of DefenseFA4686 9 CONS PK | FA468620F0114 | 236220 | HVAC REPLACEMENT AT PAVE PAWS | $215K |
| Jul 22, 2020 | Department of DefenseFA5215 766 ESS PKP | FA521520F0022 | 236220 | WHEELER GENERATOR REPLACEMENT AT B310 | $737K |
| Apr 3, 2020 | Department of DefenseFA8903 772 ESS PK | FA890320F1078 | 236220 | REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X | $22M |
| Sep 28, 2018 | Department of DefenseFA8903 772 ESS PK | FA890318F0011 | 236220 | IGF::OT:IGF DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR DIESEL BULK FUELS STORAGE AT TATALINA AND CAPE NEWENHAM LONG RANGE RADAR SITE | $265K |
Get Alerted Before Ahtna-cdm Smith Jv's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free