Skip to content

Federal Contractor Profile

Ahtna-cdm Smith Jv

$121M obligated·28 awards·2 agencies·2 NAICS

Federal Contracts

Showing award actions 1–50 of 55 funded award actions, most recent first.

Contracts with positive obligations
28
Funded award actions shown
55
Obligations shown
$121M
Awarding agencies
2

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of July 28, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Jul 21, 2026Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$231K
Jun 30, 2026Department of DefenseFA8903 772 ESS PKFA890323F0146236220DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR.$754K
Jun 17, 2026Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$122K
Jun 5, 2026Department of DefenseFA8903 772 ESS PKFA890323F0130236220REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA$8K
May 8, 2026Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$28K
Jan 21, 2026Department of DefenseFA8903 772 ESS PKFA890323F0130236220REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA$673K
Dec 29, 2025Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$261K
Dec 11, 2025Department of DefenseFA4686 9 CONS PKFA468622F0041236220DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS$43K
Sep 16, 2025Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$65K
Jul 10, 2025Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$24K
May 9, 2025Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$28K
Feb 7, 2025Department of DefenseFA8903 772 ESS PKFA890323F0146236220DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR.$968K
Nov 26, 2024Department of DefenseFA4686 9 CONS PKFA468622F0041236220DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS$36K
Sep 6, 2024Department of DefenseFA8903 772 ESS PKFA890324F0030236220DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB$500K
Aug 11, 2024Department of DefenseFA8903 772 ESS PKFA890323F0146236220DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR.$1.7M
Apr 17, 2024Department of DefenseFA4686 9 CONS PKFA468621F0076236220SOUTH APRON CONCRETE EXPANSION PROJECT$122K
Apr 10, 2024Department of DefenseFA4621 22 CONS PKFA462124F0017236220INTERIOR REPAIR AND REMODELING OF 188 DORMITORY ROOMS, COMMON SPACES, AND REPLACEMENT OF THE EXTERIOR MASONRY VENEER ON THIS 3 STORY DORMITORY FACILITY WITH A NEW EIFS WALL SYSTEM AND A NEW SSMRS ROOF.$25M
Jan 30, 2024Department of DefenseFA8903 772 ESS PKFA890324F0030236220DEMOLISH 1.25-MILE PIPELINE BETWEEN DFSP NEWINGTON AND PEASE ANGB$5.4M
Jan 10, 2024Department of DefenseFA8903 772 ESS PKFA890323F0146236220DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR.$1.1M
Nov 17, 2023Department of DefenseFA4686 9 CONS PKFA468620F0120236220INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT.$89K
Nov 16, 2023Department of DefenseFA4686 9 CONS PKFA468622F0036236220THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND THE REPLACEMENT THROUGH THE CONSTRUCTION OF A CONCRETE MASONRY UNIT CMU WALL. ADDITIONALLY THERE IS A ROOF LIKE STRUCTURE ON TOP TO DETER CRITTERS (AKA RACOON ROOF).$35K
Sep 28, 2023Department of DefenseFA8903 772 ESS PKFA890323F0130236220REPAIR FUEL TANKS AT MAXWELL AFB, ALABAMA$5.5M
Sep 28, 2023Department of DefenseFA8903 772 ESS PKFA890323F0146236220DESIGN-BUILD CONSTRUCTION SERVICES TO REPAIR/REFURBISH MAIN RAMP, AIRCRAFT SUNSHADES, AND TAXIWAY AT EBBING ANGB, FORT SMITH, AR.$12M
Sep 22, 2023Department of DefenseFA8903 772 ESS PKFA890323F0145236220DESIGN AND CONSTRUCTION SERVICES FOR CARGO DEPLOYMENT RAMP REPAIR, EBBING ANGB, FT. SMITH, AR.$7.3M
Aug 11, 2023Department of DefenseFA4686 9 CONS PKFA468622F0005236220DESIGN AND REPLACE BOILERS FOR DORMS.$113K
Jun 30, 2023Department of DefenseFA4686 9 CONS PKFA468623F0022236220CONSTRUCTION: B1068 REPLACE FIRE SUPPRESSION AND ALARM SYSTEMS$3.2M
Sep 13, 2022Department of DefenseFA4686 9 CONS PKFA468622F0047236220AIRFIELD PAINTING AND RUBBER REMOVAL$293K
Sep 12, 2022Department of DefenseFA4686 9 CONS PKFA468622F0041236220DESIGN AND CONSTRUCTION OF A CRAH (COMPUTER ROOM AIR HANDLER) BASED HVAC SYSTEM. A MINIMUM NET COOLING CAPACITY OF 9.175 TONS SHALL BE PROVIDED PER CRAH UNIT SUPPLIED. 4 NEW CRAH UNITS AND A PAIRED CHILLER SHALL BE PROVIDED. POP: 469 CALENDAR DAYS$2.0M
Aug 31, 2022Department of DefenseFA4686 9 CONS PKFA468622F0036236220THE REMOVAL OF A CHAIN LINKED FENCE AROUND THE MAIN ELECTRICAL SWITCH YARD, AND THE REPLACEMENT THROUGH THE CONSTRUCTION OF A CONCRETE MASONRY UNIT CMU WALL. ADDITIONALLY THERE IS A ROOF LIKE STRUCTURE ON TOP TO DETER CRITTERS (AKA RACOON ROOF).$1.3M
Jul 5, 2022Department of DefenseFA4686 9 CONS PKFA468622F0005236220DESIGN AND REPLACE BOILERS FOR DORMS.$50K
Feb 8, 2022Department of DefenseFA4686 9 CONS PKFA468622F0005236220DESIGN AND REPLACE BOILERS FOR DORMS.$474K
Sep 30, 2021Department of DefenseFA4686 9 CONS PKFA468621F0098236220REC TASK ORDER TO REPLACE THE FIRE SUPPRESSION SYSTEM AT B1073 AT BEALE AFB$771K
Sep 30, 2021Department of DefenseFA5215 766 ESS PKPFA521520F0022236220WHEELER GENERATOR REPLACEMENT AT B310$783K
Sep 23, 2021Department of DefenseFA4686 9 CONS PKFA468621F0076236220SOUTH APRON CONCRETE EXPANSION PROJECT$1.2M
Sep 22, 2021Department of DefenseFA4686 9 CONS PKFA468620F0112236220REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE.$22K
Sep 16, 2021Department of DefenseFA4686 9 CONS PKFA468621F0067236220RUBBER REMOVAL AND PAINT$649K
Jun 30, 2021Department of DefenseFA4686 9 CONS PKFA468620F0120236220INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT.$128K
Mar 23, 2021Department of DefenseFA8903 772 ESS PKFA890320F1078236220REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X$374K
Mar 8, 2021Department of DefenseFA4686 9 CONS PKFA468620F0120236220INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT.$52K
Jan 20, 2021Department of DefenseFA8903 772 ESS PKFA890320F1078236220REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X$168K
Nov 10, 2020Department of DefenseFA8903 772 ESS PKFA890320F1078236220REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X$297K
Sep 30, 2020Department of DefenseFA4686 9 CONS PKFA468620F0112236220REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE.$240K
Sep 29, 2020Department of DefenseFA4686 9 CONS PKFA468620F0112236220REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE.$115K
Sep 28, 2020Department of DefenseFA4686 9 CONS PKFA468620F0112236220REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE.$115K
Sep 24, 2020Department of DefenseFA4686 9 CONS PKFA468620F0120236220INSTALL JET BLAST DEFLECTORS AT TWO LOCATIONS, DESIGN AND CONSTRUCT ENGINE RUN ATTACH POINT, TEST ENGINE ATTACH POINT AND PROVIDE REPORT.$747K
Sep 23, 2020Department of DefenseFA4686 9 CONS PKFA468620F0112236220REMOVE, REPLACE, DESIGN, AND CONSTRUCT AIRFIELD SECURITY GATES ALONG THE FLIGHT LINE.$153K
Sep 22, 2020Department of DefenseFA4686 9 CONS PKFA468620F0114236220HVAC REPLACEMENT AT PAVE PAWS$215K
Jul 22, 2020Department of DefenseFA5215 766 ESS PKPFA521520F0022236220WHEELER GENERATOR REPLACEMENT AT B310$737K
Apr 3, 2020Department of DefenseFA8903 772 ESS PKFA890320F1078236220REPAIR 400 AIRCRAFT PARKING RAMP PHASE 2&REPAIR TAXIWAY NOVEMBER ADJACENT TO 400 RAMP, TRAVIS AFB, CA PROJECT NO(S). X$22M
Sep 28, 2018Department of DefenseFA8903 772 ESS PKFA890318F0011236220IGF::OT:IGF DESIGN BUILD CONSTRUCTION SERVICES FOR REPAIR DIESEL BULK FUELS STORAGE AT TATALINA AND CAPE NEWENHAM LONG RANGE RADAR SITE$265K

Get Alerted Before Ahtna-cdm Smith Jv's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free