Federal Contractor Profile
All-rite Construction, INC.
$54M obligated·412 awards·2 agencies·5 NAICS
Federal Contracts
Showing contracts 51–100 of 486 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 29, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0235 | 236220 | BANDELIER NATIONAL MONUMENT - CONSTRUCTION OF FIVE (5) SHEDS 10 FOOT W X 10 FOOT L X 8 FOOT H TO BE FRAMED WITH LUMBER AND SAT UPON ONE BASE COURSE OF CONCRETE FILLED CINDERBLOCKS BURIED 6IN DEEP AND 3 COAT STUCCO WITH MESH EXTERIOR COLOR TBD DOWN | $17K |
| Nov 1, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0175 | 236220 | AMISTAD NATIONAL RECREATION AREA - REMOVE OTR TIRES FROM PARK. THE AMISTAD DIABLO EAST TIRE DISPOSAL PROJECT INCLUDES A TURN-KEY SUBCONTRACTOR; INCLUDES SPECIAL CONSTRUCTION SERVICES - TIRE DISPOSAL, TRAFFIC COORDINATION & PERMITTING, MANIFES | $32K |
| Sep 21, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0046 | 236220 | GRCA-WATER TANK FENCING: PHANTOM,HERMITS | $4K |
| Sep 19, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0235 | 236220 | BANDELIER NATIONAL MONUMENT - CONSTRUCTION OF FIVE (5) SHEDS 10 FOOT W X 10 FOOT L X 8 FOOT H TO BE FRAMED WITH LUMBER AND SAT UPON ONE BASE COURSE OF CONCRETE FILLED CINDERBLOCKS BURIED 6IN DEEP AND 3 COAT STUCCO WITH MESH EXTERIOR COLOR TBD DOWN | $80K |
| Sep 19, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0073 | 236220 | HB13 DOOR AND WINDOW REPLACMENT | $126K |
| Sep 14, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0062 | 236220 | GLCA REHABILITATE LEES FERRY CAMPGROUND | $650K |
| Sep 6, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0212 | 236220 | BANDELIER NATIONAL MONUMENT - REPLACE DECKS IN QUARTERS 100 AND 102. THIS CONTRACT CONSISTS OF DEMOLITION AND CONSTRUCTION OF ONE (1) 10X 30 PATIO DECK AND THE CONSTRUCTION OF ONE (1) 10 X 30 PATIO DECK, BOTH CONSTRUCTED OUT OF TREATED LUMBER. DEC | $19K |
| Sep 5, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0208 | 236220 | GUADALUPE MOUNTAINS NATIONAL PARK - CONTRACT REQUIRES REPLACEMENT OF EXISTING WINDOWS, DOORS, REMOVING LAP SIDING AND INSTALLING AN ELASTOMERIC STUCCO SYSTEM. THIS WORK WILL BE PERFORMED ON HOUSING UNITS Q317 AND Q318. THE HOUSING UNITS ARE LOCATED W | $178K |
| Aug 23, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0188 | 236220 | BAND-HB-30 FIRE TOWER EXTERIOR REHABIT. | $119K |
| Aug 16, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0050 | 236220 | GRAND CANYON NATIONAL PARK (GRCA) REQUIRES THE REPLACEMENT OF THE DAYCARE ROOF SABER TO 140P1519D0001/140P1523F0050 AZ23-115 -PER THE NATIONAL PARK SERIVCE SCOPE OF WORK NPS/COR: BENJAMIN STINNETT, BENJAMIN_STINNETT@NPS.GOV, 928-525-6057 LOCATI | $188K |
| Aug 15, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0175 | 236220 | AMISTAD NATIONAL RECREATION AREA - REMOVE OTR TIRES FROM PARK. THE AMISTAD DIABLO EAST TIRE DISPOSAL PROJECT INCLUDES A TURN-KEY SUBCONTRACTOR; INCLUDES SPECIAL CONSTRUCTION SERVICES - TIRE DISPOSAL, TRAFFIC COORDINATION & PERMITTING, MANIFES | $132K |
| Aug 15, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0038 | 236220 | SEAZ PAINTING PROJECT BUNDLE, COORDINATE WITH PARK COR/POC. MR. SAM BELL-TN: (520) 274-0535 EMAIL: SAM_BELL@NPS.GOV | $446K |
| Aug 11, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0046 | 236220 | GRCA-WATER TANK FENCING: PHANTOM,HERMITS | $126K |
| Aug 10, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0144 | 236220 | CARSLBAD CAVERNS NP-REBUILD LOADING DOCK AND STAIRS | $178K |
| Aug 3, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0146 | 236220 | LAKE MEREDITH NATIONAL RECREATION AREA - REPLACEMENT OF THE SANFORD YAKE BREAKWATER SYSTEM. THIS IS A FIRM FIXED PRICE CONTRACT TO INCLUDE THE REMOVAL AND REPLACEMENT OF THE CURRENT WAVEBREAK SYSTEM AT SANFORD YAKE MARINA AND BOAT RAMP AT LAKE ME | $564K |
| Aug 1, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0162 | 236220 | PECOS NATIONAL HISTORICAL PARK - INSTALL SPLIT SYSTEM HVAC | $19K |
| Jul 31, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0041 | 236220 | GRAND CANYON NP(GRCA) REQUIRES THE REPLACEMENT OF THE FAILED ROOF DRAINAGE ON THE SOUTH RIM HEADQUARTERS BUILDING.ARIZONA SABER TO 140P1519D0001/140P1523F0041 -PER THE NATIONAL PARK SERVICE SCOPE OF WORK -HEAT TAPE ASSEMBLY, DESIGN AND INSTALLATIO | $215K |
| Jul 27, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0039 | 236220 | WEAVER HOUSE PRESERVATION MAINTENANCE, PARK POC TARYN PRESTON TARYN_PRESTON_NPS.GOV OR AMY SCHOTT AMY_SCHOTT@NPS.GOV | $87K |
| Jul 19, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0138 | 236220 | SAPU-BATHROOM FIXTURE REPLACE-GQ, QU, VC | $86K |
| Jul 19, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0148 | 236220 | SAPU REPAIR AND RESTORE QUARAI MUSEUM | $170K |
| Jul 18, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0029 | 236220 | PEFO PAINTED DESERT 207 AND 209 HVAC | $92K |
| Jul 11, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0129 | 236220 | WACO MAMMOTH NATIONAL MONUMENT-DIG SHELTER LIGHTNING PROTECTION | $24K |
| Jul 11, 2023 | Department of the InteriorIMR INTERMOUNTAIN REGION(1200) | 140P1223F0056 | 236220 | RECONFIGURE VISITOR'S CENTER DESK AT PIPE SPRINGS NATIONAL MONUMENT | $88K |
| Jul 11, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0038 | 236220 | AMIS RESTORE GOVERNORS LANDING AMPHITHEATER | $11K |
| Jul 6, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0124 | 236220 | CHAM - CYCLIC TRAIL MAINTENANCE | $214K |
| Jun 27, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0027 | 236220 | GRCA-WATER SAMPLING STATIONS PARK POC/COR BENJAMIN STINNETT, TELEPHONE: (928) 525-6057, EMAIL: BENJAMIN_STINNETT@NPS.GOV | $85K |
| Jun 22, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0109 | 236220 | SAN ANTONIO MISSIONS NATIONAL HISTORICAL PARK - REPAIR GRISTMILL CONTROLS AND PUMPS. THIS CONTRACT CONSISTS OF, BUT NOT LIMITED TO, THE REPLACEMENT/REPAIR OF THE GRISTMILL LIFT STATION ASSOCIATED COMPONENTS. THE EXISTING LIFT STATION PROVIDES WATE | $134K |
| Jun 13, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0104 | 236220 | CARLSBAD CAVERNS NATIONAL PARK, REPAIR AND REPLACE LIFT STATION EQUIPMENT | $165K |
| Jun 13, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0105 | 236220 | CHICKASAW NATIONAL RECREATION AREA - TRAVERTINE NATURE CENTER THIS CONTRACT CONSISTS OF THE REMOVAL AND REPLACEMENT OF THE FRONT AND SIDE DOUBLE STOREFRONT DOORS, ACOUSTIC CEILING TILES, FLOOR COVERINGS, PAINTING OF OFFICES AND INSTALLATION OF A | $160K |
| Jun 9, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0175 | 236220 | SAN ANTONIO MISSIONS NHP - INSTALL NEW WATERLINE AND FIBER CONDUIT, POOLEY PROPERTY ALL WORK SHALL BE ACCOMPLISHED UNDER THE SUPERVISION OF A LICENSED CONTRACTOR AND ACCORDING TO THE SCOPE OF WORK, AND THE NATIONAL PARK SERVICE CONTRACTUAL REQUIR | $4K |
| Jun 7, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0171 | 236220 | RETROFIT LIGHTING WITH LED BULBS - OSTB PROVIDE AND INSTALL NEW DIRECT WIRED DIMMABLE LED LAMPS IN EXISTING FIXTURES SPECIFIED THROUGHOUT THE OLD SANTA FE TRAIL BUILDING OSTB, APPROXIMATELY 268 FIXTURES. | $19K |
| Jun 1, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0095 | 236220 | BAND CLEAN ROAD CULVERTS | $61K |
| May 15, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0086 | 236220 | GUADALUPE MOUNTAINS NATIONAL PARK -BOILER REPLACEMENT | $208K |
| Apr 25, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0229 | 236220 | WHITE SANDS NATIONAL MONUMENT - 261166 REPALCE PICNIC SHELTERS | $4K |
| Apr 25, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0072 | 236220 | PADRE ISLAND NATIONAL SEASHORE - EMERGENCY HVAC REPAIR THIS CONTRACT CONTAINS, BUT NOT LIMITED TO, THE REPLACEMENT OF CONDENSER WITH NEW LENNOX EL SERIES COMPLETE SYSTEM. DUEL REFRIGERANT CIRCUIT 2 STAGE SYSTEM. 2INCH FILTER RACK AND BELT DRIVE BL | $78K |
| Apr 11, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1523F0017 | 236220 | SAGUARO NP (SAGU) REQUIRES THE REPLACEMENT OF DOORS AT RINCON MOUNTAIN (RMD) AND TUCSON MOUNTAIN DISTRICTS (TMD) SABER CONTRACT PARK COR/POC: RICH GOEPFRICH; RICHARD_GOEPFRICH@NPS.GOV, 520-733-5140 CONTRACT OFFICER: TAYLOR JONES, TAYLOR_A_JONES@NP | $146K |
| Mar 15, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0048 | 236220 | REPLACE ALFL VISITOR CENTER FIRE PUMP REMOVE AND REPLACE THE EXISTING FIRE PUMP AND MOTOR WITH A 500GPM RATED AT 65PSI. ELECTRICAL TO INCLUDE DISCONNECTING THE POWER WIRING FROM EXISTING PUMP, MOTOR AND CONTROLLER PRIOR TO REMOVAL, AND UPON INSTAL | $49K |
| Mar 9, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0038 | 236220 | AMIS RESTORE GOVERNORS LANDING AMPHITHEATER | $148K |
| Feb 13, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0171 | 236220 | RETROFIT LIGHTING WITH LED BULBS - OSTB PROVIDE AND INSTALL NEW DIRECT WIRED DIMMABLE LED LAMPS IN EXISTING FIXTURES SPECIFIED THROUGHOUT THE OLD SANTA FE TRAIL BUILDING OSTB, APPROXIMATELY 268 FIXTURES. | $49K |
| Jan 24, 2023 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0086 | 236220 | MONTEZUMA CASTLE VISITOR CENTER (MOCA) RESTROOM REHABILITATION PROJECT AZ MABO SABER TO POC/PI: GREG WOLCOTT, GREG_WOLCOTT@NPS.GOV, 928-567-5276 X 223 COR: THEODORE RAMLAL, THEODORE_RAMLAL@NPS.GOV, 602-794-3827 CS: TAYLOR JONES, TAYLOR_A_JONES@NP | $4K |
| Jan 17, 2023 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0019 | 236220 | OLD SANTA FE TRAIL BUILDING OSTB- REPAIR AND REPAINT GREAT ROOM THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REPAIR OF PLASTER WALL FINISHES AND PAINT APPROXIMATELY 3,200 SQUARE FEET OF WALL SURFACE, STAIN THE INTERIORS OF | $60K |
| Dec 6, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1323F0006 | 236220 | PECO EXHIBIT DEMO AND ROOM PREP -211142C | $88K |
| Sep 21, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0197 | 236220 | PAINTING & FLOORING IN OFFICES - OSTB THE PRIMARY WORK OF THIS PROJECT IS THE REPAIR OF PLASTER WALL FINISHES, AND PAINTING OF APPROXIMATELY 660 SQUARE FEET OF WALL SURFACES, 4 WINDOWS AND TRIM, AND STAINING OF THREE DOORS AND TRIM. | $2K |
| Sep 19, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0230 | 236220 | WHITE SANDS NATIONAL PARK VISITOR CENTER RESTORE SIDEWALKS PMIS 268451 THIS CONTRACT DEMOLISHES AND REPLACES APPROXIMATELY 10,000 SQUARE FEET OF CONCRETE SIDEWALK. ALL WORK SHALL MEET ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS. THIS INCLU | $284K |
| Sep 19, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0086 | 236220 | MONTEZUMA CASTLE VISITOR CENTER (MOCA) RESTROOM REHABILITATION PROJECT AZ MABO SABER TO POC/PI: GREG WOLCOTT, GREG_WOLCOTT@NPS.GOV, 928-567-5276 X 223 COR: THEODORE RAMLAL, THEODORE_RAMLAL@NPS.GOV, 602-794-3827 CS: TAYLOR JONES, TAYLOR_A_JONES@NP | $305K |
| Sep 19, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0229 | 236220 | WHITE SANDS NATIONAL MONUMENT - 261166 REPALCE PICNIC SHELTERS | $194K |
| Sep 15, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0228 | 236220 | BANDALIER NATIONAL MONUMENT-REPLACE VC INFORMATION FEE DESK | $41K |
| Sep 6, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0202 | 236220 | BIG BEND NATIONAL PARK - REPLACE WATER LINE - KBAR WELL 5 THIS PROJECT INCLUDES INSTALLATION OF APPROXIMATELY 1,177 LINEAR FEET OF 3" HDPE SDR 11 WATERLINE AT 4' MINIMUM BURY DEPTH. NEW WATER LINE WILL BE INTEGRATED INTO THE KBAR WELL 5 | $249K |
| Sep 1, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0195 | 236220 | WHITE SANDS NATIONAL PARK, RE-STUCCO EXTERIOR OF MAINTENANCE BUILDING | $222K |
| Aug 31, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0197 | 236220 | PAINTING & FLOORING IN OFFICES - OSTB THE PRIMARY WORK OF THIS PROJECT IS THE REPAIR OF PLASTER WALL FINISHES, AND PAINTING OF APPROXIMATELY 660 SQUARE FEET OF WALL SURFACES, 4 WINDOWS AND TRIM, AND STAINING OF THREE DOORS AND TRIM. | $7K |
Get Alerted Before All-rite Construction, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free