| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 29, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0193 | 236220 | MONTEZUMA CASTLE NATIONAL MONUMENT - REPLACE LIFT STATION THIS CONTRACT CONSISTS OF, BUT NOT LIMITED TO, THE COMPLETE REMOVAL AND REPLACEMENT OF THE EXISTING SMITH & LOVELESS (S&L) LIFT STATION AND ALL ASSOCIATED COMPONENTS AT MONTEZUMA CA | $467K |
| Aug 26, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0076 | 236220 | SAGU EXTERIOR PAINTING TMD BUILDINGS | $369K |
| Aug 24, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0187 | 236220 | CYCLIC MAINTENANCE ON VC LIFT STATION - ELMA THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, CYCLIC MAINTENANCE ON THE LIFT STATION AT THE EL MALPAIS VISITOR CENTER. | $151K |
| Aug 23, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0184 | 236220 | REPLACE HISTORIC WINDOWS AT VC - PII - ELMO THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 20 WINDOW GLAZING UNITS ON THE HISTORIC 1961 MISSION 66 VISITOR CENTER. | $100K |
| Aug 22, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0183 | 236220 | PAIS-FY22 REPLACE VC ANCHORING HARDWARE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE SITE WORK FOR PADRE ISLAND NATIONAL SEASHORE. THE WORK TO BE PERFORMED IS AS FOLLOWS: REMOVE AND REPLACE AN ESTIMATED 24 FAILED STRUCTU | $221K |
| Aug 18, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0173 | 236220 | CYCLIC MAINTENANCE OF CONCRETE TRAILS - PAAL THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE SITE WORK FOR ONE SECTION OF THE PALO ALTO BATTLEFIELD PAVED OVERLOOK TRAIL. GENERAL TASKS WILL INCLUDE TEARING OUT A FAILING SECTION | $27K |
| Aug 18, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0172 | 236220 | REHAB VC EXTERIOR DOORS - BAND THE PRIMARY WORK OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE REMOVAL AND INSTALLATION OF EXISTING MECHANICAL DOOR MECHANISM AND DOOR HARDWARE COMPONENTS AT HISTORIC BUILDING 02 (VISITOR CENTER), BANDELIER NATI | $59K |
| Aug 18, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0171 | 236220 | RETROFIT LIGHTING WITH LED BULBS - OSTB PROVIDE AND INSTALL NEW DIRECT WIRED DIMMABLE LED LAMPS IN EXISTING FIXTURES SPECIFIED THROUGHOUT THE OLD SANTA FE TRAIL BUILDING OSTB, APPROXIMATELY 268 FIXTURES. | $122K |
| Aug 11, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0166 | 236220 | BANDALIER NATIONAL MONUMENT - REPLACE EXTERIOR SIDEWALKS / WATER VALVE | $86K |
| Aug 11, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0162 | 236220 | AZRU DEMO BURNSIDE BUILDING | $186K |
| Aug 10, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0159 | 236220 | PADRE ISLAND NATIONAL SEASHORE-HQ GENERATOR REPLACEMENT | $145K |
| Aug 4, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0011 | 236220 | SUCR REPLACE VC FIRE & INTRUSION ALARM | $13K |
| Jul 28, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0148 | 236220 | REPAIR HVAC - OSTB THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REPAIR AND SERVICING OF THE SECOND STORY AIR CONDITIONING UNITS ON THE OLD SANTA FE TRAIL BUILDING, SANTA FE, NEW MEXICO. | $24K |
| Jul 20, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0136 | 236220 | CLEAN & RESTORE FIRE DAMAGED VAULT TOILET - PETR THE PRIMARY WORK OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO CLEAN-UP AND RESTORATION OF FIRE & SMOKE DAMAGE TO ALL INTERIOR AND EXTERIOR SURFACES OF A VAULT TOILET. | $5K |
| Jul 20, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0137 | 236220 | WOODEN ELEMENTS PRESERVATION - OSTB | $57K |
| Jul 11, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0128 | 236220 | CARLSBAD CAVERNS, REBUILD PEDESTRIAN OVERLOOK WALL #3 | $155K |
| Jun 22, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0118 | 236220 | BIG BEND NATIONAL PARK - SCIENCE AND RESOURCES MANAGEMENT BUILDING HVAC RENOVATION. THIS CONTRACT IS FOR THE REPLACEMENT OF EXISTING HEATING, VENTILATION, AND AIR-CONDITIONING (HVAC) EQUIPMENT, COMPONENTS, AND CONTROLS. SYSTEMS AT THE SCRM. THE E | $162K |
| Jun 16, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0048 | 236220 | TUMACACORI NATIONAL HISTORICAL PARK (TUMA)-UPGRADE DATA & COMM WIRING. ARIZONA SABER, PER QUOTE DATED 6/1/2022 PARK POC/COR: DAN GREEN, 520-377-5080, DANIEL_GREEN@NPS.GOV CONTRACTING SPECIALIST: TAYLOR JONES, 520-780-9294, TAYLOR_A_JONES@NPS.G | $53K |
| Jun 7, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0105 | 236220 | ALIBATES NATIONAL FLINT QUARRIES NATIONAL MONUMENT - VISITOR CENTER ROOF REPLACEMENT - PMIS 323079 THE WORK OF THIS CONTRACT IS FOR THE REPLACEMENT OF THE ALIBATES FLINT QUARRIES NATIONAL MONUMENT (ALFL) THERMOPLASTIC MEMBRANE ROOFING SYSTEM WITH | $104K |
| May 25, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0094 | 236220 | AMISTAD NATIONAL RECREATION AREA, RESTRIPING SPUR 454/VAL VERDE COUNTY THE WORK COVERED BY THIS CONTRACT IS PAVEMENT MARKINGS AND STRIPING. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR AND MATERIALS, QUALITY CONTROL, SAFETY AND SUPERINTEN | $35K |
| May 18, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0175 | 236220 | SAN ANTONIO MISSIONS NHP - INSTALL NEW WATERLINE AND FIBER CONDUIT, POOLEY PROPERTY ALL WORK SHALL BE ACCOMPLISHED UNDER THE SUPERVISION OF A LICENSED CONTRACTOR AND ACCORDING TO THE SCOPE OF WORK, AND THE NATIONAL PARK SERVICE CONTRACTUAL REQUIR | $12K |
| Apr 22, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0034 | 236220 | MOCA EMERGENCY REPAIR OF LIFT STATION | $23K |
| Apr 12, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322P0036 | 236220 | INSTALL WATER BOTTLE FILLING STATION`- PETR | $20K |
| Apr 8, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1520F0158 | 236220 | REPLACE SOUTH RIM WASTEWATER TREATMENT PLANT HEADWORKS EQUIPMENT, GRAND CANYON NATIONAL PARK (GRCA) | $15K |
| Mar 15, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0135 | 236220 | WHSA 308850 REPLACE ROOF MEMBRANE | $5K |
| Mar 14, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1322F0041 | 236220 | MINIMUM GUARANTEE TASK ORDER - SF SABER IDIQ CONTRACT | $2K |
| Feb 16, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0117 | 236220 | PEFO - AGATE BRIDGE & PUERCO PUEBLO REPAIRS | $6K |
| Feb 8, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0187 | 236220 | REPLACE PLUMBING AT BAT FLIGHT RESTROOMS - CAVE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES, FINISHES AND ACCESSORIES AT THE BAT FLIGHT COMFORT STATION NEAR THE BAT FLIGHT AMPH | $76K |
| Feb 3, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0130 | 236220 | REPLACE CLINIC FINISHES AT GRAND CANYON NATIONAL PARK | $8K |
| Feb 1, 2022 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0169 | 236220 | BAND REPLACEMENT BAY DOORS ON HB 06 | $13K |
| Jan 26, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0117 | 236220 | PEFO - AGATE BRIDGE & PUERCO PUEBLO REPAIRS | $3K |
| Jan 5, 2022 | Department of the InteriorIMR ARIZONA(12400) | 140P1522F0011 | 236220 | SUCR REPLACE VC FIRE & INTRUSION ALARM | $166K |
| Dec 2, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0117 | 236220 | PEFO - AGATE BRIDGE & PUERCO PUEBLO REPAIRS | $23K |
| Nov 19, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0117 | 236220 | PEFO - AGATE BRIDGE & PUERCO PUEBLO REPAIRS | $5K |
| Nov 16, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0084 | 236220 | REPLACE BLOCK SIDEWALK AND ELECTRICAL PANEL SYSTEM, SONORAN DESERT NETWORK (SODN) | $9K |
| Sep 14, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0241 | 236220 | CONSTRUCTION CONTRACT TO GRADE & FILL BATTLEFIELD TRAILS. PALO ALTO BATTLEFIELD. | $113K |
| Sep 13, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0130 | 236220 | REPLACE CLINIC FINISHES AT GRAND CANYON NATIONAL PARK | $329K |
| Sep 1, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0121 | 236220 | GRCA VC THEATER FLOOORING AND SEATING | $185K |
| Aug 31, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0216 | 236220 | BANDALIER NATIONAL MONUMENT - REPLACE HVAC IN HISTORIC BUILDINGS | $89K |
| Aug 27, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0208 | 236220 | BIG BEND NATIONAL PARK - REPLACE EXTERIOR DOORS THREE VISITOR CENTERS | $88K |
| Aug 27, 2021 | Department of the InteriorIMR NORTHERN ROCKIES(12200) | 140P1421F0147 | 236220 | BAND-RECARPET INTERIOR OF VISITOR CENTER | $16K |
| Aug 26, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321P0094 | 236220 | EMERGENCY WHSA-REPLACE ROOF MEMBRANE RES. 4 | $85K |
| Aug 24, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1521F0117 | 236220 | PEFO - AGATE BRIDGE & PUERCO PUEBLO REPAIRS | $139K |
| Aug 24, 2021 | Department of the InteriorIMR ARIZONA(12400) | 140P1520F0156 | 236220 | REFURBISH COMFORT STATION, HUBBELL TRADING POST NATIONAL HISTORIC SITE (HUTR) | $20K |
| Aug 20, 2021 | Department of the InteriorIMR INTERMOUNTAIN REGION(1200) | 140P1221F0048 | 236220 | CAVO VC ROOF | $271K |
| Aug 16, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321C0008 | 221310 | REPLACE WATER SYSTEM VALVES & COMPONENTS - WHSA THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, REPLACEMENT OF VARIOUS VALVES AND VALVE BOXES IN THE WATER SYSTEM, AS WELL AS INSTALLATION OF TWO NEW WATER METERS AND METER BOX | $217K |
| Aug 16, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321C0009 | 238220 | REPLACE BOILERS - OSTB THE PRIMARY WORK OF THIS PROJECT INCLUDES REPLACEMENT AND INSTALLATION OF THE THREE NATURAL GAS BOILER UNITS LOCATED IN THE MECHANICAL ROOM AT THE OLD SANTA FE TRAIL BUILDING. THIS INCLUDES PROPER INSTALLATION OF CONNECTING | $178K |
| Aug 13, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0185 | 236220 | REHAB EXTERIOR OF 3 BLDGS. - FOUN THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE PATCHING OF CRACKS AND REPAIR AND RESTUCCO OF APPROXIMATELY 6,350 SQ. FT. OF EXTERIOR FINISH ON THREE BUILDINGS LOCATED AT FORT UNION NATIONAL | $292K |
| Aug 13, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0184 | 236220 | RENEW COMPONENTS AT VC LIFT STATION - CAVE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, REPLACING THE TWO (2) EXISTING WASTEWATER PUMPS, AND ALL ASSOCIATED PIPING, FITTING, GUIDE RAILS, FLOAT SWITCHES, AND ACCESS COVERS. NEW I | $82K |
| Aug 13, 2021 | Department of the InteriorIMR SANTA FE(12100) | 140P1321F0187 | 236220 | REPLACE PLUMBING AT BAT FLIGHT RESTROOMS - CAVE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF PLUMBING FIXTURES, FINISHES AND ACCESSORIES AT THE BAT FLIGHT COMFORT STATION NEAR THE BAT FLIGHT AMPH | $307K |
Get Alerted Before All-rite Construction, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free