Showing award actions 1–50 of 110 funded award actions, most recent first.
- Contracts with positive obligations
- 100
- Funded award actions shown
- 110
- Obligations shown
- $7.9M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 20, 2026 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU26F0044 | 541380 | THIS TASK WILL CONSIST OF A-E CONSTRUCTION ADMINISTRATION AND SUPPORT SERVICES IN SUPPORT OF THE CONSTRUCTION EFFORT FOR THE PARK LAKE DAM RECONSTRUCTION PROJECT. SERVICES SHALL BE PROVIDED BY THE DISCIPLINES THAT HAVE KNOWLEDGE OF DESIGN, IN ALL POS | $54K |
| Aug 4, 2026 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM26F0088 | 541990 | R4 STREAM HABITAT, HYDROLOGY, DIVERSION SURVEY | $189K |
| Jun 2, 2026 | Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL | 140G0126P0188 | 541350 | 70333906 ASB004 5YR DAM RE-INSPECTION | $10K |
| May 19, 2026 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU26F0053 | 541380 | NPCNF DAM HAZARD ANALYSIS AND DECOMMISSIONING | $217K |
| Apr 23, 2026 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU26F0044 | 541380 | THIS TASK WILL CONSIST OF A-E CONSTRUCTION ADMINISTRATION AND SUPPORT SERVICES IN SUPPORT OF THE CONSTRUCTION EFFORT FOR THE PARK LAKE DAM RECONSTRUCTION PROJECT. SERVICES SHALL BE PROVIDED BY THE DISCIPLINES THAT HAVE KNOWLEDGE OF DESIGN, IN ALL POS | $77K |
| Mar 9, 2026 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 5 | 1240LQ26F0029 | 541380 | BASE YEAR GUARANTEE MINIMUM FOR GEOTECHNICAL SERVICES IN REGION 1 | $1K |
| Sep 26, 2025 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 6 | 1240LR25F0024 | 541990 | 0413 SERV REGION 4 STREAM HABITAT, HYDROLOGY, DIVERSION SURVEY - TASK ORDER THIS TASK ORDER IS SPECIFIC TO THE FOLLOWING TASKS: 1) FIELD WORK ON 66 DIVERSION SITES; 2) UPDATE 5 GAGE WORKBOOKS AND PREPARE SUMMARY WORKBOOK SIMILAR TO TASK ORDER I OUTP | $103K |
| Sep 22, 2025 | Department of AgricultureUSDA-FS, CSA NORTHWEST 6 | 1240BH25D0005 | 541330 | PPS NWZ ARCHITECTURE AND ENGINEERING (AE) IDIQ | $1K |
| Aug 12, 2025 | Department of the InteriorFWS, GAOA | 140FGA25F0039 | 541330 | LOWER RED ROCKS LAKE DAM GEOTECHNICAL INVESTIGATION, MONTANA | $46K |
| Aug 13, 2024 | Department of the InteriorIMR NORTHERN ROCKIES(12200) | 140P1424F0148 | 541330 | YELL WETLAND AND RARE PLANT SURVEY | $63K |
| Aug 6, 2024 | Department of the InteriorFWS, GAOA | 140FGA24F0018 | 541330 | SD-MADISON WMD-GAOA-GEOTECH BOARDWK SURV | $29K |
| Jul 25, 2024 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 3 | 1240LN24F0055 | 541990 | TASK ORDER FOR TBD IDIQ-SERVICE, 0413 SERV REGION 4 STRAM HABITAT, HYDROLOGY, DIVERSION SURVEY, | $65K |
| May 22, 2024 | Department of the InteriorIDAHO STATE OFFICE | 140L2624F0021 | 115310 | IRA - SOUTH HILLS NOXIOUS WEED INVENTORY | $70K |
| Apr 29, 2024 | Department of AgricultureUSDA-FS, STEWARDSHIP CONTRACTING BRANCH | 12363N24F4097 | 115310 | THE STREAMS TO BE SURVEYED INCLUDE STONE CREEK TRIBUTARY 1, MIDDLE OAK GROVE FORK, TYGH CREEK, JORDAN CREEK, AND SEVERAL OTHERS AS POTENTIAL ALTERNATIVES DEPENDING ON FUNDING. (SEE MAP AND TABLE AT END OF DOCUMENT). DUE TO THE UNPREDICTABLE NATURE OF | $113K |
| Apr 25, 2024 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU24F0032 | 541330 | NZCLR UPPER BEAR LAKE DECOMMISSIONING/RESTORATION DESIGN WORK INVOLVES DEVELOPING A FINAL SET OF PLANS, SPECIFICATIONS, AND COST ESTIMATE FOR THE PERMANENT DECOMMISSIONING OF UPPER BEAR LAKE DAM. | $100K |
| Apr 17, 2024 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU24F0025 | 541330 | IPNF COPPER CREEK DAM DECOMMISSIONING AND REHABILITATION DESIGN | $119K |
| Feb 29, 2024 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU24F0014 | 541330 | MYRTLE CR., SMITH CR., CLARKIA, AND AVERY DAMS ARE LOCATED ON THE IDAHO PANHANDLE NATIONAL FOREST. THE CONTRACTOR SHALL CONDUCT A DETAILED O&M INSPECTION AND HAZARD ANALYSIS OF THESE FOUR DAMS/DAM COMPLEXES. THIS WORK WILL INCLUDE EVALUATING PAST | $62K |
| Dec 15, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0028 | 541990 | PROJECT I: STREAM GAGE WORK PROJECT II: DIVERSION CONDITION ASSESSMENTS PROJECT III: STANLEY CREEK AQUATIC ORGANISM PASSAGE DESIGN | $8K |
| Sep 12, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0032 | 541330 | TASK ORDER FOR PHASE II - ALLISON AND ERICSON DAM COMPLEXES DECOMMISSIONING/RESTORATION DESIGN WORK. | $91K |
| Aug 25, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0104 | 541330 | CONJECTURE DAM DECOMMISSIONING DESIGN PACKAGE | $127K |
| Jul 27, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0096 | 541330 | IIJA - THIS TASK ORDER HAS A BASE BID FOR THE TUNNEL INSPECTION AND REPORT; LIDAR SCANNING, PROCESSING, AND ANALYSIS OF THE TUNNEL; AND INSTALLATION OF PERMANENT STATIONING PLACARDS IN THE TUNNELS. IT ALSO INCLUDES AN UNFUNDED OPTION ITEM FOR THE IN | $143K |
| Jun 29, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0084 | 541330 | PROVIDE GEOTECH, DAMS, TUNNELS AND PAVEMENT DESIGN, INVESTIGATION, MATERIALS, AND TESTING SUPPORT TO REGIONWIDE | $102K |
| May 23, 2023 | Department of AgricultureUSDA FOREST SERVICE-SPOC IM | 1282B123F0028 | 541990 | PROJECT I: STREAM GAGE WORK PROJECT II: DIVERSION CONDITION ASSESSMENTS PROJECT III: STANLEY CREEK AQUATIC ORGANISM PASSAGE DESIGN | $120K |
| May 19, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0056 | 541330 | THE USFS REGION 1 DAM SAFETY PROGRAM IS LOOKING FOR GENERAL ENGINEERING SUPPORT. QUALIFICATIONS: THE CONTRACTOR SHALL PROVIDE STAFF WITH EXPERTISE IN EARTHEN DAM ENGINEERING, GEOTECHNICAL, ENVIRONMENTAL, AND HYDRAULIC/HYDROLOGICAL ENGINEERING, AND WE | $162K |
| May 1, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0043 | 541330 | DUE TO THE RECENT RECLASSIFICATION OF THE DAM, THE ANTICIPATED INCREASE IN INSPECTION AND MAINTENANCE COSTS, AND LINGERING CONCERNS ABOUT THE OVERALL INTEGRITY OF THE DAM, THE USFS IS INTERESTED IN CONDUCTING A DETAILED RISK AND BENEFITS EVALUATION O | $73K |
| Apr 21, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0041 | 541330 | IT IS THE INTENT OF THE USFS TO REMOVE THE ENTIRETY OF THE DAM DOWN TO ~ ELEV. 5335 (SEE FIGURE 1 BELOW) AND REMOVE ALL UNACCEPTABLE MATERIAL SUCH AS UNSUITABLE SOILS, LARGE BOULDERS AND ROCKS, AND REMNANTS OF THE ORIGINAL WOODEN HEADWALL AND CULVERT | $169K |
| Mar 27, 2023 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU23F0032 | 541330 | TASK ORDER FOR PHASE II - ALLISON AND ERICSON DAM COMPLEXES DECOMMISSIONING/RESTORATION DESIGN WORK. | $136K |
| Mar 7, 2023 | Department of the InteriorFWS, GAOA | 140FGA23F0014 | 541330 | LAKE ANDES NWR GEOTECH INVESTIGATION | $38K |
| Sep 28, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0091 | 541330 | DRILL A SERIES OF HORIZONTAL DRAINS TO DIVERT GROUNDWATER AND RELIEVE EXCESS PORE WATER PRESSURES ADJACENT TO THE BEAL LEACH PAD FACILITY. | $151K |
| Sep 20, 2022 | Department of the InteriorFWS PACIFIC SOUTHWEST REGIONAL OFFI | 140F0822F0025 | 541330 | MT-BENTON LAKE NWR-STRUCTURAL ANALYSIS | $49K |
| Aug 4, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0089 | 541330 | PER USFS STANDARDS ALL HIGH HAZARD DAMS REQUIRE THE DEVELOPMENT OF AN EMERGENCY ACTION PLAN (EAP) AND INSTALLATION OF AN EARLY WARNING SYSTEM. PER THIS DOW, THE CONTRACTOR SHALL DEVELOP DRAFT EAPS (AS WELL AS INUNDATION MAPS) AND ASSIST THE USFS IN P | $114K |
| Jul 29, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0091 | 541330 | DRILL A SERIES OF HORIZONTAL DRAINS TO DIVERT GROUNDWATER AND RELIEVE EXCESS PORE WATER PRESSURES ADJACENT TO THE BEAL LEACH PAD FACILITY. | $2.2M |
| May 6, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0041 | 541330 | THE KOOTENAI NATIONAL FOREST WANTS TO MAP A SECTION OF THE BEAVER CREEK STREAM CHANNEL AND SURROUNDING RIPARIAN AREA. THE SITE IS APPROXIMATELY, 1,500 METERS LONG AND 500 METERS WIDE, AMOUNTING TO ROUGHLY 150 ACRES. THE COLLECTED DATA WILL BE USED FO | $9K |
| Apr 28, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0036 | 541330 | SATHER DAM REHABILITATION DESIGN ON THE DAKOTA PRAIRIE NATIONAL GRASSLANDS UNDER REGION 1 A&E SERVICES IDIQ GEOTECHNICAL SERVICES. | $126K |
| Apr 12, 2022 | Department of the InteriorFWS PACIFIC SOUTHWEST REGIONAL OFFI | 140F0822D0135 | 541330 | MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) FOR GEOTECHNICAL ENGINEERING SERVICES FOR THE DEPARTMENT OF INTERIOR AND FOREST SERVICE | $500 |
| Apr 11, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU22F0028 | 541330 | ALLISON CREEK AND ERICKSON DAMS ARE TWO COMPLEXES LOCATED ON THE NEZ PERCE CLEARWATER NATIONAL FORESTS. THIS FEASIBILITY STUDY IS INTENDED TO BE PART 1 OF THE INITIAL PHASE OF A MULTI-YEAR DECOMMISSIONING WORK. | $140K |
| Mar 29, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 6 | 1240LR22F0015 | 541990 | 2022 INSTREAM FLOW MEASUREMENT, ANALYSIS AND REPORTING SERVICES-ALLIED ENGINEERING BPA CONTRACT # BPA1284M818A0001 | $76K |
| Mar 22, 2022 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0070 | 541330 | THIS IS THE LAST TASK ORDER FOR WORK NEEDED ON HIAWATHA TUNNEL NETWORK FOR FY21 | $21K |
| Sep 21, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0090 | 541330 | UPPER BRANHAM HA AND O&M INSPECTION WORK, AS PER ATTACHED STATEMENT OF WORK | $19K |
| Aug 5, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 12034319F0265 | 541330 | ALLIED GEOTECHNICAL ENGINEERING SUPPORT | $267K |
| Jul 31, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0070 | 541330 | THIS IS THE LAST TASK ORDER FOR WORK NEEDED ON HIAWATHA TUNNEL NETWORK FOR FY21 | $46K |
| Jul 21, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0063 | 541330 | CONDUCT A ROUTINE O&M INSPECTION AND HAZARD ANALYSIS OF SATHER DAM PER DAM SAFETY REQUIREMENTS | $17K |
| Jul 21, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0064 | 541330 | GEOTECHNICAL EVALUATION OF 2 SITES IN THE MISSOULA AREA. PERFORM SOILS TESTING AT TWO SITES IN THE MISSOULA AREA, 14TH AND CATLIN REGIONAL FACILITY, AND NEAR THE T-150 BUILDING AT FORT MISSOULA. THE TASK WILL REQUIRE DRILLING AND TESTING THE SOILS, | $30K |
| May 27, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0043 | 541330 | SLIP 'N SLIDE DAMS, CUSTER GALLATIN NF, AE SERVICES | $64K |
| May 24, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM21F0054 | 541330 | A/E TO CONDUCT A ROUTINE O&M INSPECTION, A HAZARD ANALYSIS OF THE DAM CLASSIFICATION, A GEOTECHNICAL INVESTIGATION OF THE EMBANKMENT AND A SEEPAGE ANALYSIS TO ASSESS THE CONDITION OF THE DAM. | $72K |
| May 24, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 2 | 1284LM21F0055 | 541330 | RETAIN THE SERVICES OF AN A/E TO CONDUCT AN O&M INSPECTION AND HAZARD ANALYSIS FOR NARROWS CREEK DAM PER DAM SAFETY REQUIREMENTS | $14K |
| May 20, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 6 | 1240LR21F0025 | 541990 | 2021 INSTREAM FLOW MEASUREMENT, ANALYSIS AND REPORTING SERVICES | $11K |
| May 12, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0036 | 541330 | PARK LAKE DAM SAFETY INSPECTION TASK ORDER | $13K |
| Apr 26, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0027 | 541330 | HIAWATHA TRAIL GROUND-BASED LIDAR SCANNING TUNNELS AND SNOWSHEDS, IPNF GEOTECH TO AWARD | $96K |
| Apr 23, 2021 | Department of AgricultureUSDA-FS, CSA INTERMOUNTAIN 9 | 1240LU21F0025 | 541330 | HIAWATHA TRAIL TUNNEL INSPECTION, IPNF | $243K |