MMindy finds federal opportunities that fit you, daily.Try free →
Home/Contractors/Arizona Board Of Regents

Federal Contractor Profile

Arizona Board Of Regents

Federal contracting record: $657M obligated across 616 awards from 18 agencies, FY 20162026.

$657M
Total Obligated
616
Award Records
18
Agencies Served
52
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

NKJGJQYQJKR3

CAGE Code

2F318

Registered Entities (UEIs)

3 under this organization

Address

601 S KNOLES DR ROOM 220, FLAGSTAFF, AZ, 860117034

First Federal Award

Oct 1, 2015

Most Recent Award

Apr 23, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • National Aeronautics and Space Administration

    58.4% of total obligations

    $383M
  • Department of Defense

    25.3% of total obligations

    $166M
  • Department of Health and Human Services

    12.1% of total obligations

    $79M
  • Smithsonian Institution

    1.1% of total obligations

    $7.1M
  • Department of Homeland Security

    0.9% of total obligations

    $5.8M
  • Department of Veterans Affairs

    0.5% of total obligations

    $3.1M
  • Department of the Interior

    0.5% of total obligations

    $3.0M
  • Consumer Product Safety Commission

    0.4% of total obligations

    $2.4M
  • Department of Agriculture

    0.3% of total obligations

    $1.9M
  • General Services Administration

    0.2% of total obligations

    $1.6M

Top NAICS Activity

  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    68 awards

    $230M
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    107 awards

    $132M
  • 611310

    COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS

    106 awards

    $107M
  • 541710

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES

    3 awards

    $77M
  • 336414

    GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING

    1 awards

    $50M
  • 541714

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY (EXCEPT NANOBIOTECHNOLOGY)

    32 awards

    $13M
  • 541711

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY

    12 awards

    $11M
  • 541330

    ENGINEERING SERVICES

    8 awards

    $11M
  • 621999

    ALL OTHER MISCELLANEOUS AMBULATORY HEALTH CARE SERVICES

    1 awards

    $4.1M
  • 541380

    TESTING LABORATORIES

    57 awards

    $2.6M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 23, 2026Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)541715ANIMAL RESEARCH VET AND HUSBANDRY SERVICE ORDERING VEHICLE CONTRACT FOR ALL SAVAHCS RESEARCH$9K
Apr 17, 2026General Services AdministrationGSA GAS AAS REGION 6611310STRATEGIC THINKERS PROGRAM$10K
Apr 3, 2026Department of Health and Human ServicesALBUQUERQUE AREA INDIAN HEALTH SVC611430BPA CALL NO. 75H70726F05005 TO ADD ADDITIONAL FUNDS IN THE AMOUNT OF $105,000.00.$107K
Apr 1, 2026Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL541380BPA-C #18 - LAB ANALYSES FOR DETRITAL ZIRCON U/PB, HF, AND T/REE$14K
Mar 31, 2026Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$32K
Mar 31, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$300K
Feb 23, 2026Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$27K
Feb 4, 2026Department of AgricultureMRPBS MINNEAPOLIS MN541940NATIONAL ANIMAL HEALTH LABORATORY NETWORK DIAGNOSTIC TESTING SERVICES FOR AMR AST TESTING$4K
Feb 4, 2026Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)541715ANIMAL RESEARCH VET AND HUSBANDRY SERVICE ORDERING VEHICLE CONTRACT FOR ALL SAVAHCS RESEARCH$4K
Jan 27, 2026Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL541380LAB ANALYSES FOR DETRITAL ZIRCON U/PB, HF, AND T/REE$20K
Jan 23, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.$134K
Jan 22, 2026Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$6K
Jan 16, 2026Department of DefenseMISSILE DEFENSE AGENCY (MDA)541715SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER.$500
Jan 12, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310START UP/ENROLLMENT PERIOD$414K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310OPTION YEAR$10K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310MILITARY STUDIES CURRICULUM - BASE YEAR$137K
Jan 11, 2026Department of DefenseNAVSUP FLT LOG CTR NORFOLK611310BASE LOT LOGISTICS-MARITIME$112K
Dec 22, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY541714OBJECTIVE PREDICTION OF TEAM EFFECTIVENESS VIA MODELS OF PERFORMANCE OUTCOMES (OP TEMPO) PHASE 1 BASE$899K
Dec 22, 2025Department of AgricultureMRPBS MINNEAPOLIS MN541940NATIONAL ANIMAL HEALTH LABORATORY NETWORK ORDER FOR WGS TESTING.$5K
Dec 18, 2025Department of DefenseNAVY MEDICINE PROFESSIONAL923110AZ, UNIVERSITY OF ARIZONA TUITION AND FEES$138K
Dec 15, 2025Department of Health and Human ServicesPHOENIX AREA INDIAN HEALTH SVC623220BPA CALL FOR NEURODEVELOPMENTAL PSYCHOLOGICAL SERVICES - PAO$20K
Dec 11, 2025Department of DefenseW4LD USA HECSA541715SERDP PROJECT NUMBER RC25-4650 PROPOSAL TITLE: DISTURBANCE IMPACTS ON PERMAFROST SOIL CARBON POOLS AND FLUXES IN THE BLACK SPRUCE FORESTS OF INTERIOR ALASKA$200K
Dec 4, 2025Department of DefenseDEFENSE THREAT REDUCTION AGENCY541715ASSAY DEVELOPMENT AND IMPLEMENTATION TO IDENTIFY VACCINE TARGETS AND EVALUATE COMPLEX VACCINES FOR BACTERIAL INFECTIONS$1.3M
Dec 3, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.$1.5M
Dec 1, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$650K

Subawards Received

Arizona Board Of Regents also receives subaward dollars from other prime contractors. Aggregated from USAspending sub-award reporting (FY2016-FY2026).

$291K
Total Received
2
Sub Awards
1
Distinct Primes

Top 1 Primes Paying Arizona Board Of Regents

Related Contractors

Other companies active in NAICS 541712RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY).

Track Arizona Board Of Regents Recompetes Before They Post

Mindy monitors Arizona Board Of Regents's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts