Skip to content

Federal Contractor Profile

Arizona Board Of Regents

$697M obligated·672 awards·18 agencies·54 NAICS

Federal Contracts

Showing award actions 101–150 of 1,205 funded award actions, most recent first.

Contracts with positive obligations
672
Funded award actions shown
1,205
Obligations shown
$697M
Awarding agencies
18

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of November 3, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Sep 29, 2025Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA75N95025P00462621511ARIZONA STATE UNIVERSITY:1109825 [25-011480] THE CONTRACTOR SHALL CONSTRUCT AND PERFORM ANTIBODY ARRAY TESTING USING A HIGH-THROUGHPUT IMMUNOPROTEOMICS APPROACH FOR ~1,700 PROTEINS TARGETING SELECTED AUTOANTIGENS IN 270 BLOOD SAMPLES.$64K
Sep 27, 2025Department of Homeland SecurityBORDER ENFORCEMENT CONTRACTING DIVISION70B03C25F00001205541990COMPEX SERVICES - USE FOR INNOVATION AND STRATEGY COMPEX PROGRAM.$65K
Sep 26, 2025Department of AgricultureUSDA-FS, CSA NORTHWEST 51240BG25P0037561730RMRS FLAGSTAFF NAU SHARED SERVICES$12K
Sep 26, 2025Department of DefenseW2R2 COLD RGNS RSCH ENG LABW913E525C0020541715CSO-CRREL-25-IPR AICA-0013-ARIZONA ENTITLED "NONLINEAR ACOUSTIC SIGNALS TO EVALUATE ARCTIC SUBGRADES" U437P00$121K
Sep 25, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLKN0018922FZ480611310START UP/ENROLLMENT PERIOD$2.5M
Sep 25, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLKN0018923FZ312611310BASE LOT LOGISTICS-MARITIME$195K
Sep 25, 2025Department of DefenseNAVY MEDICINE PROFESSIONALN0622A25FA585611310AZ, NORTHERN ARIZONA TUITION AND FEES FOR FALL TERM JUN - DEC 2025$10K
Sep 23, 2025Department of DefenseFA3300 42 CONS CCFA330024C0031611310THIS IS AN INTERGOVERNMENTAL SUPPORT AGREEMENT (IGSA) BETWEEN AIR UNIVERSITY (AU) AND ARIZONA STATE UNIVERSITY (ASU).$285K
Sep 18, 2025Department of the InteriorINDIAN EDUCATION ACQUISITION OFFICE140A2325P0422541715TCRGP RESEARCH PROJECT, UNIVERSITY OF ARIZONA FOR SIPI.$38K
Sep 17, 2025Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL140G0125F0187541380LAB ANALYSES FOR DETRITAL ZIRCON U/PB, HF, AND T/REE. THIS ORDER IS PLACED AGAINST BPA 140G0121A0003 (BPA-C #15). PRICES AND SERVICES ARE IN ACCORDANCE WITH THE ESTABLISHED PRICE LIST AND BPA TERMS AND CONDITIONS. CEILING THRESHOLD OF THE BPA IS $495$11K
Sep 16, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG07EK00C336414THE ROBOTIC LUNAR EXPLORATIONLUNAR PRECURSOR ROBOTIC PROGRAM (RLEPLPRP) CONSISTS OF A SERIES OF ROBOTIC LUNAR EXPLORATION MISSIONS TO PREPARE FOR AND TO SUPPORT FUTURE HUMAN EXPLORATION ACTIVITIES. THE PRIMARY PURPOSE OF THE ROBOTIC PREPARATION IS TO REDUCE RISK, ENHANCE MISSION SUCCESS, AND REDUCE THE COST OF FUTURE HUMAN MISSIONS. THE LRO PAYLOAD USED TO ACCOMPLISH THE MISSION OBJECTIVES CONSISTS OF THE FOLLOWING SIX INSTRUMENTS: 1. LUNAR ORBITER LASER ALTIMETER (LOLA) MEASUREMENT INVESTIGATION SHALL DETERMINE THE GLOBAL TOPOGRAPHY OF THE LUNAR SURFACE AT HIGH RESOLUTION, MEASURE LANDING SITE SLOPES AND SEARCH FOR POLAR ICES IN SHADOWED REGIONS; 2. LUNAR RECONNAISSANCE ORBITER CAMERA (LROC) SHALL ACQUIRE TARGETED IMAGES OF THE LUNAR SURFACE CAPABLE OF RESOLVING SMALL-SCALE FEATURES THAT COULD BE LANDING SITE HAZARDS, AS WELL AS WIDE-ANGLE IMAGES AT MULTIPLE WAVELENGTHS OF THE LUNAR POLES TO DOCUMENT CHANGING ILLUMINATION CONDITIONS AND POTENTIAL RESOURCES; 3. LUNAR EXPLORATION NEUTRON DETECTOR (LEND) SHALL MAP THE FLUX OF NEUTRONS FROM THE LUNAR SURFACE TO SEARCH FOR EVIDENCE OF WATER ICE AND PROVIDE MEASUREMENTS OF THE SPACE RADIATION ENVIRONMENT WHICH CAN BE USEFUL FOR FUTURE HUMAN EXPLORATION; 4. DIVINER LUNAR RADIOMETER EXPERIMENT (DLRE) SHALL MAP THE TEMPERATURE OF THE ENTIRE LUNAR SURFACE AT 300 METER HORIZONTAL SCALES TO IDENTIFY COLD-TRAPS AND POTENTIAL ICE DEPOSITS; 5. LYMAN-ALPHA MAPPING PROJECT (LAMP) SHALL OBSERVE THE ENTIRE LUNAR SURFACE IN THE FAR ULTRAVIOLET TO SEARCH FOR SURFACE ICES AND FROSTS IN THE POLAR REGIONS AND TO PROVIDE IMAGES OF PERMANENTLY SHADOWED REGIONS ILLUMINATED ONLY BY STARLIGHT; 6. COSMIC RAY TELESCOPE FOR THE EFFECTS OF RADIATION (CRATER) SHALL INVESTIGATE THE EFFECT OF GALACTIC COSMIC RAYS ON TISSUE-EQUIVALENT PLASTICS AS A CONSTRAINT ON MODELS OF BIOLOGICAL RESPONSE TO BACKGROUND SPACE RADIATION. EACH INSTRUMENT WILL BE MANAGED BY A PRINCIPAL INVESTIGATOR (PI), WHO WILL BE RESPONSIBLE FOR DELIVERING THE FLIGHT INSTRUMENT TO THE LRO PROJECT, AS WELL AS PRODUCING THE INSTRUMENT'S DATA PRODUCTS AND DELIVERING THEM TO THE PLANETARY DATA SYSTEM (PDS) IN ACCORDANCE WITH THEIR DATA PRODUCT SPECIFICATION DOCUMENT.$358K
Sep 16, 2025Department of DefenseARMY MED RES ACQ ACTIVITYHT942525CE010541715NOVEL MOBILE DECISION SUPPORT PLATFORM TO ENABLE PROVIDER TRANSLATION OF EN ROUTE CARE PRACTICE GUIDELINES FOR LARGE VOLUME TRANSPORTS$200K
Sep 12, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLKN0018925P0562541990UKIRT DATA ANALYTIC SUPPORT SERVICES$200K
Sep 11, 2025Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26225P1624541715AFFILIATE STUDY COORDINATOR$33K
Sep 5, 2025Department of DefenseW6QK ACC-APGW911SR24C0035541715TOPIC AREA SECTION 7.5.A, SUBMISSION NUMBER B5-23 BROAD AGENCY ANNOUNCEMENT (BAA) TO DEVELOP A SELECTIVE, PORTABLE, AND SENSITIVE WGM CHEMICAL THREAT SENSOR THAT COULD BE ADAPTED FOR USE ON THE BATTLEFIELD, IN CLINICS, AND IN OTHER LABORATORIES.$80K
Sep 4, 2025Department of DefenseW4LD USA HECSAW912HQ24C0073541715ESTCP RC24-8054 NEW START TDAR MILITARY REPOSITORY: HISTORIC PRESERVATION DATA MANAGEMENT SOLUTION FOR THE DEPARTMENT OF DEFENSE$200K
Sep 4, 2025Department of DefenseNAVY MEDICINE PROFESSIONALN0622A25FA550923110AZ, UNIVERSITY OF ARIZONA TUITION AND FEES FOR FALL TERM JUN - DEC 2025$136K
Sep 3, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM10AA11C541712OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.$500K
Sep 3, 2025Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION61320624N0046518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$39K
Sep 3, 2025Department of Health and Human ServicesNAVAJO AREA INDIAN HEALTH SVC75H71025P01070611310THE NAVAJO AREA HAS A REQUIREMENT FOR A CONTRACTOR TO CONDUCT TWO (2) BTIS TRAINING.$14K
Aug 28, 2025Department of DefenseW2R2 COLD RGNS RSCH ENG LABW913E525C0005541715CSO-CRREL-24-IPR-FIRE-0008 TITLED, ARTIFICIAL INTELLIGENCE INFORMED HIGH-RESOLUTION FUEL MAPPING U437N00$98K
Aug 22, 2025Department of DefenseW4LD USA HECSAW912HQ24C0073541715ESTCP RC24-8054 NEW START TDAR MILITARY REPOSITORY: HISTORIC PRESERVATION DATA MANAGEMENT SOLUTION FOR THE DEPARTMENT OF DEFENSE$141K
Aug 21, 2025Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL140G0125F0261541380LAB ANALYSES FOR DETRITAL ZIRCON U/PB, HF, AND T/REE$50K
Aug 14, 2025Department of DefenseW6QK ACC-APG ADELPHIW911QX23C0040541330RESEARCH & DEVELOPMENT SERVICES PROGRAM TO PROVIDE STATE OF THE ART UPGRADES TO NIGHT-TIME PILOTAGE SYSTEM FOR VERTICAL LIFT PLATFORMS.$600K
Aug 13, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM10AA11C541712OSIRIS - REX ASTEROID SAMPLE RETURN MISSION. 1.1 OSIRIS - REX DEPUTY PRINCIPAL INVESTIGATOR, HEATHER ENOS, OSIRIS - REX BUSINESS MANAGER, DR. DRAKE AND DR. LAURETTA WILL HAVE THE OVERALL RESPONSIBILITY FOR THE DEVELOPMENT AND DELIVERY OF THE OSIRIS - REX PHASE A CONCEPT STUDY REPORT. THE CONCEPT STUDY REPORT MUST MEET THE REQUIREMENTS DELINEATED IN PART II OF THE STATEMENT OF WORK. 1.2 THE CONCEPT STUDY REPORT (CSR) WILL INCLUDE, BUT NOT LIMITED TO, PROPOSED LEVEL 1 SCIENCE REQUIREMENTS, CRITERIA FOR FULL MISSION SUCCESS SATISFYING THE BASELINE SCIENCE MISSION AND CRITERIA FOR MINIMUM MISSION SUCCESS SATISFYING THE THRESHOLD SCIENCE MISSION. 1.3 THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH THE GSFC AND LM MANAGEMENT TEAMS TO REFINE THE PROPOSED OSIRIS - REX MISSION COSTS. THE UA MANAGEMENT TEAM WILL WORK CLOSELY WITH GSFC PROJECT MANAGEMENT AND LM TO ASSESS THE ROBUSTNESS AND FEASIBILITY OF THE COST AND SCHEDULES. THE UA MANAGEMENT TEAM WILL HAVE THE LEAD FOR THE COST SECTION OF THE REPORT. 1.4 THE UA MANAGEMENT TEAM WILL PROVIDE SUPPORT IN THE DEVELOPMENT OF REQUIRED INTERNATIONAL AGREEMENTS SUCH AS TECHNICAL ASSISTANCE AGREEMENTS AND ITAR LICENSES. 1.5 THE UA MANAGEMENT TEAM WILL OVERSEE THE PHASE A CONTRACT WITH INSTRUMENT LEAD, DR. PHIL CHRISTENSEN, ASU. 1.6 THE UA MANAGEMENT TEAM WILL PROVIDE INPUTS AND VALIDATION SUPPORT TO THE GSFC INTEGRATED MASTER SCHEDULER. 1.7 DEPUTY PI, DR. LAURETTA, WILL LEAD THE DEVELOPMENT OF THE E/PO AND STUDENT COLLABORATION PLANS. 1.8 THE UNIVERSITY OF ARIZONA (UA) WILL SUPPORT THE OSIRIS-REX SITE VISIT AT LOCKHEED MARTIN, LITTLETON, CO.$868K
Aug 13, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25PB709611310HIGH TEMPERATURE LOW CYCLE FATIGUE PERFORMANCE OF GRX-810 ALLOY$50K
Aug 11, 2025Department of Health and Human ServicesPHOENIX AREA INDIAN HEALTH SVC75H71224C00033621999INTERFACILITY PATIENT TRANSFER COORDINATION FOR THE PHOENIX AREA OFFICE, INDIAN HEALTH SERVICE PHOENIX, ARIZONA.$2.0M
Aug 5, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLKN0018922FZ001611310MILITARY STUDIES CURRICULUM - BASE YEAR$648K
Aug 5, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA09C541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$1.6M
Aug 5, 2025Department of DefenseW4LD USA HECSAW912HQ25C0070541715ESTCP PROJECT NUMBER:RC25-8708 TITLE: SYNERGISTIC INTEGRATION OF ENZYME-INDUCED CALCIUM CARBONATE PRECIPITATION AND ENGINEERED BIOCRUST RESTORATION FOR STABILIZING EROSION-PRONE ARID LANDS$100K
Jul 31, 2025Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004)140D0421P0113611310RECRUITING SERVICES - ARIZONA STATE UNIVERSITY$35K
Jul 31, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001125C0316541715CRAFTING OPTIMIZED NARRATIVES TO NAVIGATE AND ENHANCE COMMUNICATION AND TRUST (CONNECT) PROGRAM$209K
Jul 30, 2025Department of the InteriorIBC ACQ SVCS DIRECTORATE (00004)140D0421P0119611310RECRUITING SERVICES - UNIVERSITY OF ARIZONA$54K
Jul 24, 2025Department of DefenseWASHINGTON HEADQUARTERS SERVICESHQ003424C0108611310IRREGULAR WARFARE CENTER RESEARCH SUPPORT SERVICES$4.7M
Jul 23, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001124C0495541714OBJECTIVE PREDICTION OF TEAM EFFECTIVENESS VIA MODELS OF PERFORMANCE OUTCOMES (OP TEMPO) PHASE 1 BASE$395K
Jul 23, 2025Department of the InteriorLOWER COLORADO REGIONAL OFFICE140R3023C0015541690THIS REQUIREMENT IS INTENDED TO BE AWARDED ON A SOLE-SOURCE BASIS TO UNIVERSITY OF ARIZONA, TUCSON, AZ, ONLY ONE RESPONSIBLE SOURCE AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY THE REQUIREMENTS REQUESTED IN THE ATTACHED REQUIREMENTS DOCUMENT. T$65K
Jul 22, 2025Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION61320624N0046518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$42K
Jul 21, 2025Department of DefenseNAVSUP FLT LOG CTR NORFOLKN0018923FZ312611310BASE LOT LOGISTICS-MARITIME$122K
Jul 15, 2025Consumer Product Safety CommissionCONSUMER PRODUCT SAFETY COMMISSION61320624N0046518210DATA COLLECTION ON CONSUMER PRODUCTS RELATED TO INJURIES.$5K
Jul 11, 2025Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26224C0237611310GME BASE YEAR ACADEMIC YEAR 2023-2024$97K
Jul 10, 2025Department of DefenseW6QK ACC-APGW911SR24C0035541715TOPIC AREA SECTION 7.5.A, SUBMISSION NUMBER B5-23 BROAD AGENCY ANNOUNCEMENT (BAA) TO DEVELOP A SELECTIVE, PORTABLE, AND SENSITIVE WGM CHEMICAL THREAT SENSOR THAT COULD BE ADAPTED FOR USE ON THE BATTLEFIELD, IN CLINICS, AND IN OTHER LABORATORIES.$160K
Jul 9, 2025Department of DefenseNAVFAC SYSTEMS AND EXP WARFARE CTRN3943025C2004541715DEVELOPING AND TESTING CEMENT FORMULATIONS BY OPTIMIZING THE USE OF LIMESTONE AND SUPPLEMENTARY CEMENTITIOUS MATERIALS AND CONDUCTING A COMPREHENSIVE LIFE CYCLE ASSESSMENT TO EVALUATE THEIR MATERIAL COMPOSITIONS AND MECHANICAL/CHEMICAL PROPERTIES.$215K
Jul 3, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001124C0495541714OBJECTIVE PREDICTION OF TEAM EFFECTIVENESS VIA MODELS OF PERFORMANCE OUTCOMES (OP TEMPO) PHASE 1 BASE$91K
Jul 1, 2025Department of the InteriorOFFICE OF ACQUISITON GRANTS140G0325P0085541380DENDROCHRONOLOGICAL DATING OF CASCADIA SUBDUCTION ZONE EARTHQUAKES$14K
Jul 1, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERGSFC0200208DNAS502105541710NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.$25M
Jun 30, 2025Department of the InteriorOFFICE OF ACQUISITON GRANTS140G0325P0159541380RADIOCARBON ANALYSES FOR ASC$37K
Jun 30, 2025Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26225N0862541715ANIMAL RESEARCH VET AND HUSBANDRY SERVICE ORDERING VEHICLE CONTRACT FOR ALL SAVAHCS RESEARCH$29K
Jun 30, 2025Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26225N0864541715ANIMAL RESEARCH VET AND HUSBANDRY SERVICE ORDERING VEHICLE CONTRACT FOR ALL SAVAHCS RESEARCH$21K
Jun 30, 2025Department of Veterans Affairs262-NETWORK CONTRACT OFFICE 22 (36C262)36C26225N0863541715ANIMAL RESEARCH VET AND HUSBANDRY SERVICE ORDERING VEHICLE CONTRACT FOR ALL SAVAHCS RESEARCH$14K
Jun 26, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA09C541712IGF::CL,CT::IGF PSYCHE: JOURNEY TO A METAL WORLD THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL THIS CONTRACT PROVIDES FOR WORK TO BE PERFORMED BY THE PRINCIPAL INVESTIGATOR IN SUPPORT OF THE PHASE A CONCEPT DEFINITION PORTION OF THE NASA DISCOVERY PROGRAM 2014 ANNOUNCEMENT OF OPPORTUNITY (AO) (NNH14ZDA014O) SOLICITATION DATED NOVEMBER 5, 2014. THE MISSION PRINCIPAL INVESTIGATOR (PI), DR. LINDA ELKINS-TANTON, OF THE SCHOOL OF EARTH AND SPACE EXPLORATION AT ARIZONA STATE UNIVERSITY (ASU), IS RESPONSIBLE FOR THE SUCCESS AND SCIENTIFIC INTEGRITY OF THE MISSION. AS SUCH, THE PI SHALL LEAD THE PROJECT, MANAGE PROJECT RESOURCES, AND DIRECT ALL ACTIVITIES OF THE SCIENCE TEAM CARRIED OUT IN SUPPORT OF THE MISSION. SPECIFICALLY, DURING PHASE A, THE PI WILL LEAD THE MISSION TEAM IN CONDUCTING THE CONCEPT STUDY REPORT AND ASSOCIATED SITE VISIT. SHOULD THE MISSION BE SELECTED TO CONTINUE INTO PHASE B, THE PI WILL LEAD THE TEAM THROUGH THE INITIATION OF THE PHASE B EFFORT WITH A TRANSITION PHASE BETWEEN NOTIFICATION OF AWARD AND ESTABLISHMENT OF THE PHASE B CONTRACT. THE PI IS ASSISTED BY A DEPUTY PI, DR. JAMES BELL AT ARIZONA STATE UNIVERSITY. JET PROPULSION LABORATORY (JPL) IS THE MISSION MAJOR PARTNER FOR SPACECRAFT DEVELOPMENT AND MISSION IMPLEMENTATION, AND SHALL SUPPORT THE PI WITH A PROJECT TEAM EXPERIENCED IN MANAGEMENT, SYSTEMS ENGINEERING, MISSION DESIGN, PAYLOAD DEVELOPMENT, SAFETY AND MISSION ASSURANCE, NAVIGATION, AND MISSION OPERATIONS. SPECIFIC OBJECTIVES TO ADDRESS THE PHASE A CRITERIA AND GUIDELINES ARE: - PROJECT MANAGEMENT FOR THE PHASE A CONTRACT - CONDUCT AND SUPPORT OF PHASE A PROJECT REVIEWS - PHASE B/C/D/E SPACECRAFT DEVELOPMENT AND MISSION PLANNING - PHASE B/C/D/E COST ESTIMATES - CONCEPT STUDY REPORT PREPARATION - ORALS/SITE VISIT SUPPORT BY KEY PERSONNEL$1.7M

Get Alerted Before Arizona Board Of Regents's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free