Federal Contractor Profile
Arrow Indian Contractors, INC.
Federal contracting record: $63M obligated across 140 awards from 8 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
D1LRKHNWT971
CAGE Code
1E3L6
Address
449 S 48TH ST STE 101, TEMPE, AZ, 852812304
First Federal Award
Oct 7, 2015
Most Recent Award
Jul 23, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Defense$21M
33.6% of total obligations
- Department of the Interior$21M
33.4% of total obligations
- Department of Homeland Security$5.6M
8.9% of total obligations
- Department of Transportation$4.9M
7.7% of total obligations
- Environmental Protection Agency$4.1M
6.4% of total obligations
- General Services Administration$3.6M
5.8% of total obligations
- Department of Agriculture$2.1M
3.3% of total obligations
- Department of Energy$645K
1.0% of total obligations
Top NAICS Activity
- $27M
- $19M
- $8.4M
- $4.1M
- $2.8M
- $589K
- $386K
- $266K
- $198K
- $165K
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Jul 23, 2026 | Department of the InteriorDOI, NPS CONOPS STRATEGIC | 238110 | SEAZ CONCRETE FOUNDATION AND SLAB | $92K |
| Sep 19, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | RUNWAY RUBBER ACCUMULATION BE REMOVED WITHIN LANDING ZONES AS SKID RISK REDUCTION MITIGATION. ASPHALT CEMENT CONCRETE PAVEMENT TO BE SURFACE TREATED WITH GILSONITE MODIFIED ASPHALT EMULSION SEAL COAT. AIRFIELD PAINT MARKING RESTORED. | $1.4M |
| Sep 17, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | 309TH AMARG MAINTENANCE DOCK AND ADMINISTRATION BUILDING PARKING LOTS REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. COMPLETE REPLACEMENT OF ACC PAVEMENT SURFACE. REPAIR OF UNDERGROUND ELECTRICAL WIRING. | $385K |
| Sep 10, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | CRAYCROFT ROAD CRACKS NEED TO BE SEALED ADEQUATELY TO PREVENT ACCELERATED DETERIORATION. SEAL THE LONGITUDINAL AND TRANSVERS CRACKING AND ARREST THE LIGHT TO MEDIUM WEATHERING OF THE ACC SURFACE TO EXTEND ITS SERVICE LIFE. | $861K |
| Sep 10, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | PRIMARY AND SECONDARY SERVICE ROADS AT DMAFB REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. CONDUCT SUSTAINMENT MAINTENANCE AND REPAIR WORK IN THE GENERAL NATURE OF SURFACE CLEANING, CRACK SEAL, SURFACE TREATMENTS, AND PAINTING AND STRIPING. | $555K |
| Sep 10, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | PRIMARY AND SECONDARY SERVICE ROADS AT DMAFB REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR. CONDUCT SUSTAINMENT MAINTENANCE AND REPAIR WORK OF SURFACE CLEANING, CRACK SEAL, SURFACE TREATMENTS, AND PAINTING AND STRIPING. | $1.0M |
| Sep 10, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | PARKING LOTS AND ROADS ALONG 5TH STREET HAVE DETERIORATED TO WHERE SUSTAINMENT, MAINTENANCE AND REPAIR ARE REQUIRED. NATURE OF SUSTAINMENT MAINTENANCE AND REPAIR ARE SURFACE TREATMENTS, CRACK FILLING, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. | $866K |
| Aug 7, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | 55TH RGS UTILIZES PARKING LOTS PA1540 04, PA1740 01, THESE LOTS DETERIORATED AND REQUIRE SUSTAINMENT MAINTENANCE REPAIR. GENERAL NATURE OF THE SUSTAINMENT ARE SURFACE TREATMENTS, CRACK FILLING, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. | $86K |
| Aug 7, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | THE PRINCIPAL ROADS FOR 309TH AMARG COMPLEX HAVE DETERIORATED, AND SUSTAINMENT MAINTENANCE AND REPAIR ARE REQUIRED TO EXTEND SERVICE LIFE. SUSTAINMENT MAINTENANCE IS SURFACE TREATMENTS, CRACK-FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. | $948K |
| Jul 15, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | THE PARKING LOT FOR THE 355TH SFS, B1358, REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR TO EXTEND SERVICE LIFE IAW SOW. GENERAL NATURE OF THE SUSTAINMENT MAINTENANCE ARE SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. | $159K |
| Jul 10, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | THE PARKING LOTS FOR THE 355TH MXG, B5500, REQUIRE SUSTAINMENT MAINTENANCE AND REPAIR TO EXTEND SERVICE LIFE IAW SOW. GENERAL NATURE OF THE SUSTAINMENT MAINTENANCE ARE SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. | $174K |
| Jul 8, 2025 | Department of DefenseW075 ENDIST LOS ANGELES | 237110 | REPAIR & REPLACE SEWER & WATER MAINS | $293K |
| May 22, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB AND AMARG IAW SOW. | $952K |
| Mar 12, 2025 | Department of the InteriorDOI, NPS CONOPS STRATEGIC | 238110 | THE PURPOSE OF THIS COMBINED SYNOPSIS / SOLICITATION FOR COMMERCIAL ITEMS PREPARED IN ACCORDANCE WITH THE FORMAT IN THE FEDERAL ACQUISITION REGULATIONS (FAR) SUBPART 12.6, AS SUPPLEMENTED WITH ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE. IS TO SEE | $43K |
| Feb 6, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | REPAIRING FIFTH STREET ON DAVIS-MONTHAN AFB, AN ACC PAVEMENT WITH TRANSVERSE BLOCK CRACKING AND MINOR SETTLING. PROJECT AIMS TO ARREST DAMAGE AND EXTEND SERVICE LIFE TO MAXIMUM EXTENT POSSIBLE. | $24K |
| Jan 14, 2025 | Department of DefenseFA4877 355 CONS PK | 237310 | AMARG TAXIWAY AND APRONS PHASE 3 AIRFIELD/STREET/PARKING LOT MAINTENANCE AND REPAIR INCLUDING DEMOLITION, UTILITY WORK, SUB-GRADE PREPARATION, CONCRETE CURB, BASE COURSE, ASPHALT SURFACE, SIDEWALK, STRIPING, DRAINAGE, ETC. ON DAVIS-MONTHAN AFB, AZ. | $707K |
| Sep 30, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | THIS WORK ELEMENT CONSISTS OF THE PERFORMANCE OF ALL WORK NECESSARY TO PLACE BOLLARDS IN FRONT OF THE ENTRANCE OF THE BX IN ACCORDANCE WITH THE STATEMENT OF WORK. | $7K |
| Sep 28, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | CONTRACTOR SHALL PERFORM ALL OPERATIONS ASSOCIATED WITH THE REMOVAL OF THE EXISTING GRAVEL, SCARIFYING THE TOP CLAY SOIL, AND INSTALLING BASE COURSE AND ASPHALT WEARING SURFACE TO ACCOMMODATE TYPICAL VEHICULAR TRAFFIC FOR A PARKING SURFACE. | $168K |
| Sep 27, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | REPAIRING FIFTH STREET ON DAVIS-MONTHAN AFB, AN ACC PAVEMENT WITH TRANSVERSE BLOCK CRACKING AND MINOR SETTLING. PROJECT AIMS TO ARREST DAMAGE AND EXTEND SERVICE LIFE TO MAXIMUM EXTENT POSSIBLE. | $346K |
| Sep 27, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | THIS REQUIREMENT IS FOR A 60FT BY 60FT CONCRETE PAD FOR THE WASHING AND STORAGE OF BOATS. THE CURRENT LOCATION IS DIRT WHICH RUTS DURING WASHING AND RAIN EVENTS. THE LOCATION OF THE PAD IS TO BE ADJACENT TO BUILDING 4868. | $49K |
| Aug 13, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | THIS WORK ELEMENT CONSISTS OF THE PERFORMANCE OF ALL WORK NECESSARY TO PLACE BOLLARDS IN FRONT OF THE ENTRANCE OF THE BX IN ACCORDANCE WITH THE STATEMENT OF WORK. | $18K |
| Jul 31, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | CHAPEL ROAD REPAIR | $160K |
| Jul 30, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | EIGHT SECTIONS OF PARKING LOTS HAVE WEATHERED AND NOW MAINTENANCE IS REQUIRED. SUSTAINMENT INCLUDES SURFACE TREATMENTS, CRACK FILL, AND RESTORATION OF EXISTING PAVEMENT MARKINGS. ADDITIONAL INFORMATION IS IN THE ATTACHED SOW DATED 20 MAY 2024. | $159K |
| Jul 11, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | SWEEP WORK AREA, REPAIR CRACKS, AND RE-STRIPE FROM LINE OF DEMARCATION AT THE GOLF LINKS RD. AND CRAYCROFT RD. INTERSECTION TO THE INTERSECTION AT ARIZOLA RD. AND CRAYCROFT RD. | $82K |
| May 6, 2024 | Department of DefenseFA4877 355 CONS PK | 237310 | REPAIR CRACKS, APPLY SURFACE SEALANT, AND REPAINT MARKINGS ON PAVEMENT SHOULDERS AT MULTIPLE LOCATIONS ON THE AIRFIELD AT DAVIS-MONTHAN AIR FORCE BASE. | $24K |
Want to win work like Arrow Indian Contractors, INC.?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.