Home/Contractors/Astrobotic Technology INC/contracts

Federal Contractor Profile

Astrobotic Technology INC

$569M obligated·85 awards·2 agencies·5 NAICS

Federal Contracts

Showing award actions 1–50 of 161 funded award actions, most recent first.

Contracts with positive obligations
85
Funded award actions shown
161
Obligations shown
$569M
Awarding agencies
2

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 14, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 14, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7017481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$3.5M
Aug 13, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7018481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$3.5M
Jun 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7017481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$14M
Jun 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7017481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$6.9M
Jun 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7018481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$6.9M
Jun 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7018481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$14M
Jun 30, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC026F7018481212FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.$30K
Jun 26, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC26C0053541715T9.03-1004 RASTR A" ULTRA-FAST SMART LIDAR SENSOR FOR TERRAIN MAPPING$850K
Jun 22, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$530K
May 26, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC26C0010541715SBIR PHASE III VERTICAL SOLAR ARRAY TECHNOLOGY (VSAT) AND LUNARAY TESTING$1.1M
Mar 5, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0220481212VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY$19M
Jan 29, 2026National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC26C0001541713SBIR PHASE II - ASICS - ADAPTABLE, SCALABLE, INTELLIGENT COMPUTING FOR SPACE$840K
Jan 16, 2026National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0220481212VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY$7.8M
Dec 4, 2025Department of DefenseMISSILE DEFENSE AGENCY (MDA)HQ085926FE723541715SCALABLE HOMELAND INNOVATIVE ENTERPRISE LAYERED DEFENSE (SHIELD) INITIAL ORDER.$500
Sep 30, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25C0504541715SBIR PHASE III XOGDOR VEHICLE ENHANCEMENTS$14M
Sep 26, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25C0503541715SBIR PHASE III XODIAC-C VEHICLE ENHANCEMENTS$1.6M
Sep 9, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25C0435541715PHASE II SEQ 80NSSC25C0435 LASERNAV - LIDAR-BASED DARK NAVIGATION FOR SAFE AND PRECISE LUNAR LANDING$4.0M
Sep 9, 2025Department of DefenseFA9300 AFTC PZRFA930024C6019541715MOBILE MODULAR PAYLOAD PROCESSING DEMONSTRATOR$2.2M
Sep 2, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25C0146541715SBIR PHASE I CLAVIUS-S: LUNAR SURFACE SENSOR PAYLOAD FOR ORBITAL OBJECT DETECTION$150K
Aug 14, 2025Department of DefenseFA9300 AFTC PZRFA930025C6014541715SBIR II RESEARCH AND DEVELOPMENT$1.9M
Aug 12, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$500K
Aug 4, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC21C0495541715OT HIGH POWER NEAR-FIELD WIRELESS TRANSFER FOR DUST INTENSIVE APPLICATIONS$375K
Jul 16, 2025National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC025F7055481212CX-1 CLPS TRADE STUDY MID-SIZED LANDER CAPABILITY ASSESSMENT ASTROBOTIC BASE AWARD$588K
Jul 10, 2025Department of DefenseFA2541 SSC COMRCL SVS OFC SSC CMKFA254125CB064541715F2D-14761 ASTROBOTIC TECHNOLOGY INC. THE OBJECTIVE OF THE PHASE II SCOPE IS TO DEMONSTRATE PROPULSION CAPABILITIES (E.G., THRUST, THROTTLING, ISP) NECESSARY TO PERFORM THE DRM AND ADVANCE THE OVERALL SYSTEM TO A POINT WHERE THE INTEGRATED SOLUTION.$3.0M
Jul 2, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25C0032541713PHASE II SBIR - EXTRA LARGE VERTICAL SOLAR ARRAY TECHNOLOGY (VSAT-XL)$850K
Jun 24, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$304K
Jun 17, 2025National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC23CA016541715FLIGHT DEMONSTRATION OF A REUSABLE SUBORBITAL VEHICLE FOR TERRESTRIAL TESTING OF LANDING TECHNOLOGIES$325K
Jun 5, 2025National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25CA014541715SBIR CCRPP - CUBEROVER FOR LUNAR SCIENCE AND EXPLORATION$1.6M
Oct 31, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$80K
Oct 8, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC25CA003541715SBIR PHASE II IGNITE - PHOTON COUNTING SENSOR FOR IN-SPACE DEBRIS DETECTION$850K
Sep 30, 2024Department of DefenseFA9300 AFTC PZRFA930024C6019541715MOBILE MODULAR PAYLOAD PROCESSING DEMONSTRATOR$945K
Aug 27, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC23CA015541715METAL OXIDATION WARMING SYSTEM FUEL CELL DEVELOPMENT AND TESTING$255K
Aug 11, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24PB216541715FY24 SBIR PHASE I- RASTR ULTRA-FAST SMART LIDAR SENSOR FOR TERRAIN MAPPING$150K
Aug 8, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24PB268541715FY24 SBIR PHASE I- ASICS ADAPTABLE, SCALABLE, INTELLIGENT COMPUTING FOR SPACE$150K
Jul 31, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24PB267541715FY24 SBIR PHASE I- EXTRA LARGE VERTICAL SOLAR ARRAY TECHNOLOGY (VSAT-XL)$148K
Jul 23, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC21CA007541715DESIGN, PROTOTYPE, AND TEST LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE.$486K
Jul 18, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24CA071541715FY24 SBIR PHASE II - FLOATINATOR: A LOW GRAVITY SIMULATOR TO STUDY PLUME-SURFACE INTERACTIONS$850K
Jun 17, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24CA068541715FY24 SBIR PHASE II - LOW MASS, HIGH VOLTAGE CABLES FOR LONG DISTANCE LUNAR POWER DISTRIBUTION$850K
May 14, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC23CA016541715FLIGHT DEMONSTRATION OF A REUSABLE SUBORBITAL VEHICLE FOR TERRESTRIAL TESTING OF LANDING TECHNOLOGIES$1000K
Apr 16, 2024Department of DefenseFA9300 AFTC PZRFA930024P6009541715DESIGN AND TEST ROCKET ENGINES$190K
Apr 5, 2024Department of DefenseFA9300 AFTC PZRFA930024P6008541715HOVER VEHICLE-REUSABLE ROCKET$190K
Mar 15, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC24FA024481212MINIMUM GUARANTEED$25K
Feb 14, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24PA310541715PHOTON COUNTING SENSOR FOR IN-SPACE DEBRIS DETECTION$149K
Jan 25, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$362K
Jan 24, 2024National Aeronautics and Space AdministrationNASA LANGLEY RESEARCH CENTER80LARC21CA007541715DESIGN, PROTOTYPE, AND TEST LUNAR VERTICAL SOLAR ARRAY TECHNOLOGY (LVSAT), A SOLAR PANEL SYSTEM DESIGNED TO PROVIDE 10 KILOWATTS OF ELECTRICAL POWER AND BE ROBOTICALLY DEPLOYABLE AT THE SOUTH POLE OF THE LUNAR SURFACE.$1.0M
Jan 17, 2024National Aeronautics and Space AdministrationNASA JOHNSON SPACE CENTER80JSC020F0220481212VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY$6.3M
Jan 17, 2024National Aeronautics and Space AdministrationNASA SHARED SERVICES CENTER80NSSC24CA020541715STTR PHASE II - EFFICIENT DISTRIBUTED STATE ESTIMATION FOR SWARM ROBOTICS$849K
Jan 5, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC23FA069481212NASA FLIGHT OPPORTUNITIES TECHRISE 2023-2024 EDUCATION STUDENT COMPETITION, 30 PAYLOADS, MID DATED JULY 5, 2023.$150K
Jan 5, 2024National Aeronautics and Space AdministrationNASA ARMSTRONG FLIGHT RESEARCH CNTR80AFRC24FA004481212FLIGHT TESTING AND MATURATION OF THE TOUCHAND- GO (TAG) GUIDANCE SYSTEM (TGS) FOR SMALL-BODY AND INTERPLANETARY SAMPLE COLLECTION$417K
Nov 7, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0008541715THE CONTRACTOR SHALL FABRICATE LONG LEAD HARDWARE FOR PRIMARY MOONRANGER COMPONENTS, CREATE MISSION PLAN, REVISE ARCHITECTURES FOR NAVIGATION AND AUTONOMY, RELEASE BETA VERSION OF MISSION NAVIGATION AND AUTONOMY SOFTWARE MODULES.$340K

Get Alerted Before Astrobotic Technology INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free