Federal Contractor Profile
Bluegrass Contracting Corp
Federal contracting record: $47M obligated across 43 awards from 4 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
JE3LMH856VN6
CAGE Code
0UBS3
Address
1075 RED MILE RD, LEXINGTON, KY, 405042642
First Federal Award
Oct 28, 2015
Most Recent Award
Apr 7, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $37M
Department of Transportation
80.0% of total obligations
- $8.9M
Department of Defense
19.0% of total obligations
- $453K
Department of Agriculture
1.0% of total obligations
- $11K
Department of the Interior
0.0% of total obligations
Top NAICS Activity
- $40M
237310
HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
42 awards
- $6.8M
237990
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION
1 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Apr 7, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT WV NP NERI 117(1): THE PROJECT CONSISTS OF SLIDE REPAIRS AT THE GLADE CREEK ROAD. THE WORK INCLUDES CONSTRUCTING MECHANICALLY-STABILIZED EARTH (MSE) WALLS, ROADWAY EXCAVATION, UNDERDRAIN BACKFILL, AGGREGATE SURFACE COURSE, AND OTHER MISCELLA | $2.1M |
| Mar 6, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NP SER BMS FY25(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE MAINTENANCE REPAIRS ON 11 BRIDGES IN THE GREAT SMOKY MOUNTAINS (NEWFOUND GAP ROAD AND ROARING FORK MOTOR NATURE TRAIL). THIS WORK INCLUDES REPAIRING/REPLACING TIMBER BRIDGE ELEMENT | $726K |
| Dec 18, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT MD NP CHOH 235(2), 242(1), ETC.: THE PROJECT CONSISTS OF THE REPAIR OF CARDEROCK, FOUR LOCKS, AND MCCOYS FERRY TUNNELS IN THE CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THE WORK INCLUDES CONCRETE REMOVAL, RIPRAP, STRUCTURAL CONCRE | $2.8M |
| Sep 18, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL | $500K |
| Sep 10, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W | $300K |
| Aug 18, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF PARK ROADS AND PARKING AREAS IN THE ASSATEAGUE ISLAND NATIONAL SEASHORE. THE WORK INCLUDES THIN LIFT ASPHALT CONCRETE OVERLAY, PAVEMENT OVERLAY, PAVEMENT MILLING, PAVEM | $4.2M |
| Jul 16, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA NP BLRI BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING OF STONE MASONRY, REPAIRING EXPANSION JOINTS, CLEANING AND RESEALING JOINTS AND E | $2.1M |
| Jul 11, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W | $57K |
| Jul 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL | $15K |
| Feb 25, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA NP ASIS BRG(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE ASSATEAGUE CHANNEL BRIDGE. THE WORK INCLUDES RIPRAP PLACEMENT, REPAIRING SPALLED AND DELAMINATED CONCRETE, REPLACING BRIDGE DECK JOINTS, CLEANING AND SEALING CONCRETE, REPAI | $865K |
| Dec 31, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W | $1.1M |
| Aug 23, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL | $4.1M |
| Nov 16, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | VA NP FRSP BRG(1) THE PROJECT CONSISTS OF BRIDGE ARCH REPAIRS WHICH INCLUDES THE INJECTION OF CONCRETE CRACKS, REPOINTING OF THE BRIDGE PARAPET, AND ALSO EFFLORESCENCE CLEARING, INSTALLATION OF BRIDGE MEMBRANE SYSTEMS ALONG THE SHOULDERS, AND OTHER | $857K |
| Sep 5, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO | $885K |
| Aug 22, 2023 | Department of AgricultureUSDA-FS, CSA EAST 11 | 237310 | REPAIR SLIDE NFSR 977 BIG PERRY, FHWA EMERGENCY REPAIR OF FEDERALLY OWNED ROADS | $453K |
| Feb 21, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO | $1.1M |
| Jun 29, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT KY ERFO COE 2019-1(1): THE PROJECT CONSISTS OF THE REPAIRS AT DAY USE PARKING, BOAT LAUNCH RAMP, AND CAMPGROUND LOOP ROAD WITHIN LAKE CUMBERLAND KENDALL RECREATION AREA. THE WORK INCLUDES ROADWAY EXCAVATION, GABION-FACED SOIL NAILS, AGGREGA | $2.8M |
| Jan 11, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P | $150K |
| Dec 7, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT FW-PATU 13(1) THE PROJECT CONSISTS OF PAVEMENT REHABILITATION AND SAFETY IMPROVEMENTS. THE WORK INCLUDES ASPHALT MILLING AND OVERLAY, GUARDRAIL REPLACEMENT, INLET AND CULVERT CLEANING, DELINEATOR REPLACEMENT, PAVEMENT MARKING, SIGN REPLACEM | $2.0M |
| Sep 7, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV | $80K |
| Aug 13, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV | $29K |
| Jun 9, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P | $2.4M |
| Apr 6, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV | $2.0M |
| Nov 9, 2020 | Department of DefenseW072 ENDIST NASHVILLE | 237990 | GROIN REPAIR -ARTICULATED CONCRETE BLOCK | $33K |
| Sep 25, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE PROPOSED REQUEST FOR PROPOSAL IS FOR THE NPS CUYAHOGA VALLEY NATIONAL PARK PROJECT NAME NP CUVA 6160-001T WHICH IS LOCATED IN SUMMIT&CUYAHOGA, OHIO. THIS PROJECT CONSISTS OF REHABILITATION OF THE STATION ROAD BRIDGE OVER THE CUYAHOGA RIV | $946K |
Related Contractors
Other companies active in NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.
Want to win work like Bluegrass Contracting Corp?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.