Home/Contractors/Bluegrass Contracting Corp

Federal Contractor Profile

Bluegrass Contracting Corp

Federal contracting record: $47M obligated across 43 awards from 4 agencies, FY 20162026.

$47M
Total Obligated
43
Award Records
4
Agencies Served
2
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

JE3LMH856VN6

CAGE Code

0UBS3

Address

1075 RED MILE RD, LEXINGTON, KY, 405042642

First Federal Award

Oct 28, 2015

Most Recent Award

Apr 7, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Transportation

    80.0% of total obligations

    $37M
  • Department of Defense

    19.0% of total obligations

    $8.9M
  • Department of Agriculture

    1.0% of total obligations

    $453K
  • Department of the Interior

    0.0% of total obligations

    $11K

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    42 awards

    $40M
  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    1 awards

    $6.8M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 7, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT WV NP NERI 117(1): THE PROJECT CONSISTS OF SLIDE REPAIRS AT THE GLADE CREEK ROAD. THE WORK INCLUDES CONSTRUCTING MECHANICALLY-STABILIZED EARTH (MSE) WALLS, ROADWAY EXCAVATION, UNDERDRAIN BACKFILL, AGGREGATE SURFACE COURSE, AND OTHER MISCELLA$2.1M
Mar 6, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NP SER BMS FY25(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE MAINTENANCE REPAIRS ON 11 BRIDGES IN THE GREAT SMOKY MOUNTAINS (NEWFOUND GAP ROAD AND ROARING FORK MOTOR NATURE TRAIL). THIS WORK INCLUDES REPAIRING/REPLACING TIMBER BRIDGE ELEMENT$726K
Dec 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT MD NP CHOH 235(2), 242(1), ETC.: THE PROJECT CONSISTS OF THE REPAIR OF CARDEROCK, FOUR LOCKS, AND MCCOYS FERRY TUNNELS IN THE CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THE WORK INCLUDES CONCRETE REMOVAL, RIPRAP, STRUCTURAL CONCRE$2.8M
Sep 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$500K
Sep 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$300K
Aug 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP NER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF PARK ROADS AND PARKING AREAS IN THE ASSATEAGUE ISLAND NATIONAL SEASHORE. THE WORK INCLUDES THIN LIFT ASPHALT CONCRETE OVERLAY, PAVEMENT OVERLAY, PAVEMENT MILLING, PAVEM$4.2M
Jul 16, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT VA NP BLRI BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING OF STONE MASONRY, REPAIRING EXPANSION JOINTS, CLEANING AND RESEALING JOINTS AND E$2.1M
Jul 11, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$57K
Jul 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$15K
Feb 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT VA NP ASIS BRG(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE ASSATEAGUE CHANNEL BRIDGE. THE WORK INCLUDES RIPRAP PLACEMENT, REPAIRING SPALLED AND DELAMINATED CONCRETE, REPLACING BRIDGE DECK JOINTS, CLEANING AND SEALING CONCRETE, REPAI$865K
Dec 31, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$1.1M
Aug 23, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$4.1M
Nov 16, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION237310VA NP FRSP BRG(1) THE PROJECT CONSISTS OF BRIDGE ARCH REPAIRS WHICH INCLUDES THE INJECTION OF CONCRETE CRACKS, REPOINTING OF THE BRIDGE PARAPET, AND ALSO EFFLORESCENCE CLEARING, INSTALLATION OF BRIDGE MEMBRANE SYSTEMS ALONG THE SHOULDERS, AND OTHER$857K
Sep 5, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO$885K
Aug 22, 2023Department of AgricultureUSDA-FS, CSA EAST 11237310REPAIR SLIDE NFSR 977 BIG PERRY, FHWA EMERGENCY REPAIR OF FEDERALLY OWNED ROADS$453K
Feb 21, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO$1.1M
Jun 29, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT KY ERFO COE 2019-1(1): THE PROJECT CONSISTS OF THE REPAIRS AT DAY USE PARKING, BOAT LAUNCH RAMP, AND CAMPGROUND LOOP ROAD WITHIN LAKE CUMBERLAND KENDALL RECREATION AREA. THE WORK INCLUDES ROADWAY EXCAVATION, GABION-FACED SOIL NAILS, AGGREGA$2.8M
Jan 11, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P$150K
Dec 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT FW-PATU 13(1) THE PROJECT CONSISTS OF PAVEMENT REHABILITATION AND SAFETY IMPROVEMENTS. THE WORK INCLUDES ASPHALT MILLING AND OVERLAY, GUARDRAIL REPLACEMENT, INLET AND CULVERT CLEANING, DELINEATOR REPLACEMENT, PAVEMENT MARKING, SIGN REPLACEM$2.0M
Sep 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$80K
Aug 13, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$29K
Jun 9, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P$2.4M
Apr 6, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$2.0M
Nov 9, 2020Department of DefenseW072 ENDIST NASHVILLE237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$33K
Sep 25, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THE PROPOSED REQUEST FOR PROPOSAL IS FOR THE NPS CUYAHOGA VALLEY NATIONAL PARK PROJECT NAME NP CUVA 6160-001T WHICH IS LOCATED IN SUMMIT&CUYAHOGA, OHIO. THIS PROJECT CONSISTS OF REHABILITATION OF THE STATION ROAD BRIDGE OVER THE CUYAHOGA RIV$946K

Related Contractors

Other companies active in NAICS 237310HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.

Want to win work like Bluegrass Contracting Corp?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.