Showing award actions 1–50 of 67 funded award actions, most recent first.

Contracts with positive obligations
44
Funded award actions shown
67
Obligations shown
$48M
Awarding agencies
4

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 28, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 28, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00082N237310PROJECT VA NP BLRI BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING OF STONE MASONRY, REPAIRING EXPANSION JOINTS, CLEANING AND RESEALING JOINTS AND E$30K
Aug 25, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00087N237310PROJECT VA ERFO COE 2020-1(1): THE PROJECT CONSISTS OF ASPHALT PAVEMENT REMOVAL, GRADING, AGGREGATE BASE, ASPHALT CONCRETE PAVING, RIPRAP, CONCRETE BOX AND PIPE CULVERTS, AND OTHER MISCELLANEOUS WORK.$1.6M
May 29, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00032N237310PROJECT VA NP ASIS BRG(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE ASSATEAGUE CHANNEL BRIDGE. THE WORK INCLUDES RIPRAP PLACEMENT, REPAIRING SPALLED AND DELAMINATED CONCRETE, REPLACING BRIDGE DECK JOINTS, CLEANING AND SEALING CONCRETE, REPAI$80K
Apr 7, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00044N237310PROJECT WV NP NERI 117(1): THE PROJECT CONSISTS OF SLIDE REPAIRS AT THE GLADE CREEK ROAD. THE WORK INCLUDES CONSTRUCTING MECHANICALLY-STABILIZED EARTH (MSE) WALLS, ROADWAY EXCAVATION, UNDERDRAIN BACKFILL, AGGREGATE SURFACE COURSE, AND OTHER MISCELLA$2.1M
Mar 6, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00037N237310NP SER BMS FY25(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE MAINTENANCE REPAIRS ON 11 BRIDGES IN THE GREAT SMOKY MOUNTAINS (NEWFOUND GAP ROAD AND ROARING FORK MOTOR NATURE TRAIL). THIS WORK INCLUDES REPAIRING/REPLACING TIMBER BRIDGE ELEMENT$726K
Dec 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00011N237310PROJECT MD NP CHOH 235(2), 242(1), ETC.: THE PROJECT CONSISTS OF THE REPAIR OF CARDEROCK, FOUR LOCKS, AND MCCOYS FERRY TUNNELS IN THE CHESAPEAKE AND OHIO CANAL NATIONAL HISTORICAL PARK. THE WORK INCLUDES CONCRETE REMOVAL, RIPRAP, STRUCTURAL CONCRE$2.8M
Sep 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00078N237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$500K
Sep 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00022N237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$300K
Aug 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00096N237310PROJECT NP NER PMS FY24(1): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF PARK ROADS AND PARKING AREAS IN THE ASSATEAGUE ISLAND NATIONAL SEASHORE. THE WORK INCLUDES THIN LIFT ASPHALT CONCRETE OVERLAY, PAVEMENT OVERLAY, PAVEMENT MILLING, PAVEM$4.2M
Jul 16, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00082N237310PROJECT VA NP BLRI BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING OF STONE MASONRY, REPAIRING EXPANSION JOINTS, CLEANING AND RESEALING JOINTS AND E$2.1M
Jul 11, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00022N237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$57K
Jul 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00078N237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$15K
Feb 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00032N237310PROJECT VA NP ASIS BRG(1) THE PROJECT CONSISTS OF THE REHABILITATION OF THE ASSATEAGUE CHANNEL BRIDGE. THE WORK INCLUDES RIPRAP PLACEMENT, REPAIRING SPALLED AND DELAMINATED CONCRETE, REPLACING BRIDGE DECK JOINTS, CLEANING AND SEALING CONCRETE, REPAI$865K
Dec 31, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00022N237310PROJECT DC NP ROCR 2(2): THE PROJECT CONSISTS OF REPAIR OF THE L STREET BRIDGE OVER ROCK CREEK. THE WORK INCLUDES SCOUR REPAIR ON THE SOUTH ABUTMENT, STRUCTURAL STEEL PAINING, MINOR REPAIR ON THE ADJACENT PEDESTRIAN BRIDGE, AND OTHER MISCELLANEOUS W$1.1M
Aug 23, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00078N237310PROJECT NP NAMA 11(7), 506(2): THE PROJECT CONSISTS OF RESURFACING AND RESTORATION OF 0.8 MILES OF OHIO DRIVE SW AND 0.25 MILES OF WEST BASIN DRIVE. THE WORK INCLUDES MILLING AND OVERLAYING, FULL-DEPTH PATCH REPAIRS, PAVEMENT MARKINGS, RESETTING SEL$4.1M
Nov 16, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00007N237310VA NP FRSP BRG(1) THE PROJECT CONSISTS OF BRIDGE ARCH REPAIRS WHICH INCLUDES THE INJECTION OF CONCRETE CRACKS, REPOINTING OF THE BRIDGE PARAPET, AND ALSO EFFLORESCENCE CLEARING, INSTALLATION OF BRIDGE MEMBRANE SYSTEMS ALONG THE SHOULDERS, AND OTHER$857K
Sep 5, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00024N237310PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO$885K
Aug 22, 2023Department of AgricultureUSDA-FS, CSA EAST 1112445123F0039237310REPAIR SLIDE NFSR 977 BIG PERRY, FHWA EMERGENCY REPAIR OF FEDERALLY OWNED ROADS$453K
Feb 21, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00024N237310PROJECT VA ERFO FS 2018-2(2), 3(1): THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LOCK 25, DARGAN, AND FIFTEEN MILE CREEK BRIDGES, A NEW STEEL TRUSS PEDESTRIAN BRIDGE AT CULVERT 82 TOW PATH SITE, AND THE REPAIR OF THE LOCK 25 BOX CULVERT. THE WO$1.1M
Jun 29, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000015237310PROJECT KY ERFO COE 2019-1(1): THE PROJECT CONSISTS OF THE REPAIRS AT DAY USE PARKING, BOAT LAUNCH RAMP, AND CAMPGROUND LOOP ROAD WITHIN LAKE CUMBERLAND KENDALL RECREATION AREA. THE WORK INCLUDES ROADWAY EXCAVATION, GABION-FACED SOIL NAILS, AGGREGA$2.8M
Jan 11, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000017237310PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P$150K
Dec 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F000008237310PROJECT FW-PATU 13(1) THE PROJECT CONSISTS OF PAVEMENT REHABILITATION AND SAFETY IMPROVEMENTS. THE WORK INCLUDES ASPHALT MILLING AND OVERLAY, GUARDRAIL REPLACEMENT, INLET AND CULVERT CLEANING, DELINEATOR REPLACEMENT, PAVEMENT MARKING, SIGN REPLACEM$2.0M
Sep 7, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000027237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$80K
Aug 13, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000027237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$29K
Jun 9, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000017237310PROJECT NP-SER PMS FY20(4): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT (ASPHALT OVERLAY AND MICRO SURFACING), ASPHALT PATCHING, CRACK CLEANING AND SEALING, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK ON IDENTIFIED PAVED ROADS AND P$2.4M
Apr 6, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000027237310PROJECT NP-WHHO 407(2) THE PROJECT CONSISTS OF THE REHABILITATION OF THE AESTHETIC PAVEMENT ON PENNSYLVANIA AVENUE BETWEEN EAST EXECUTIVE AVENUE AND WEST EXECUTIVE AVENUE NW, MADISON PLACE NW AND JACKSON PLACE NW BETWEEN H STREET AND PENNSYLVANIA AV$2.0M
Nov 9, 2020Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$33K
Sep 25, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320F000076237310THE PROPOSED REQUEST FOR PROPOSAL IS FOR THE NPS CUYAHOGA VALLEY NATIONAL PARK PROJECT NAME NP CUVA 6160-001T WHICH IS LOCATED IN SUMMIT&CUYAHOGA, OHIO. THIS PROJECT CONSISTS OF REHABILITATION OF THE STATION ROAD BRIDGE OVER THE CUYAHOGA RIV$946K
Sep 15, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320F000052237310THE PURPOSE OF THIS TASK ORDER IS FOR THE NP BLRI BMS FY20 (1) PROJECT.$24K
Aug 4, 2020Department of DefenseW072 ENDIST NASHVILLEW912P519C0006237310BASE CLINS AND OPTION 1 AWARDED.$30K
Jun 19, 2020Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7320F000052237310THE PURPOSE OF THIS TASK ORDER IS FOR THE NP BLRI BMS FY20 (1) PROJECT.$926K
Apr 1, 2020Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$5K
Nov 15, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$32K
Sep 16, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$47K
Sep 13, 2019Department of DefenseW072 ENDIST NASHVILLEW912P519C0006237310BASE CLINS AND OPTION 1 AWARDED.$148K
Aug 27, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319F000080237310SCHEDULE A - THE PROJECT CONSISTS OF PREVENTIVE MAINTENANCE REPAIR TO TWENTY STRUCTURES WITHIN THE NORTH CAROLINA PORTION OF THE BLUE RIDGE PARKWAY. THE WORK INCLUDES JOINT REPAIR/REPLACEMENT, CONCRETE REPAIR, STONE MASONRY REPAIR, PAVEMENT CRACK SE$626K
Aug 15, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$101K
Aug 12, 2019Department of DefenseW072 ENDIST NASHVILLEW912P519C0006237310BASE CLINS AND OPTION 1 AWARDED.$893K
Jul 17, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$677K
Jun 18, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$139K
May 17, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$15K
Apr 11, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$70K
Apr 2, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319F000017237310THE PROJECT CONSISTS OF TWENTY-EIGHT BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES CLEAN AND RESEAL JOINTS, REPAIR DETERIORATED EXPANSION JOINTS, CONCRETE CRACK REPAIR, EROSION REPAIR, CONCRETE CURB INSTALLATION AND OTHER MISCELLANEOUS WORK.$1.3M
Mar 26, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319F000016237310THE PROJECT CONSISTS OF BRIDGE PREVENTIVE MAINTENANCE OF SEVEN BRIDGES IN THE VICKSBURG NATIONAL MILITARY PARK. THE WORK INCLUDES CLEAN AND RESEAL JOINTS, REPAIR DETERIORATED EXPANSION JOINTS, DRAINAGE STRUCTURE REPAIR, STEEL-BACKED TIMBER GUARDRAIL INSTALLATION AND OTHER MISCELLANEOUS WORK.$148K
Feb 8, 2019Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$157K
Feb 7, 2019Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319F000016237310THE PROJECT CONSISTS OF BRIDGE PREVENTIVE MAINTENANCE OF SEVEN BRIDGES IN THE VICKSBURG NATIONAL MILITARY PARK. THE WORK INCLUDES CLEAN AND RESEAL JOINTS, REPAIR DETERIORATED EXPANSION JOINTS, DRAINAGE STRUCTURE REPAIR, STEEL-BACKED TIMBER GUARDRAIL INSTALLATION AND OTHER MISCELLANEOUS WORK.$62K
Aug 30, 2018Department of DefenseW072 ENDIST LOUISVILLEW912QR18P0074237310REPAVING AT HOLMES BEND CAMPGROUND - GREEN RIVER LAKE$19K
Jul 31, 2018Department of Transportation693C73 EASTERN FED LANDS DIVISION5006237310IGF::OT::IGF PROJECT: NP-SER BMS FY17(2) BRIDGE PREVENTATIVE MAINTENANCE - CUMBERLAND GAP NATIONAL HISTORIC PARK, BIG SOUTH FORK NATIONAL RIVER AND RECREATION AREA.$59K
Jun 25, 2018Department of DefenseW072 ENDIST LOUISVILLEW912QR18P0074237310REPAVING AT HOLMES BEND CAMPGROUND - GREEN RIVER LAKE$154K
May 16, 2018Department of DefenseW072 ENDIST NASHVILLEW912P518C0005237990GROIN REPAIR -ARTICULATED CONCRETE BLOCK$5.6M