Home/Contractors/California Institute Of Technology/contracts

Federal Contractor Profile

California Institute Of Technology

$27B obligated·2,151 awards·6 agencies·13 NAICS

Federal Contracts

Showing award actions 150 of 213 funded award actions, most recent first.

Contracts with positive obligations
2,151
Funded award actions shown
213
Obligations shown
$27B
Awarding agencies
6

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 26, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 26, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$37M
Aug 19, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$9.4M
Aug 11, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$2.5M
Jul 17, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$450K
Jun 17, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$3.3M
Jun 17, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$4.8M
May 13, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$17M
Mar 17, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$7.6M
Jan 21, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.8M
Jan 8, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.5M
Dec 17, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$5.0M
Nov 25, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$2.2M
Nov 19, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$12M
Sep 30, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$433K
Sep 16, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$11M
Sep 4, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$3.5M
Sep 3, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$7.8M
Aug 27, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$3.0M
Aug 15, 2025Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$247K
Aug 12, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$2.7M
Aug 1, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC24CA066541715THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) THE CARBON INVESTIGATION (CARBON-I) MISSION PHASE A CONCEPT STUDY.$29K
Aug 1, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$904K
Jul 29, 2025Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$2.6M
Jul 25, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.0M
Jul 22, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.4M
Jul 16, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.6M
Jul 15, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$220K
Jun 27, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.5M
Jun 17, 2025Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$500K
Jun 17, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$3.1M
Jun 5, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$500K
May 28, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$800K
May 7, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$861K
Apr 17, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$800K
Apr 10, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$120K
Apr 4, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.0M
Mar 25, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$370K
Mar 11, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$400K
Mar 11, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$3.5M
Mar 6, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.5M
Feb 26, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$200K
Feb 20, 2025Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$1.1M
Feb 6, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$750K
Jan 29, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$550K
Jan 24, 2025Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$469K
Jan 22, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.8M
Jan 21, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$2.5M
Jan 17, 2025Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$1.8M
Jan 8, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$915K
Jan 7, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.4M

Get Alerted Before California Institute Of Technology's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free