Federal Contracts

Showing award actions 51100 of 213 funded award actions, most recent first.

Contracts with positive obligations
2,151
Funded award actions shown
213
Obligations shown
$27B
Awarding agencies
6

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 26, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Dec 16, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$4.1M
Dec 6, 2024Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$1.1M
Nov 20, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.6M
Oct 31, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$675K
Oct 23, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$2.0M
Oct 16, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.1M
Sep 17, 2024Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$1.7M
Sep 12, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.0M
Sep 12, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$2.0M
Sep 11, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$11M
Sep 6, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC24CA066541715THE EARTH SYSTEM EXPLORERS PROGRAM (ESEP) THE CARBON INVESTIGATION (CARBON-I) MISSION PHASE A CONCEPT STUDY.$1.5M
Aug 30, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$827K
Aug 14, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.5M
Aug 9, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$585K
Jul 15, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.8M
Jun 27, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.3M
Jun 21, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.0M
Jun 20, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.5M
May 13, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.6M
Apr 30, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$3.1M
Apr 18, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$1.5M
Apr 10, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$3.1M
Apr 1, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$7.6M
Mar 29, 2024Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$1.4M
Mar 21, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$850K
Mar 20, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$784K
Mar 7, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$500K
Feb 28, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$200K
Feb 27, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$919K
Feb 12, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$1.8M
Jan 19, 2024National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$415K
Dec 28, 2023Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$173K
Dec 7, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$600K
Dec 7, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.6M
Dec 7, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.2M
Oct 16, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$1.0M
Oct 10, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$1.3M
Sep 28, 2023Department of DefenseNIWC ATLANTICN6523623C8001541715DARPA LINC PROGRAM$246K
Sep 27, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$640K
Sep 18, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$316K
Aug 24, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$600K
Jul 25, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$2.3M
Jul 20, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$893K
Jun 26, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC20C0043541715THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH.$400K
Jun 12, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER80MSFC19C0042541715SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX)$1.5M
May 4, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG08FD60C611310NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN.$1.7M
Apr 20, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC18C0011541715SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE.$1.1M
Apr 20, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC22CA003541715THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER$3.8M
Apr 10, 2023Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCYHR001122C0054541715EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM.$340K
Mar 21, 2023National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER80GSFC23CA028541715THE ULTRAVIOLET EXPLORER (UVEX)$2.8M