Federal Contractor Profile
California Institute Of Technology
$27B obligated·2,151 awards·6 agencies·13 NAICS
Federal Contracts
Showing award actions 101–150 of 213 funded award actions, most recent first.
- Contracts with positive obligations
- 2,151
- Funded award actions shown
- 213
- Obligations shown
- $27B
- Awarding agencies
- 6
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 26, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 17, 2023 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $3.6M |
| Feb 23, 2023 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $1.9M |
| Feb 22, 2023 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $1.5M |
| Jan 27, 2023 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $2.3M |
| Jan 18, 2023 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $762K |
| Jan 17, 2023 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $400K |
| Dec 12, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $3.5M |
| Dec 1, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $3.5M |
| Nov 21, 2022 | Department of DefenseNIWC ATLANTIC | N6523623C8001 | 541715 | DARPA LINC PROGRAM | $2.6M |
| Nov 7, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $492K |
| Oct 20, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $1.0M |
| Oct 13, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $6.0M |
| Oct 11, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $3.7M |
| Sep 30, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $354K |
| Sep 26, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $1.5M |
| Sep 21, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $701K |
| Aug 19, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $649K |
| Aug 9, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $1.2M |
| Aug 4, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $861K |
| Jul 29, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $3.5M |
| Jul 27, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $760K |
| Jul 22, 2022 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001122C0054 | 541715 | EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM. | $130K |
| Jun 7, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $2.3M |
| Jun 3, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $3.4M |
| May 20, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $1.0M |
| May 10, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $1.7M |
| May 5, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $54K |
| Apr 26, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $5.1M |
| Apr 21, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $1.0M |
| Apr 7, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $2.9M |
| Mar 28, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $1.0M |
| Mar 9, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $350K |
| Mar 3, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $1.0M |
| Feb 16, 2022 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001122C0054 | 541715 | EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM. | $325K |
| Feb 11, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $4.0M |
| Feb 2, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $1.5M |
| Jan 21, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $400K |
| Jan 18, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $3.6M |
| Jan 13, 2022 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $600K |
| Jan 5, 2022 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $2.0M |
| Dec 23, 2021 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $1.3M |
| Dec 9, 2021 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $300K |
| Dec 8, 2021 | Department of DefenseDEF ADVANCED RESEARCH PROJECTS AGCY | HR001122C0054 | 541715 | EO14042. NOVEL ORBITAL AND MOON MANUFACTURING, MATERIALS, AND MASS-EFFICIENT DESIGN (NOM4D) PROGRAM. | $60K |
| Oct 19, 2021 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $7.0M |
| Oct 14, 2021 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC19C0042 | 541715 | SMALL, INNOVATIVE, MISSIONS FOR PLANETARY EXPLORATION (SIMPLEX) | $2.0M |
| Oct 13, 2021 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $700K |
| Oct 1, 2021 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC22CA003 | 541715 | THIS CONTRACT IS FOR THE SERVICES REQUIRED TO SUPPORT THE ROMAN SPACE TELESCOPE SCIENCE SUPPORT CENTER | $885K |
| Aug 23, 2021 | National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTER | 80MSFC20C0043 | 541715 | THE GOAL OF THE NEAR-EARTH OBJECT SURVEILLANCE MISSION (NEOSM) IS TO FIND, TRACK, AND CHARACTERIZE THE ASTEROIDS AND COMETS THAT COULD POTENTIALLY THREATEN THE EARTH. | $730K |
| Aug 10, 2021 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC18C0011 | 541715 | SPHEREX MISSION IS AN ALL-SKY NEAR-INFRARED SPECTRAL SURVEY SATELLITE. | $4.1M |
| Aug 4, 2021 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG08FD60C | 611310 | NUSTAR IS A PRICIPAL INVESTIGATOR (PI)-LED SMALL EXPLORER (SMEX) MISSION THAT PERFORMS SURVEYS AND POINTED OBSERVATIONS. THIS ACQUISITION IS IN RESPONSE TO HQ AO NNG07ZDA003O AND EXTENDS THE BRIDGE PHASE B EFFORT FROM MARCH 1, 2008 TO JUNE 30, 2008. DURING THIS PERIOD, THE CONTRACTOR SHALL: 1. MANAGE THE PROPOSED NUSTAR TASKS, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS REQUIRED; 2. WORK WITH JPL TO DEVELOP THE NUSTAR PROJECT REQUIREMENTS TO BE READY FOR SYSTEM REQUIREMENTS REVIEW (SSR). 3. DESIGN THE FOCAL PLANE ASSEMBLY, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD PARTS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 4. DESIGN THE INSTRUMENT ENCLOSURES, SHIELD, AND APERTURE, PERFORM REQUIRED ANALYSES, IDENTIFY ALL LONG LEAD ITEMS, AND INITIATE LONG LEAD PROCUREMENTS AS REQUIRED. 5. COMPLETE THE GLASS PRODUCTION FACILITY, PRODUCE THE NUSTAR GLASSES TO VERIFY THE PRODUCTION CAPABILITY. 6. DEVELOP PROTOTYPES FOR THE OPTICS ASSEMBLY, DESIGN THE OPTICS ASSEMBLY AND THE PRODUCTION FACILITY, AND PERFORM REQUIRED ANALYSIS. 7. COMPLETE THE PRELIMINARY DESIGN OF THE MAST, CANISTER AND INSTRUMENT STRUCTURE, IDENTIFY LONG LEAD PROCUREMENTS. 8. COMPLETE THE SPACECRAFT REQUIREMENTS, PERFORM SYSTEM ENGINEERING ANALYSES, AND CONTINUE THE BASELINE SPACECRAFT DESIGN. 9. COMPLETE THE MOS (MISSION OPERATIONS SYSTEM) REQUIREMENTS AND THE PRELIMINARY MOS PLAN. | $1.4M |
Get Alerted Before California Institute Of Technology's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free