Home/Contractors/Central Southern Construction Corp.

Federal Contractor Profile

Central Southern Construction Corp.

Federal contracting record: $157M obligated across 63 awards from 3 agencies, FY 20162026.

$157M
Total Obligated
63
Award Records
3
Agencies Served
6
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

GKU1XRD7BCX7

CAGE Code

609K6

Parent Organization

Central Southern Construction Corp.

Address

2410 HARPER ST, JACKSONVILLE, FL, 322041716

First Federal Award

Nov 4, 2015

Most Recent Award

Mar 11, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Transportation

    89.3% of total obligations

    $140M
  • Department of Defense

    10.2% of total obligations

    $16M
  • Department of the Interior

    0.5% of total obligations

    $776K

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    54 awards

    $151M
  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    4 awards

    $2.7M
  • 237110

    WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION

    2 awards

    $1.8M
  • 238910

    SITE PREPARATION CONTRACTORS

    1 awards

    $776K
  • 237130

    POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION

    1 awards

    $240K
  • 324121

    ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING

    1 awards

    $121K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Feb 13, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV237310CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.$4.8M
Jan 12, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.$1.7M
Jan 7, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM$150K
Jan 2, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.$974K
Dec 8, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV237310FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING.$10M
Sep 16, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC$1.5M
Sep 3, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC$1000K
Jul 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO$49K
Jul 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$2.8M
Jul 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE$7.8M
Jul 22, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC$445K
Jul 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG$1.8M
Jul 7, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$100K
Jul 7, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$241K
Jul 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.$477K
Jul 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.$2.6M
Jun 30, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC$5.9M
May 27, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK.$7.2M
May 8, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.$227K
May 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND$9.1M
Apr 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU$662K
Feb 26, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE$3.5M
Jan 9, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC$7.4M
Jan 3, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK.$1.5M
Dec 31, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$4.8M

Related Contractors

Other companies active in NAICS 237310HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.

Track Central Southern Construction Corp. Recompetes Before They Post

Mindy monitors Central Southern Construction Corp.'s active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts