Federal Contractor Profile
Central Southern Construction Corp.
$154M obligated·65 awards·3 agencies·6 NAICS
Federal Contracts
Showing award actions 1–50 of 90 funded award actions, most recent first.
- Contracts with positive obligations
- 65
- Funded award actions shown
- 90
- Obligations shown
- $154M
- Awarding agencies
- 3
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of September 16, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 16, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000014 | 237310 | PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | $50K |
| Aug 28, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000012 | 237310 | MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | $149K |
| Aug 13, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000014 | 237310 | PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | $96K |
| Feb 13, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00025N | 237310 | CONSTRUCTION SERVICES FOR PROJECT IN NP INDU PMS(1), PAVEMENT PRESERVATION INDIANA DUNES. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | $4.8M |
| Jan 12, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00085N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | $1.7M |
| Jan 7, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326P000005 | 237310 | PROJECT - VA NP GWMP MVT(4) - STIPEND FEE FOR UNSUCCESSFUL FIRM | $150K |
| Jan 2, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00075N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | $974K |
| Dec 8, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056726F00009N | 237310 | FUNDS CONSTRUCTION PROJECT TX NP MULTI PMS(1) ), PAVEMENT PRESERVATION TEXAS. THIS WORK CONSISTS OF CRACK SEALING, PATCHING, APPLICATION OF CHIP SEAL AND MICRO SURFACE TREATMENTS AND PAVEMENT MARKING. | $10M |
| Sep 16, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000007 | 237310 | PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC | $1.5M |
| Sep 3, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00023N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | $1000K |
| Jul 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000014 | 237310 | PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE | $7.8M |
| Jul 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00021N | 237310 | NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | $49K |
| Jul 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00025N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $2.8M |
| Jul 22, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00023N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | $445K |
| Jul 18, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00093N | 237310 | GA NP CHCH MULTI (2): THE PROJECT CONSISTS OF THE REHABILITATION OF 0.44 MILES OF SNODGRASS ROAD AND 0.76 MILES OF DYER ROAD, INCLUDING PARKING AREAS AND PULL-OFFS. THE WORK INCLUDES ASPHALT PAVEMENT REMOVAL, ROADBED RECONDITIONING, GRADING, AGGREG | $1.8M |
| Jul 7, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00025N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $100K |
| Jul 7, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00025N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $241K |
| Jul 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00080N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(7) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | $477K |
| Jul 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00085N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(6) THE PROJECT CONSISTS OF SLIDE REPAIRS, GUARDRAIL REPLACEMENT, REPLACEMENT AND/OR CLEANING OF CULVERTS, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | $2.6M |
| Jun 30, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00023N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | $5.9M |
| May 27, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00075N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(5) THE PROJECT CONSISTS OF SLIDE REPAIRS, CULVERT REPLACEMENT, STONE MASONRY HEADWALL REPAIR, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS AND OTHER MISCELLANEOUS WORK. | $7.2M |
| May 8, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00008N | 237310 | PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | $227K |
| May 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000012 | 237310 | MS NP GUIS 15(4) THIS PROJECT CONSISTS OF THE CONSTRUCTION OF PAVED SHOULDERS, BOARDWALKS, CULVERT REPLACEMENT, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES THE INSTALLATION OF A BOTTOMLESS BOX CULVERT, GRADING, PAVING SHOULDERS, MICROSURFACING AND | $9.1M |
| Apr 25, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00055N | 237310 | PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU | $662K |
| Feb 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00034N | 237310 | PROJECT IL ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF FIVE DAMAGED PEDESTRIAN TIMBER BRIDGES. THE WORK INCLUDES CONCRETE ABUTMENTS WITH HELICAL PILE FOUNDATION, REPAIR OF WOODEN TRAIL STEPS, STABILIZATION OF ERODED ARE | $3.5M |
| Jan 9, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000007 | 237310 | PROJECT MS ERFO NPS VICK 2020-1(2) THE PROJECT CONSISTS OF SLIDE REPAIRS ON GRANT AVENUE AND UNION AVENUE. THE WORK INCLUDES CLEARING AND GRUBBING, ROADWAY EXCAVATION AND EMBANKMENT CONSTRUCTION, GEOGRID, GABIONS, AGGREGATE BASE, MECHANICALLY COMPAC | $7.4M |
| Jan 3, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00008N | 237310 | PROJECT NP SER PMS FY24(3): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | $1.5M |
| Dec 31, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00025N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $4.8M |
| Dec 26, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00023N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC | $7.4M |
| Dec 23, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00021N | 237310 | NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO | $2.2M |
| Nov 22, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $154K |
| Nov 22, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00007N | 237310 | PROJECT NP SER PMS FY24(2): THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF IDENTIFIED ROADWAYS INCLUDING PARKING AREAS. THE WORK INCLUDES THIN LIFT OVERLAY OF ASPHALT CONCRETE PAVEMENT, SAMI, FULL DEPTH PATCHING, AND OTHER MISCELLANEOUS WORK. | $1.6M |
| Sep 25, 2024 | Department of the InteriorSER SOUTH MABO (54000) | 140P5424C0027 | 237110 | CONSTRUCTION, REPLACE WASTEWATER TREATMENT PLANT AT DRY TORTUGAS NATIONAL PARK | $1.3M |
| Aug 23, 2024 | Department of the InteriorSER SOUTH MABO (54000) | 140P5424C0019 | 238910 | CONSTRUCTION, REPAIR COLLAPSED STORM DRAIN AT CASTILLO DE SAN MARCOS | $776K |
| Jul 30, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $664K |
| Jul 17, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $314K |
| Jun 7, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324P000031 | 237310 | PROJECT NP NATR 3N16, 3H25, ETC FOR STIPEND FEE FOR UNSUCCESSFUL FIRM. | $25K |
| Apr 24, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $700K |
| Mar 25, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00045N | 237310 | PROJECT NP SLBE 5109(1): THE PROJECT CONSISTS OF CONSTRUCTING LEFT AND RIGHT TURNING LANES ON SOUTH DUNE HIGHWAY (M-109) AT DUNE CLIMB PARKING AREA (ROUTE 920). THE WORK INCLUDES GRADING; AGGREGATE BASE; ASPHALT PAVEMENT MILLING; CONCRETE PAVING; MS | $2.8M |
| Feb 26, 2024 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056724F00019N | 237310 | MI NP MUILTI PMS(1), PAVEMENT PRESERVATION MICHIGAN. WORK CONSISTS OF PATCHING, CRACK SEALING, AND RESURFACING OF ASPHALT SURFACES THROUGH PICTURED ROCKS NATIONAL LAKESHORE AND SLEEPING BEAR FUNES NATIONAL LAKESHORE. | $4.9M |
| Nov 7, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $33K |
| Nov 1, 2023 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 69056724D000006 | 237310 | WESTERN REGION PAVEMENT PRESERVATION MULTIPLE AWARD TASK ORDER CONTRACTS (MATOC) COVERING A 5-YEAR PERIOD FOR HIGHWAY/BRIDGE/ROAD PROJECTS FOR PAVEMENT PRESERVATION WORK IN THE WESTERN UNITED STATES | $25K |
| Aug 30, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $5.2M |
| Jun 29, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000008 | 237310 | THIS PROJECT CONSISTS OF RESURFACING THE NATCHEZ TRACE PARKWAY, INCLUDING RAMPS, BRIDGES, INTERSECTIONS, VARIOUS ACCESS ROADS, AND PARKING/PULL-OFF AREAS. THE WORK WILL INCLUDE ASPHALT OVERLAY, SIDESLOPE REPAIRS, WEDGE AND LEVELING, SPOT PATCHING, AN | $12M |
| Dec 7, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000013 | 237310 | PROJECT NP SER PMS FY21(2): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN BIG CYPRESS NATIONAL PRESERVE. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MA | $601K |
| Aug 5, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000017 | 237310 | PROJECT NP-SER PMS FY22(1) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF 29.57 MILES OF MAIN PARK ROAD INCLUDING PULL-OFF AREAS. THE WORK INCLUDES MICRO SURFACING, PAVEMENT MARKINGS, AND OTHER MISCELLANEOUS WORK. | $4.7M |
| Jun 30, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000011 | 237310 | PROJECT NP SER PMS FY21(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN EVERGLADES NATIONAL PARK. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MARKING INS | $2.1M |
| Jun 2, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000011 | 237310 | PROJECT NP SER PMS FY21(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN EVERGLADES NATIONAL PARK. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MARKING INS | $4.3M |
| May 19, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000109 | 237310 | PROJECT NP-EVER 219(1), 222(1): THE PROJECT CONSISTS OF THE ASPHALT PAVEMENT MILLING AND OVERLAY, ASPHALT PAVEMENT PATCHING, PAVEMENT MARKING, RAISED PAVEMENT MARKER, CULVERT AND MANHOLE REPLACEMENT, REMOVE AND REST INLET FRAME AND GRATE, REPLACEMEN | $1.0M |
| May 12, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000013 | 237310 | PROJECT NP SER PMS FY21(2): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION (MICRO SURFACING) OF ROADS AND PARKING AREAS IN BIG CYPRESS NATIONAL PRESERVE. THE WORK INCLUDES CRACK CLEANING AND SEALING, ASPHALT CONCRETE PAVEMENT PATCHING, PAVEMENT MA | $2.0M |