Federal Contractor Profile
Construction Solutions Group, LLC
$76M obligated·95 awards·8 agencies·17 NAICS
Federal Contracts
Showing award actions 51–100 of 148 funded award actions, most recent first.
- Contracts with positive obligations
- 95
- Funded award actions shown
- 148
- Obligations shown
- $76M
- Awarding agencies
- 8
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 13, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK22C00328 | 237310 | ST. ALBANS, VT (QHB ARSR) ROAD AND PARKING LOT REPLACEMENT | $310K |
| Aug 25, 2022 | Department of the InteriorFWS PACIFIC REGIONAL OFFICE | 140F0122C0093 | 238990 | GA-OKEFENOKEE NWR-BRIDGE REHAB | $195K |
| Jul 20, 2022 | Department of DefenseW6QM MICC FT MCCOY (RC) | W911SA21C2006 | 237310 | CLIN 0001- WI049 CONSTRUCT POV LOT | $58K |
| Mar 10, 2022 | Department of DefenseW6QM MICC FT MCCOY (RC) | W911SA21C2006 | 237310 | CLIN 0001- WI049 CONSTRUCT POV LOT | $24K |
| Jan 7, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000004 | 237310 | PROJECT NP-BLRI 2F27, 2F28 THE PROJECT CONSISTS OF THE SLOPE STABILIZATION REPAIRS AT MILEPOST 276.8, 277.1 AND 323.25. THE WORK INCLUDES FILL SLOPE STABILIZATION WITH REINFORCED SOIL SLOPES AND CUT SLOPE STABILIZATION WITH ROCK BOLTS AND GROUND ANC | $4.3M |
| Dec 27, 2021 | Department of the InteriorFWS PACIFIC REGIONAL OFFICE | 140F0420C0023 | 236220 | CONSTRUCT COLD STORAGE BUILDING | $4K |
| Sep 30, 2021 | Department of DefenseW6QM MICC FT MCCOY (RC) | W911SA21C2006 | 237310 | CLIN 0001- WI049 CONSTRUCT POV LOT | $849K |
| Jun 30, 2021 | Department of DefenseFA6633 934 AW PK | FA663320C0005 | 237310 | PROJECT TITLE: RESTRIPE AND REPAIR AIRCRAFT PARKING APRON | $2K |
| Jun 20, 2021 | Department of DefenseW2SD ENDIST NORFOLK | W9123620C5027 | 237310 | NOAA WALLOPS ROAD REPAIR. | $9K |
| Jan 14, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000029 | 237310 | PROJECT FW IRRI-10(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF HATCHERY ENTRANCE ROADS AND PARKING AREAS. THE WORK INCLUDES CHIP SEAL, ASPHALT PAVEMENT OVERLAY, SIGNING AND STRIPING, DRAINAGE IMPROVEMENTS, PARKING AREA IMPROVEMEN | $232K |
| Sep 30, 2020 | Department of AgricultureSouthwestern Regional Office, Region 3 | 12837120C0133 | 238910 | MIMBRES WATER TANK REMOVAL AND REPLACEMENT | $111K |
| Sep 29, 2020 | Department of DefenseFA6633 934 AW PK | FA663320C0005 | 237310 | PROJECT TITLE: RESTRIPE AND REPAIR AIRCRAFT PARKING APRON | $109K |
| Sep 26, 2020 | Department of DefenseW2SD ENDIST NORFOLK | W9123620C5027 | 237310 | NOAA WALLOPS ROAD REPAIR. | $1.2M |
| Sep 8, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000029 | 237310 | PROJECT FW IRRI-10(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF HATCHERY ENTRANCE ROADS AND PARKING AREAS. THE WORK INCLUDES CHIP SEAL, ASPHALT PAVEMENT OVERLAY, SIGNING AND STRIPING, DRAINAGE IMPROVEMENTS, PARKING AREA IMPROVEMEN | $46K |
| Sep 4, 2020 | Department of the InteriorFWS SOUTHEAST REGIONAL OFFICE | 140F0420C0023 | 236220 | CONSTRUCT COLD STORAGE BUILDING | $299K |
| Jul 24, 2020 | Department of AgricultureUSDA FOREST SERVICE | 1282A720C0082 | 237310 | FORT SIMCOE JOB CORPS CENTER SITE PAVING | $76K |
| Jul 1, 2020 | Department of AgricultureUSDA ARS NEA AAO ACQ/PER PROP | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $95K |
| Jun 26, 2020 | Department of AgricultureUSDA FOREST SERVICE | 1282A720C0082 | 237310 | FORT SIMCOE JOB CORPS CENTER SITE PAVING | $93K |
| Jun 25, 2020 | Department of AgricultureUSDA FOREST SERVICE | 1282A720C0082 | 237310 | FORT SIMCOE JOB CORPS CENTER SITE PAVING | $531K |
| Feb 25, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000012 | 237310 | PROJECT NJ FLAP LHT RD(1) THE PROJECT CONSISTS OF THE PAVEMENT REHABILITATION OF APPROXIMATELY 0.86 MILES OF PLEASANT PLAINS ROAD, WITHIN THE LONG HILL TOWNSHIP. THE WORK INCLUDES ASPHALT CONCRETE PAVEMENT PATCHING, ASPHALT PAVEMENT MILLING AND OVE | $549K |
| Jan 30, 2020 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7320C000010 | 237310 | PROJECT NP-SER PMS FY19(2) THE PROJECT CONSISTS OF REMOVING PAVEMENT MARKINGS, ADD MICRO SURFACING TYPE 2, REMOVE AND RESET WHEEL STOPS, ADD PAVEMENT MARKINGS ON IDENTIFIED PAVED ROADS AND PARKING AREAS, AND OTHER MISCELLANEOUS WORK. | $1.6M |
| Dec 20, 2019 | Department of DefenseW7MT USPFO ACTIVITY AL ARNG | W912JA18C5004 | 237310 | REPAIR BASE PAVEMENT: 1. MILLING AND OVERLAY OF EXISTING ASPHALT PAVED ROADWAYS 2. PATCHING AND REPAIR OF EXISTING ASPHALT BASE COURSES WHERE EXISTING BASE COURSES HAVE FAILED. 3. CONSTRUCTION OF A NEW TRAFFIC CIRCLE IGF::OT::IGF | $11K |
| Oct 22, 2019 | Department of AgricultureUSDA ARS NEA AAO ACQ/PER PROP | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $9K |
| Sep 25, 2019 | Department of AgricultureUSDA ARS NEA AAO ACQ/PER PROP | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $229K |
| Sep 20, 2019 | Department of the InteriorNORTHEAST REGIONAL CONTRACTING | 140P4219C0017 | 237310 | ASIS - REPAIR AND SEALCOAT CAMP ROADS | $330K |
| Sep 6, 2019 | Department of AgricultureUSDA ARS MWA AAO ACQ/PER PROP | 1232SC18C0044 | 238110 | IGF::OT::IGF ERECT FARM STORAGE BLDG.- WOOSTER, OH IN ACCORDANCE WITH THE STATEMENT OF WORK. | $7K |
| Aug 23, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000007 | 237310 | PROJECT NP-GWMP 2(2) THE PROJECT CONSISTS OF THE STABILIZATION OF THE ROADWAY EMBANKMENT NEAR SPOUT RUN ON NORTHBOUND GEORGE WASHINGTON MEMORIAL PARKWAY. THE WORK INCLUDES GROUND ANCHOR INSTALLATION, ASPHALT PAVEMENT MILL AND OVERLAY, AND OTHER MISCELLANEOUS WORK. | $123K |
| Aug 21, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000029 | 237310 | PROJECT FW IRRI-10(1) THE PROJECT CONSISTS OF REHABILITATION AND RECONSTRUCTION OF HATCHERY ENTRANCE ROADS AND PARKING AREAS. THE WORK INCLUDES CHIP SEAL, ASPHALT PAVEMENT OVERLAY, SIGNING AND STRIPING, DRAINAGE IMPROVEMENTS, PARKING AREA IMPROVEMEN | $1.1M |
| Aug 6, 2019 | Department of DefenseW7MT USPFO ACTIVITY AL ARNG | W912JA18C5004 | 237310 | REPAIR BASE PAVEMENT: 1. MILLING AND OVERLAY OF EXISTING ASPHALT PAVED ROADWAYS 2. PATCHING AND REPAIR OF EXISTING ASPHALT BASE COURSES WHERE EXISTING BASE COURSES HAVE FAILED. 3. CONSTRUCTION OF A NEW TRAFFIC CIRCLE IGF::OT::IGF | $45K |
| Jul 22, 2019 | Department of the InteriorFWS SOUTHEAST REGIONAL OFFICE | 140F0419P0204 | 238990 | RESEAL AND ASPHALT UPLAND TRAIL, PARKING LOT, AND BOTTOMLAND TRAIL - WHITE RIVER NWR, AR | $80K |
| Jul 3, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000026 | 237310 | UPPER MISSISSIPPI RIVER, PROJECT NO. FW-UPSA 101(1) - THE PROJECT CONSISTS OF PAVEMENT REHABILITATION OF APPROXIMATELY 2.5 MILES OF RIVER ROAD WILDLIFE DRIVE (ROUTE 101), PAVING OF BLACK OAK DUNE OVERLOOK TURNAROUND, DRAINAGE REPAIRS, CONSTRUCTION OF THREE PARKING AREAS, AND OTHER MISCELLANEOUS WORK. | $1.7M |
| Jun 27, 2019 | Department of the InteriorNATIONAL OPERATIONS CENTER | 140L0619P0022 | 238990 | HIDDEN POND TRAIL RESURFACING | $140K |
| Jun 11, 2019 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G518C0216 | 238990 | FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK FOR REMOVING EXISTING PAVEMENTS, SUB- BASE/GRADE, AND FOR PLACING A ROAD STABILIZATION FABRIC, CRUSHER-RUN STONE BASE AND DENSE BINDER AND TOP COURSE PAVEMENTS AT SNELL LOCK LOCATED IN MASSENA, NEW YORK. THE WORK ALSO INCLUDES REMOVING AND REPLACING BASE MATERIALS WITH CRUSHER-RUN STONE. | $2K |
| May 16, 2019 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18P1001 | 237310 | ENTRANCE ROAD REPLACEMENT | $12K |
| May 15, 2019 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018P0190 | 236220 | IGF::OT::IGF INSTALL GOVERNMENT-FURNISHED BOOTH AT THE LAND PORT OF ENTRY, 10980 I-29, PEMBINA, NORTH DAKOTA. | $6K |
| May 6, 2019 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18P1001 | 237310 | ENTRANCE ROAD REPLACEMENT | $5K |
| May 3, 2019 | Department of AgricultureBoise National Forest | 12026119P0020 | 237310 | LAMOILLE CANYON GUARDRAIL REPAIR | $163K |
| Apr 12, 2019 | Department of DefenseW7MT USPFO ACTIVITY AL ARNG | W912JA18C5004 | 237310 | REPAIR BASE PAVEMENT: 1. MILLING AND OVERLAY OF EXISTING ASPHALT PAVED ROADWAYS 2. PATCHING AND REPAIR OF EXISTING ASPHALT BASE COURSES WHERE EXISTING BASE COURSES HAVE FAILED. 3. CONSTRUCTION OF A NEW TRAFFIC CIRCLE IGF::OT::IGF | $6K |
| Mar 15, 2019 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018P0190 | 236220 | IGF::OT::IGF INSTALL GOVERNMENT-FURNISHED BOOTH AT THE LAND PORT OF ENTRY, 10980 I-29, PEMBINA, NORTH DAKOTA. | $15K |
| Feb 7, 2019 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000007 | 237310 | PROJECT NP-GWMP 2(2) THE PROJECT CONSISTS OF THE STABILIZATION OF THE ROADWAY EMBANKMENT NEAR SPOUT RUN ON NORTHBOUND GEORGE WASHINGTON MEMORIAL PARKWAY. THE WORK INCLUDES GROUND ANCHOR INSTALLATION, ASPHALT PAVEMENT MILL AND OVERLAY, AND OTHER MISCELLANEOUS WORK. | $1.3M |
| Nov 20, 2018 | Department of AgricultureUSDA ARS AFM APD | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $20K |
| Oct 30, 2018 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G518C0216 | 238990 | FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK FOR REMOVING EXISTING PAVEMENTS, SUB- BASE/GRADE, AND FOR PLACING A ROAD STABILIZATION FABRIC, CRUSHER-RUN STONE BASE AND DENSE BINDER AND TOP COURSE PAVEMENTS AT SNELL LOCK LOCATED IN MASSENA, NEW YORK. THE WORK ALSO INCLUDES REMOVING AND REPLACING BASE MATERIALS WITH CRUSHER-RUN STONE. | $4K |
| Sep 28, 2018 | Department of AgricultureUSDA ARS EBSC ACQUISTION BRANCH | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $215K |
| Sep 28, 2018 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR18P1001 | 237310 | ENTRANCE ROAD REPLACEMENT | $648K |
| Sep 25, 2018 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G518C0216 | 238990 | FURNISH ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS, AND PERFORM ALL WORK FOR REMOVING EXISTING PAVEMENTS, SUB- BASE/GRADE, AND FOR PLACING A ROAD STABILIZATION FABRIC, CRUSHER-RUN STONE BASE AND DENSE BINDER AND TOP COURSE PAVEMENTS AT SNELL LOCK LOCATED IN MASSENA, NEW YORK. THE WORK ALSO INCLUDES REMOVING AND REPLACING BASE MATERIALS WITH CRUSHER-RUN STONE. | $250K |
| Sep 20, 2018 | Department of Homeland SecurityCEU MIAMI(00082) | 70Z08218CPAT01200 | 238990 | REPAIR ROOF COLUMN&ROLL UP DOOR GSE SHED (S42) | $247K |
| Sep 19, 2018 | Department of DefenseW075 ENDIST SACRAMENTO | W9123818P0085 | 238990 | CRACK SEAL&SLURRY SEAL AT STANISLAUS RIVER PARKS, CA. | $187K |
| Sep 18, 2018 | Department of DefenseW7MT USPFO ACTIVITY AL ARNG | W912JA18C5004 | 237310 | REPAIR BASE PAVEMENT: 1. MILLING AND OVERLAY OF EXISTING ASPHALT PAVED ROADWAYS 2. PATCHING AND REPAIR OF EXISTING ASPHALT BASE COURSES WHERE EXISTING BASE COURSES HAVE FAILED. 3. CONSTRUCTION OF A NEW TRAFFIC CIRCLE IGF::OT::IGF | $1.5M |
| Sep 17, 2018 | Department of the InteriorHARPERS FERRY CENTER(1100) | 140P1118C0028 | 237310 | HAFC_FSP_PARKING LOT SEALER SERVICES | $49K |
| Sep 10, 2018 | General Services AdministrationPBS R8 ACQUISITION MANAGEMENT DIVISION | 47PJ0018P0190 | 236220 | IGF::OT::IGF INSTALL GOVERNMENT-FURNISHED BOOTH AT THE LAND PORT OF ENTRY, 10980 I-29, PEMBINA, NORTH DAKOTA. | $164K |
Get Alerted Before Construction Solutions Group, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free