Federal Contractor Profile
Construction Solutions Group, LLC
$76M obligated·95 awards·8 agencies·17 NAICS
Federal Contracts
Showing award actions 101–148 of 148 funded award actions, most recent first.
- Contracts with positive obligations
- 95
- Funded award actions shown
- 148
- Obligations shown
- $76M
- Awarding agencies
- 8
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 28, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 4, 2018 | Department of AgricultureUSDA ARS EBSC ACQUISTION BRANCH | 1232SC18C0044 | 238110 | IGF::OT::IGF ERECT FARM STORAGE BLDG.- WOOSTER, OH IN ACCORDANCE WITH THE STATEMENT OF WORK. | $198K |
| Aug 9, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000048 | 237310 | THE PROJECT CONSISTS OF THE REHABILITATION AND RECONSTRUCTION OF NUMEROUS STORM DAMAGED ROADWAYS WITHIN THE CHEQUAMEGON-NICOLET NATIONAL FOREST. THE WORK INCLUDES EARTHWORK, ROADWAY EXCAVATION AND RECONDITIONING, AGGREGATE RESURFACING, ASPHALT PAVEMENT REMOVAL WITH SEPARATION-STABILIZATION GEOTEXTILE AND AGGREGATE BASE REPLACEMENT, ASPHALT CONCRETE PAVEMENT OVERLAY, DRAINAGE IMPROVEMENTS AND REPLACEMENTS, RIPRAP INSTALLATION, AND OTHER MISCELLANEOUS WORK. | $3.1M |
| Jul 30, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000030 | 237310 | IGF::OT::IGF PROJECT: NP-NER PMS WV(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION OF EXISTING PARKING AREAS WITHIN THE NEW RIVER GORGE NATIONAL RIVER. THE WORK INCLUDES ASPHALT PAVEMENT MICRO SURFACING, FULL-DEPTH PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CURB, AND OTHER MISCELLANEOUS WORK. | $25K |
| Jul 18, 2018 | Department of AgricultureUSDA ARS WBSC ACQUISITION BRANCH | 1232SD18C0029 | 236220 | WAREHOUSE TRACTOR SHED FITNESS CENTER IMPROVEMENTS (2680) | $123K |
| Apr 20, 2018 | Department of the InteriorMWR MISSOURI MABO(62000) | 140P6218P0038 | 236220 | IGF::OT::IGF, INSTALLATION OF PREFABRICATED COMFORT STATION (RESTROOM) IN PEA RIDGE NATIONAL MILITARY PARK. | $92K |
| Apr 3, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000003 | 237310 | IGF::OT::IGF PROJECT: GWMP 5(4) THE PROJECT CONSISTS OF THE STABILIZATION OF THE ROCK SLOPE ALONG WESTBOUND SPOUT RUN PARKWAY. THE WORK INCLUDES SELECTIVE CLEARING, ROCK SCALING, AND OTHER MISCELLANEOUS WORK. | $9 |
| Feb 1, 2018 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000030 | 237310 | IGF::OT::IGF PROJECT: NP-NER PMS WV(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION OF EXISTING PARKING AREAS WITHIN THE NEW RIVER GORGE NATIONAL RIVER. THE WORK INCLUDES ASPHALT PAVEMENT MICRO SURFACING, FULL-DEPTH PAVEMENT PATCHING, CRACK CLEANING AND SEALING, ASPHALT CURB, AND OTHER MISCELLANEOUS WORK. | $517K |
| Nov 21, 2017 | Department of DefenseW072 ENDIST BUFFALO | W912P417P0038 | 238990 | IGF::OT::IGF MMD ASPHALT SEALCOATING PROJECT | $76K |
| Nov 17, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7318C000003 | 237310 | IGF::OT::IGF PROJECT: GWMP 5(4) THE PROJECT CONSISTS OF THE STABILIZATION OF THE ROCK SLOPE ALONG WESTBOUND SPOUT RUN PARKWAY. THE WORK INCLUDES SELECTIVE CLEARING, ROCK SCALING, AND OTHER MISCELLANEOUS WORK. | $232K |
| Sep 29, 2017 | Department of DefenseW076 ENDIST TULSA | W912BV17C0028 | 238120 | IGF::OT::IGF CHICKEN CREEK | $240K |
| Sep 29, 2017 | Department of DefenseW072 ENDIST BUFFALO | W912P417P0038 | 238990 | IGF::OT::IGF MMD ASPHALT SEALCOATING PROJECT | $8K |
| Sep 28, 2017 | Department of AgricultureUSDA ARS EBSC ACQUISTION BRANCH | AG32SCC170102 | 236220 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE AND INSTALL THE GREENHOUSE INCLUDING SITE WORK AND UTILITIES (CONCRETE SLAB FLOORS AND UTILITIES-NATURAL GAS, ELECTRICAL POWER, SANITARY SEWER, WATER) AS INDICATED IN THE CONTRACT DOCUMENTS. THE PROJECT HAS BEEN REDUCED BY AMENDMENT TO HAVE TWO BAYS VERSUS THE ORIGINAL FOUR BAYS REQUESTED. | $390K |
| Sep 28, 2017 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR17P0177 | 236220 | IGF::OT::IGF CONSTRUCTION OF SHELTER HOUSE - CML | $75K |
| Sep 22, 2017 | Department of DefenseUS ARMY ENGINEER DISTRICT WALLA WAL | W912EF17P5058 | 238990 | IGF::OT::IGF MNA PARKING TOP OF DAM | $5K |
| Sep 12, 2017 | Department of DefenseW7NS USPFO ACTIVITY NC ARNG | W9124217C0006 | 236220 | IGF::OT::IGF WEFM172100 - REPAIR MULTIPLE FACILITIES | $79K |
| Sep 8, 2017 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR17P0142 | 237310 | IGF::OT::IGF TAILWATER RECREATION AREA. | $68K |
| Aug 28, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00010 | 237310 | IGF::OT::IGF PROJECT: SARA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION AND REPAIR OF THREE BRIDGES AND A DOUBLE BARREL CORRUGATED METAL PIPE CULVERT WITHIN THE SARATOGA NATIONAL HISTORICAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING AND REPLACING WITH A LATEX MODIFIED PAVEMENT OVERLAY, REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING STONE MASONRY, REPLACING BRIDGE RAIL ELEMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. | $9K |
| Aug 14, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00010 | 237310 | IGF::OT::IGF PROJECT: SARA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION AND REPAIR OF THREE BRIDGES AND A DOUBLE BARREL CORRUGATED METAL PIPE CULVERT WITHIN THE SARATOGA NATIONAL HISTORICAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING AND REPLACING WITH A LATEX MODIFIED PAVEMENT OVERLAY, REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING STONE MASONRY, REPLACING BRIDGE RAIL ELEMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. | $7K |
| Aug 7, 2017 | Department of Veterans AffairsNATIONAL CEMETERY ADMIN (36C786) | VA78617C0182 | 237110 | IGF::OT::IGF - SUBSURFACE DRAINAGE PROJECT - FORT GIBSON, OK | $94K |
| Aug 1, 2017 | Department of the InteriorMWR MIDWEST REGION(60000) | INP17PC00286 | 237110 | IGF::CL::IGF, CONSTRUCTION, REHABILITATE SEPTIC SYSTEM AT OSCEOLA LANDING, SACN THIS CONTRACT AWARD IS FOR THE REHABILITATION OF THE SEPTIC SYSTEM AT OSCEOLA LANDING AT SAINT CROIX NSR IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS PROVIDED TO THE VENDOR AND THE VENDOR QUOTE RECEIVED DATED 06/19/2017. FOR ADMINISTRATIVE MATTERS CONTACT CONTRACT SPECIALIST NICHOLAS M MURRAY, 402-661-1698, NICHOLAS_M_MURRAY@NPS.GOV INVOICING REMINDER: ALL INVOICES SHALL BE SUBMITTED ELECTRONICALLY THROUGH THE INVOICE PROCESSING PLATFORM (HTTPS://WWW.IPP.GOV/) FOR PAYMENT WITH A SCANNED COPY OF YOUR TRADITIONAL PAPER INVOICE ATTACHED TO YOUR ELECTRONIC SUBMISSION. | $99K |
| Jul 31, 2017 | Department of DefenseFA4855 27 SOCONS LGC | FA485517P0030 | 332311 | 10' X 51' CORRUGATED ROUND PIPE TORNADO SHELTER 10' X 30' CORRUGATED ROUND PIPE TORNADO SHELTER EXCAVATION, INSTALLATION, BACKFILL | $309K |
| Jul 25, 2017 | Department of DefenseW071 ENDIST SEATTLE | W912DW17P0118 | 237310 | IGF::OT::IGF PAVING - YAKIMA LEVEE REHAB | $117K |
| Jul 14, 2017 | Department of the InteriorFWS PACIFIC REGIONAL OFFICE | INF17PX01345 | 238190 | IGF::OT::IGF; CA - LIVINGSTON STONE NFH - METAL ROOF STRUCTURE | $105K |
| Jul 14, 2017 | Department of DefenseUS ARMY ENGINEER DISTRICT WALLA WAL | W912EF17P5058 | 238990 | IGF::OT::IGF MNA PARKING TOP OF DAM | $148K |
| Jul 13, 2017 | Department of the InteriorFWS MIDWEST REGIONAL OFFICE | INF17PX01357 | 238160 | IGF::OT::IGF HOLDING HOUSE AND STORAGE BLDG ROOF REPLACEMENT AT GENOA NFH | $94K |
| Jun 22, 2017 | Department of the InteriorMP-REGIONAL OFFICE | INR16PC00100 | 237310 | IGF::CT::IGF R16PC00100 - LAKE WOOLOMES RECREATION AREA ASPHALT REPLACEMENT | $225 |
| Jun 21, 2017 | Department of the InteriorFWS MOUNTAIN-PRAIRIE REGIONAL OFFIC | INF17PC00055 | 237310 | ""IGF::OT::IGF"" BOZEMAN FISH TECHNOLOGY CENTER, ROAD REPAIRS AND REHABILITATION | $52K |
| Jun 16, 2017 | Department of AgricultureUSDA ARS EBSC ACQUISTION BRANCH | AG32SCC170037 | 238160 | IGF::OT::IGF GREENHOUSE 4 -- REPLACEMENT OF ALL ROOF PANELS | $59K |
| Jun 1, 2017 | Department of the InteriorOFC OF ACQUISITION GRANTS-DENVER | ING17PC00047 | 236220 | IGF::OT::IGF F11 INSTALL WATER SUPPLY AND DRAIN LINES | $172K |
| May 2, 2017 | Department of the InteriorFWS MOUNTAIN-PRAIRIE REGIONAL OFFIC | INF17PC00055 | 237310 | ""IGF::OT::IGF"" BOZEMAN FISH TECHNOLOGY CENTER, ROAD REPAIRS AND REHABILITATION | $347K |
| May 1, 2017 | Department of the InteriorMP-REGIONAL OFFICE | INR16PC00100 | 237310 | IGF::CT::IGF R16PC00100 - LAKE WOOLOMES RECREATION AREA ASPHALT REPLACEMENT | $21K |
| Mar 22, 2017 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | DTFH7117C00010 | 237310 | IGF::OT::IGF PROJECT: SARA BMS(1) THE PROJECT CONSISTS OF THE REHABILITATION AND REPAIR OF THREE BRIDGES AND A DOUBLE BARREL CORRUGATED METAL PIPE CULVERT WITHIN THE SARATOGA NATIONAL HISTORICAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT MILLING AND REPLACING WITH A LATEX MODIFIED PAVEMENT OVERLAY, REPAIRING CONCRETE SPALLS AND DETERIORATED CONCRETE AREAS, CLEANING AND SEALING CRACKS AND JOINTS, REPAIRING STONE MASONRY, REPLACING BRIDGE RAIL ELEMENTS, PLACING RIPRAP, AND OTHER MISCELLANEOUS WORK. | $496K |
| Jan 25, 2017 | Department of the InteriorMP-REGIONAL OFFICE | INR16PC00100 | 237310 | IGF::CT::IGF R16PC00100 - LAKE WOOLOMES RECREATION AREA ASPHALT REPLACEMENT | $3K |
| Jan 12, 2017 | Department of the InteriorMP-REGIONAL OFFICE | INR16PC00100 | 237310 | IGF::CT::IGF R16PC00100 - LAKE WOOLOMES RECREATION AREA ASPHALT REPLACEMENT | $21K |
| Jan 11, 2017 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | INP16PC00815 | 237310 | IGF::OT::IGF REHABILITATE ADMIN ROADS. PMIS #179858 REHABILITATE ADMIN ROADS AT SHENANDOAH NATIONAL PARK | $3K |
| Dec 19, 2016 | Department of the InteriorNORTHEAST REGIONAL CONTRACTING | INP17PC00031 | 237110 | IGF::OT::IGF G:OTHER, GATEWAY NATIONAL RECREATIONAL AREA, BROOKLYN, NY, CONSTRUCTION OF A NEW RECREATIONAL VEHICLE SEWAGE DUMP STATION ADJACENT TO THE CAMPGROUND AT FLOYD BENNETT FIELD. GREEN SPECIFICATIONS - SPECS CALL FOR SOLAR POWERED STREET LIGHT BY THE NEW DUMP STATION. | $59K |
| Nov 3, 2016 | Department of the InteriorOFC OF ACQUSITION GRANTS-NATIONAL | ING15PC00052 | 236220 | IGF::OT::IGF CONSTRUCTION SERVICES FOR THE REPLACEMENT AND RELOCATION OF AN EXISTING SECURITY BOOTH STRUCTURE. | $7K |
| Sep 23, 2016 | Department of the InteriorFWS SOUTHEAST REGIONAL OFFICE | INF16PX02808 | 238990 | IGF::OT::IGF REHAB SHOP POLE STORAGE BUILDING | $87K |
| Sep 22, 2016 | Department of the InteriorWASHINGTON CONTRACTING OFFICE | INP16PC00815 | 237310 | IGF::OT::IGF REHABILITATE ADMIN ROADS. PMIS #179858 REHABILITATE ADMIN ROADS AT SHENANDOAH NATIONAL PARK | $300K |
| Sep 20, 2016 | Department of the InteriorFWS NORTHEAST REGIONAL OFFICE | INF15PC00189 | 238990 | IGF::OT::IGF METAL STORAGE BLGD/EISENHOWER | $2K |
| Sep 18, 2016 | Department of DefenseW072 ENDIST HUNTINGTON | W9123716P0094 | 237990 | IGF::OT::IGF REPLACEMENT OF 3 TAINTER GATES AT DEER CREEK, MOUNT STERLING, OH | $62K |
| Aug 12, 2016 | Department of DefenseW072 ENDIST LOUISVILLE | W912QR16P0048 | 237990 | REPAIR THEATER DRAIN | $55K |
| Jul 13, 2016 | Department of the InteriorMP-REGIONAL OFFICE | INR16PC00100 | 237310 | IGF::CT::IGF R16PC00100 - LAKE WOOLOMES RECREATION AREA ASPHALT REPLACEMENT | $135K |
| Jun 22, 2016 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | DTFH7016C00020 | 237310 | IGF::CT::IGF IL NPS PRES 15(1), PAVEMENT PRESERVATION ILLINOIS | $237K |
| Jun 7, 2016 | Department of the InteriorFWS NORTHEAST REGIONAL OFFICE | INF15PC00189 | 238990 | IGF::OT::IGF METAL STORAGE BLGD/EISENHOWER | $3K |
| May 23, 2016 | Department of DefenseCOMMANDING GENERAL | M6700114P0202 | 237310 | DUST ABATEMENT | $92K |
| Apr 5, 2016 | Department of DefenseW07V ENDIST ST PAUL | W912ES16P0064 | 238910 | IGF::OT::IGF TRENCH DRAIN | $50K |
| Nov 23, 2015 | Department of the InteriorCONTRACTING AND GENERAL SERVICES DIV | INF15PC00104 | 237990 | IGF::OT::IGF REPLACE WATER CONTROL STRUCTURE AT MOOSEHORN NATIONAL WILDLIFE REFUGE, BARING, MAINE. | $3K |
Get Alerted Before Construction Solutions Group, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free