MMindy finds federal opportunities that fit you, daily.Try free →
Home/Contractors/D. A. Collins Construction CO., INC.

Federal Contractor Profile

D. A. Collins Construction CO., INC.

Federal contracting record: $60M obligated across 5 awards from 2 agencies, FY 20162025.

$60M
Total Obligated
5
Award Records
2
Agencies Served
2
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

NG8JL8JJQ913

CAGE Code

1BNC8

Registered Entities (UEIs)

2 under this organization

Address

269 BALLARD RD, GANSEVOORT, NY, 128311357

First Federal Award

Feb 19, 2016

Most Recent Award

May 8, 2025

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Defense

    76.5% of total obligations

    $46M
  • Department of Transportation

    23.5% of total obligations

    $14M

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    1 awards

    $40M
  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    4 awards

    $20M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 3, 2025Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$50K
Feb 22, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$16K
Jan 29, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$90K
Jan 23, 2024Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$20K
Mar 1, 2023Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$11K
Feb 13, 2023Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$15K
Nov 10, 2022Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990SNELL LOCK DIFFUSER REPLACEMENT.$7.5M
Mar 7, 2022Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$72K
Aug 24, 2021Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$20K
Feb 17, 2021Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$49K
Nov 30, 2020Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$6.2M
Nov 30, 2020Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP.237990DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK.$7K
Jun 11, 2019Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$87K
Oct 17, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$151K
Aug 30, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$105K
May 30, 2018Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$21K
May 3, 2018Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$143K
May 1, 2018Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$52K
Jan 11, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$49K
Jan 3, 2018Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$11K
Dec 6, 2017Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$97K
Nov 14, 2017Department of DefenseW7N4 USPFO ACTIVITY VT ARNG237310IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW.$30K
Nov 3, 2017Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$26K
Aug 16, 2017Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$32K
Jun 20, 2017Department of DefenseW2SD ENDIST NEW YORK237990IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM$14K

Related Contractors

Other companies active in NAICS 237310HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.

Track D. A. Collins Construction CO., INC. Recompetes Before They Post

Mindy monitors D. A. Collins Construction CO., INC.'s active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts