D. A. Collins Construction CO., INC.
Federal contracting record: $60M obligated across 5 awards from 2 agencies, FY 2016–2025.
Company Profile
Parent UEI (Unique Entity Identifier)
NG8JL8JJQ913
CAGE Code
1BNC8
Registered Entities (UEIs)
2 under this organization
Address
269 BALLARD RD, GANSEVOORT, NY, 128311357
First Federal Award
Feb 19, 2016
Most Recent Award
May 8, 2025
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $46M
Department of Defense
76.5% of total obligations
- $14M
Department of Transportation
23.5% of total obligations
Top NAICS Activity
- $40M
237310
HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
1 awards
- $20M
237990
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION
4 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Apr 3, 2025 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $50K |
| Feb 22, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $16K |
| Jan 29, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $90K |
| Jan 23, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $20K |
| Mar 1, 2023 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $11K |
| Feb 13, 2023 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $15K |
| Nov 10, 2022 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $7.5M |
| Mar 7, 2022 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $72K |
| Aug 24, 2021 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $20K |
| Feb 17, 2021 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $49K |
| Nov 30, 2020 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $6.2M |
| Nov 30, 2020 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $7K |
| Jun 11, 2019 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $87K |
| Oct 17, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $151K |
| Aug 30, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $105K |
| May 30, 2018 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $21K |
| May 3, 2018 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $143K |
| May 1, 2018 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $52K |
| Jan 11, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $49K |
| Jan 3, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $11K |
| Dec 6, 2017 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $97K |
| Nov 14, 2017 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $30K |
| Nov 3, 2017 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $26K |
| Aug 16, 2017 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $32K |
| Jun 20, 2017 | Department of DefenseW2SD ENDIST NEW YORK | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $14K |
Related Contractors
Other companies active in NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.