Federal Contractor Profile
D. A. Collins Construction CO., INC.
$60M obligated·5 awards·2 agencies·2 NAICS
Federal Contracts
Showing award actions 1–28 of 28 funded award actions, most recent first.
- Contracts with positive obligations
- 5
- Funded award actions shown
- 28
- Obligations shown
- $60M
- Awarding agencies
- 2
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of May 8, 2025. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Apr 3, 2025 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $50K |
| Feb 22, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $16K |
| Jan 29, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $90K |
| Jan 23, 2024 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $20K |
| Mar 1, 2023 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $11K |
| Feb 13, 2023 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $15K |
| Nov 10, 2022 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G523C0013 | 237990 | SNELL LOCK DIFFUSER REPLACEMENT. | $7.5M |
| Mar 7, 2022 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G521C0032 | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $72K |
| Aug 24, 2021 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $20K |
| Feb 17, 2021 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G521C0032 | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $49K |
| Nov 30, 2020 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G521C0032 | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $6.2M |
| Nov 30, 2020 | Department of Transportation6923G5 GREAT LAKES ST LAWRENCE SWY DEV. CORP. | 6923G521C0032 | 237990 | DESIGN AND CONSTRUCTION FOR REPLACEMENT OF DIFFUSER STRUCTURES AT LOCK. | $7K |
| Jun 11, 2019 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $87K |
| Oct 17, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $151K |
| Aug 30, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $105K |
| May 30, 2018 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $21K |
| May 3, 2018 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $143K |
| May 1, 2018 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $52K |
| Jan 11, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $49K |
| Jan 3, 2018 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $11K |
| Dec 6, 2017 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $97K |
| Nov 14, 2017 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $30K |
| Nov 3, 2017 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $26K |
| Aug 16, 2017 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $32K |
| Jun 20, 2017 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $14K |
| Apr 17, 2017 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $3K |
| Sep 23, 2016 | Department of DefenseW2SD ENDIST NEW YORK | W912DS16C0024 | 237990 | IGF::OT::IGF TROY LOCK MITER GATES REPAIR, TROY LOCK AND DAM | $5.1M |
| Sep 23, 2016 | Department of DefenseW7N4 USPFO ACTIVITY VT ARNG | W912LN16C0007 | 237310 | IGF::OT::IGF PROJECT NUMBER CURZ152809 TAXIWAY F&NORTH ARM/PAD, CURZ152810 TAXIWAY D&NORTH ARM/PAD, CURZ152811 AIRFIELD PAVEMENTS AT THE 158TH FIGHTER WING, SOUTH BURLINGTON, VERMONT. APRON WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 64,000 SQUARE YARDS (SY) OF PORTLAND CEMENT CONCRETE (PCC) AND ASPHALT CEMENT CONCRETE (ACC) ON THE NORTH AND SOUTH APRON WITH SLIP-FORM PCC PAVING WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN APRON AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY D WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 33,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. TAXIWAY F WORK INCLUDES COMPLETE FULL-DEPTH REPAIR OF OVER 62,000 SY OF PCC AND ACC ON THE TAXIWAY WITH SLIP-FORM PCC PAVING AND ACC SHOULDERS WHICH INCLUDES CONSTRUCT SUB-BASE, BASE COURSE, DRAINAGE, RELOCATE UTILITIES, ASPHALT SHOULDERS, AND ADJUSTS LONGITUDINAL GRADES AS REQUIRED. STORM DRAINAGE WITHIN TAXIWAY AND SHOULDERS WILL BE INCLUDED WITHIN THIS WORK. TAXIWAY EDGE LIGHTS AND AIRFIELD LIGHTING CIRCUITS AFFECTED WILL BE REPLACED WITH NEW. | $40M |
Get Alerted Before D. A. Collins Construction CO., INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free