Skip to content
Home/Contractors/Eclipse Companies, LLC

Federal Contractor Profile

Eclipse Companies, LLC

Federal contracting record: $113M obligated across 44 awards from 3 agencies, FY 2018–2026.

$113M
Total Obligated
44
Award Records
3
Agencies Served
2
NAICS Codes

Company Profile

Parent UEI (Unique Entity Identifier)

RMCMTCKHMFH9

CAGE Code

7UMN9

Address

11554 WASHINGTON ST, CHAGRIN FALLS, OH, 440239213

First Federal Award

Jun 25, 2018

Most Recent Award

Aug 5, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

Top NAICS Activity

  • 237310

    HIGHWAY, STREET, AND BRIDGE CONSTRUCTION

    41 awards

    $107M
  • 237990

    OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

    3 awards

    $6.2M

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Jul 14, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OT$1.2M
Jun 1, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN$93K
May 15, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D$58K
Apr 21, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL$897K
Mar 27, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA$99K
Feb 26, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEME$2.1M
Dec 17, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D$30M
Nov 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL$18M
Oct 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC$5.7M
Sep 30, 2025Department of AgricultureUSDA-FS, CSA EAST 12237310NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT$207K
Sep 12, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A$1.1M
Sep 4, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN$1.6M
Sep 4, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B$717K
Aug 21, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$58K
Aug 19, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD$2.1M
Aug 6, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$288K
Jul 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, RO$4.7M
Jun 24, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$500K
Apr 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR$9K
Apr 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA$530K
Apr 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$2.7M
Feb 26, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$3.0M
Jan 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND$999K
Nov 21, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK.$3.3M
Nov 14, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION237310PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR$264K

Want to win work like Eclipse Companies, LLC?

Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.