Skip to content

Federal Contractor Profile

Eclipse Companies, LLC

$113M obligated·44 awards·3 agencies·2 NAICS

Federal Contracts

Showing award actions 1–50 of 71 funded award actions, most recent first.

Contracts with positive obligations
44
Funded award actions shown
71
Obligations shown
$113M
Awarding agencies
3

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 5, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Jul 14, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00073N237310PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OT$1.2M
Jun 1, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00108N237310KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN$93K
May 15, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00012N237310PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D$58K
Apr 21, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00006N237310PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL$897K
Mar 27, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00012N237310PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA$99K
Feb 26, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00036N237310PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEME$2.1M
Dec 17, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00012N237310PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D$30M
Nov 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00006N237310PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL$18M
Oct 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00001N237310AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC$5.7M
Sep 30, 2025Department of AgricultureUSDA-FS, CSA EAST 1212445225F0055237310NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT$207K
Sep 12, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00119N237310KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A$1.1M
Sep 4, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00108N237310KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN$1.6M
Sep 4, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00111N237310THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B$717K
Aug 21, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00044N237310PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$58K
Aug 19, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00105N237310PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD$2.1M
Aug 6, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00037N237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$288K
Jul 18, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00090N237310PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, RO$4.7M
Jun 24, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00037N237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$500K
Apr 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00005N237310PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR$9K
Apr 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00043N237310PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA$530K
Apr 1, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00044N237310PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK.$2.7M
Feb 26, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00037N237310PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN$3.0M
Jan 10, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00027N237310PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND$999K
Nov 21, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00006N237310PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK.$3.3M
Nov 14, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00005N237310PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR$264K
Sep 19, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00062N237310PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP$100K
Sep 12, 2024Department of DefenseW07V ENDIST VICKSBURGW912EE24C0014237990MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES.$1.7M
Sep 4, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00043N237310PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.$944
Jun 20, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00066N237310PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING. THE WORK INCLUDES GRADING, DRAINAGE, AGGREGATE SURFACE COURSE, CONCRET$2.3M
Jun 7, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324P000030237310PROJECT NP NATR 3N16, 3H25, ETC, TO INITIALLY AUTHORIZE GAOA FUNDS FOR DESIGN-BUILD SOLICITATION AND RELEASE OF THE /RFQ/ RFP$25K
May 28, 2024Department of AgricultureUSDA-FS, CSA EAST 1112445124D0005237310IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-NORTH ZONE$2K
May 21, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00062N237310PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP$817K
May 21, 2024Department of AgricultureUSDA-FS, CSA EAST 1112445124D0010237310IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-WEST ZONE$2K
Apr 3, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00012N237310PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA$146K
Mar 22, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00004N237310PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO$91K
Mar 1, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00021N237310PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE$1.1M
Feb 20, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00026N237310THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.$27K
Dec 20, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00043N237310PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.$11K
Dec 19, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00021N237310PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE$1.1M
Nov 15, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00004N237310PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO$1.4M
Sep 12, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7319C000006237310PROJECT NP-GREE 11(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF ROADWAYS AND PARKING AREAS, CONSTRUCTION OF A BRIDGE, AND REPLACEMENT OF CULVERTS IN THE GREENBELT PARK. THE WORK INCLUDES FULL-DEPTH RECONSTRUCTION OF ASPHALT PAVEMENT, ASPHALT PAVEMENT MILL AND OVERLAY, ASPHALT REMOVAL ON BIKE TRAIL, A GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM (GRS-IBS) BRIDGE CONSTRUCTION, HEADWALL AND BOX CULVERT INSTALLATIONS, GRAVEL DIAPHRAGM INSTALLATION AS STORMWATER MANAGEMENT, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENT, AND OTHER MISCELLANEOUS WORK.$25K
Sep 8, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00026N237310THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.$985K
Mar 20, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00043N237310PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER.$2.3M
Mar 3, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00031N237310PROJECT FW-GRCO TRL(1): THE PROJECT CONSISTS OF REPLACING THE DAMAGED BOARDWALK ON HEADQUARTERS BOARDWALK TRAIL. THE WORK INCLUDES DESIGN SERVICES, TIMBER PILE AND TIMBER BOARDWALK CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.$1.8M
Feb 23, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00012N237310PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA$2.8M
Feb 3, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00026N237310THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK.$1.5M
Aug 23, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00067N237310PROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.$62K
Aug 22, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000099237310PROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF S$133K
May 25, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00067N237310PROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK.$339K
Aug 26, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000099237310PROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF S$1.4M

Get Alerted Before Eclipse Companies, LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start for free