Federal Contractor Profile
Eclipse Companies, LLC
$113M obligated·44 awards·3 agencies·2 NAICS
Federal Contracts
Showing award actions 1–50 of 71 funded award actions, most recent first.
- Contracts with positive obligations
- 44
- Funded award actions shown
- 71
- Obligations shown
- $113M
- Awarding agencies
- 3
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 5, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jul 14, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00073N | 237310 | PROJECT TN ERFO FS CHRKE804 2021-1(1): THE PROJECT CONSISTS OF REPAIRING STORM AND FLOOD DAMAGE ON HURRICANE GAP ROAD (FS 31). THE SCOPE OF WORK INCLUDES DESIGN SERVICES, SLOPE STABILIZATION, ROADWAY RECONSTRUCTION, ASPHALT CONCRETE PAVEMENT, AND OT | $1.2M |
| Jun 1, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00108N | 237310 | KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN | $93K |
| May 15, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00012N | 237310 | PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D | $58K |
| Apr 21, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00006N | 237310 | PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL | $897K |
| Mar 27, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00012N | 237310 | PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA | $99K |
| Feb 26, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00036N | 237310 | PROJECT AR FW BLD 11(1): THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND RESURFACING OF GRANARY SOUTH ROAD (ROUTE 011). THE WORK INCLUDES BANK STABILIZATION, AGGREGATE BASE (LIMESTONE), AGGREGATE SURFACE COURSE (LIMESTONE), PIPE CULVERT REPLACEME | $2.1M |
| Dec 17, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00012N | 237310 | PROJECT NC NP BLRI 2M31; NC NP BLRI 2N24; NC NP BLRI 2M26, 2N22: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 344.3 TO 351.9. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWALL INSTALLATION, D | $30M |
| Nov 25, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00006N | 237310 | PROJECT NC NP BLRI 2M28; NC NP BLRI 2M29: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 336.7, 336.75, 336.85, 336.95, 337.2, 338.2 AND MP 338.4. THE WORK INCLUDES SLIDE REPAIRS, CULVERT CLEANING, CULVERT INSTALLATION, STONE MASONRY HEADWAL | $18M |
| Oct 10, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00001N | 237310 | AR ERFO FS OZSTF810 2022-1(1): THE PROJECT CONSISTS OF THE PERMANENT SLIDE REPAIR OF WHITE ROCK ROAD (NFSR 1003) AND EAST FLY GAP ROAD (NFSR 1503). THE WORK INCLUDES ROADWAY RECONSTRUCTION AND RECONDITIONING, EMBANKMENT STABILIZATION, CULVERT REPLAC | $5.7M |
| Sep 30, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 12445225F0055 | 237310 | NRE-2926, DOGE APPROVED 7/15 080109 RHELM CON ROAD MAINTENANCE CONTRACT | $207K |
| Sep 12, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00119N | 237310 | KY NP CUGA BRG(1) THE WORK INCLUDES REPLACING SUPERSTRUCTURE, CLEANING AND PAINTING RUSTED AREAS OF STEEL ARCH ALONG THE FOUNDATIONS, REMOVING FLOOD DEBRIS AND FALLEN TREES, REPAIRING SCOUR ALONG FOUNDATIONS, MILL AND OVERLAY OF BRIDGE APPROACHES, A | $1.1M |
| Sep 4, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00108N | 237310 | KY NP MACA 16(1), 200(1): THE PROJECT CONSISTS OF RECONFIGURATION OF THE INTERSECTION OF CAVE CITY ROAD AND FROZEN NIAGARA ROAD. THE WORK INCLUDES INTERSECTION AND ROADWAY REALIGNMENT, ROADWAY OBLITERATION, CLEARING AND GRUBBING, DRAINAGE IMPROVEMEN | $1.6M |
| Sep 4, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00111N | 237310 | THE PROJECT CONSISTS OF THE RECONSTRUCTION OF HATCHERY ENTRANCE ROAD (ROUTE 010), VISITOR OVERFLOW PARKING (ROUTE 900), VISITOR PARKING (ROUTE 903), AND 301AZ WITHIN THE NASHUA NATIONAL FISH HATCHERY. THE WORK INCLUDES ROADWAY EXCAVATION, AGGREGATE B | $717K |
| Aug 21, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00044N | 237310 | PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $58K |
| Aug 19, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00105N | 237310 | PROJECT TN NP GRSM 10N(5) THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON NEWFOUND GAP ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES CONSTRUCTING A REINFORCED ROCKERY WALL, CONSTRUCTING AN AGGREGATE-TOPSOIL COURSE SHOULD | $2.1M |
| Aug 6, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00037N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $288K |
| Jul 18, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00090N | 237310 | PROJECT OH ERFO FS WAYNE914 2021-1(1) THE PROJECT CONSISTS OF THE REPAIR AND RECONSTRUCTION OF VESUVIUS ROAD (FS 1955) AND HANGING ROCK SPUR A (FS 105A). THE WORK INCLUDES THE REHABILITATION OF SIX SITES, INVOLVING SLOPE REPAIRS, DEEP PATCHING, RO | $4.7M |
| Jun 24, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00037N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $500K |
| Apr 10, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00005N | 237310 | PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR | $9K |
| Apr 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00043N | 237310 | PROJECT MS NP NATR BMS FY24(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REPA | $530K |
| Apr 1, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00044N | 237310 | PROJECT TN ERFO FS CHRKE804 2020-1(1) THE PROJECT CONSISTS OF REPAIRS TO ROCKY TOP ROAD (FS 402) FOR A LENGTH OF 3.43 MILES, INCLUDING ROADWAY AND DITCH RECONDITIONING, AGGREGATE SURFACING, DRAINAGE IMPROVEMENTS, AND OTHER MISCELLANEOUS WORK. | $2.7M |
| Feb 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00037N | 237310 | PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN | $3.0M |
| Jan 10, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00027N | 237310 | PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND | $999K |
| Nov 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00006N | 237310 | PROJECT MS NP NATR 3P28: THE PROJECT CONSISTS OF MILLING AND ROAD OVERLAY OF ACCESS RAMPS TO INTERSTATE 55. THE WORK ALSO INCLUDES BRIDGE REPAIR, SIGNING, PAVEMENT STRIPING AND OTHER MISCELLANEOUS WORK. | $3.3M |
| Nov 14, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00005N | 237310 | PROJECT LA NP JELA 7530-001P THE PROJECT CONSISTS OF THE REHABILITATION OF STRUCTURE 7530-001P OVER BAYOU DES FAMILLES IN THE JEAN LAFITTE NATIONAL HISTORICAL PARK AND PRESERVE. THE WORK INCLUDES PERFORMING DESIGN SERVICES, REMOVING AND REPLACING BR | $264K |
| Sep 19, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00062N | 237310 | PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP | $100K |
| Sep 12, 2024 | Department of DefenseW07V ENDIST VICKSBURG | W912EE24C0014 | 237990 | MDHP RP-18-03, CONSTRUCTION OF FIVE RISER PIPE GRADE CONTROL STRUCTURES. | $1.7M |
| Sep 4, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00043N | 237310 | PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER. | $944 |
| Jun 20, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00066N | 237310 | PROJECT MS ERFO FW HILL 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF TWO BOARDWALKS AND THE REHABILITATION OF ALLIGATOR SLOUGH NATURE TRAIL AND PARKING. THE WORK INCLUDES GRADING, DRAINAGE, AGGREGATE SURFACE COURSE, CONCRET | $2.3M |
| Jun 7, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324P000030 | 237310 | PROJECT NP NATR 3N16, 3H25, ETC, TO INITIALLY AUTHORIZE GAOA FUNDS FOR DESIGN-BUILD SOLICITATION AND RELEASE OF THE /RFQ/ RFP | $25K |
| May 28, 2024 | Department of AgricultureUSDA-FS, CSA EAST 11 | 12445124D0005 | 237310 | IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-NORTH ZONE | $2K |
| May 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00062N | 237310 | PROJECT: MS NP NATR BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 14 BRIDGES ALONG THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CLEANING AND RESEALING JOINTS, CONCRETE REP | $817K |
| May 21, 2024 | Department of AgricultureUSDA-FS, CSA EAST 11 | 12445124D0010 | 237310 | IDIQ ROAD MAINTENANCE/CONSTRUCTION SERVICES MISSISSIPPI NF-WEST ZONE | $2K |
| Apr 3, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00012N | 237310 | PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA | $146K |
| Mar 22, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00004N | 237310 | PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO | $91K |
| Mar 1, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00021N | 237310 | PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE | $1.1M |
| Feb 20, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00026N | 237310 | THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK. | $27K |
| Dec 20, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00043N | 237310 | PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER. | $11K |
| Dec 19, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00021N | 237310 | PROJECT ME NP ACAD BRG(1): THE PROJECT CONSISTS OF BRIDGE REHABILITATION AND REPAIR OF WILDWOOD ENTRANCE AND JORDAN POND-SEAL HARBOR BRIDGES. THE WORK INCLUDES CUTTING WEEP HOLE OPENINGS INTO ABUTMENTS; CLEANING AND SEALING BRIDGE JOINTS; EROSION RE | $1.1M |
| Nov 15, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00004N | 237310 | PROJECT NC NP BLRI 2F12: THE PROJECT CONSISTS OF ROADWAY RECONSTRUCTION AND DRAINAGE REPAIRS AT MP 276.35. THE WORK INCLUDES BRIDGE WORK; GUARD WALL CONSTRUCTION; LOWER RETAINING WALL WORK; DRAINAGE STRUCTURE REPLACEMENTS; AND OTHER MISCELLANEOUS WO | $1.4M |
| Sep 12, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7319C000006 | 237310 | PROJECT NP-GREE 11(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF ROADWAYS AND PARKING AREAS, CONSTRUCTION OF A BRIDGE, AND REPLACEMENT OF CULVERTS IN THE GREENBELT PARK. THE WORK INCLUDES FULL-DEPTH RECONSTRUCTION OF ASPHALT PAVEMENT, ASPHALT PAVEMENT MILL AND OVERLAY, ASPHALT REMOVAL ON BIKE TRAIL, A GEOSYNTHETIC REINFORCED SOIL-INTEGRATED BRIDGE SYSTEM (GRS-IBS) BRIDGE CONSTRUCTION, HEADWALL AND BOX CULVERT INSTALLATIONS, GRAVEL DIAPHRAGM INSTALLATION AS STORMWATER MANAGEMENT, STEEL-BACKED TIMBER GUARDRAIL REPLACEMENT, AND OTHER MISCELLANEOUS WORK. | $25K |
| Sep 8, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00026N | 237310 | THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK. | $985K |
| Mar 20, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00043N | 237310 | PROJECT TX FTFW SAMA 10(1)_2: THE PROJECT CONSISTS OF THE REHABILITATION AND REALIGNMENT OF THE ENTRANCE ROAD WITHIN THE SAN MARCOS AQUATIC RESOURCES CENTER. | $2.3M |
| Mar 3, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00031N | 237310 | PROJECT FW-GRCO TRL(1): THE PROJECT CONSISTS OF REPLACING THE DAMAGED BOARDWALK ON HEADQUARTERS BOARDWALK TRAIL. THE WORK INCLUDES DESIGN SERVICES, TIMBER PILE AND TIMBER BOARDWALK CONSTRUCTION, AND OTHER MISCELLANEOUS WORK. | $1.8M |
| Feb 23, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00012N | 237310 | PROJECT NP-CHAT 102(1), 906(1), 907(1), 908(1): THE PROJECT CONSISTS OF REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, MILLING AND ASPHALT OVERLAY, INSTALLATION OF NEW SIGNS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRA | $2.8M |
| Feb 3, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00026N | 237310 | THIS PROJECT CONSISTS OF REPAIRING SLOPE FAILURES AT MILEPOST 106.6 AND MILEPOST 109.7 THE WORK INCLUDES DESIGN SERVICES, EXCAVATION, EMBANKMENT CONSTRUCTION, AND OTHER MISCELLANEOUS WORK. | $1.5M |
| Aug 23, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00067N | 237310 | PROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK. | $62K |
| Aug 22, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000099 | 237310 | PROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF S | $133K |
| May 25, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00067N | 237310 | PROJECT IN NP INDU 0945(2): THE PROJECT CONSISTS OF BRIDGE SUPERSTRUCTURE REMOVAL, TEMPORARY TRAFFIC CONTROL, AND OTHER MISCELLANEOUS WORK. | $339K |
| Aug 26, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000099 | 237310 | PROJECT FW BIOA 12(1) THE PROJECT CONSISTS OF RECONSTRUCTION OF THE FALLING TIMBER BRIDGE ON SHAPE CHARGE ROAD (FW ROUTE 012). THE WORK INCLUDES REPLACEMENT OF FALLING TIMBER BRIDGE, RECONSTRUCTION OF APPROACHES, AGGREGATE RESURFACING, REMOVAL OF S | $1.4M |
Get Alerted Before Eclipse Companies, LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start for free