Federal Contractor Profile
Egi Hsu Jv LLC
$106M obligated·37 awards·3 agencies·1 NAICS
Federal Contracts
Showing contracts 51–100 of 144 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 13, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4250 | 236220 | REPAIR LIGHTING AT FARRAGUT FIELD | $45K |
| Aug 6, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $5K |
| Jul 30, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00062 | 236220 | C106724,C10770,C102867 AND C105670 - REAL TIME LOCATOR SYSTEM,UNINTERRUPTIBLE POWER SUPPLY AND BATTERY MONITORING SYSTEMS,INTERNAL SECURITY CAMERA AND MASS NOTIFICATION SYSTEM IN BLDG. 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $42K |
| Jul 29, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00061 | 236220 | C102579 - REMOVAL OF R-22 REFRIGERANT, REPLACEMENT OF CHILLERS AND COOLING TOWERS, INSTALL CONDENSER WATER PIPING, BLDG 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $435K |
| Jul 20, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4250 | 236220 | REPAIR LIGHTING AT FARRAGUT FIELD | $747K |
| Jul 16, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5422 | 236220 | X005 B1775 NMMC GALLERIES 13 AND 14 BUILD-OUTS | $10K |
| Jul 15, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5422 | 236220 | X005 B1775 NMMC GALLERIES 13 AND 14 BUILD-OUTS | $39K |
| Jul 12, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $6K |
| Jul 8, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4634 | 236220 | SB MACC MINIMUM GUARANTEE | $10K |
| Jul 6, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4250 | 236220 | REPAIR LIGHTING AT FARRAGUT FIELD | $47K |
| Jun 25, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $41K |
| Jun 25, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5422 | 236220 | X005 B1775 NMMC GALLERIES 13 AND 14 BUILD-OUTS | $212K |
| Jun 17, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F4652 | 236220 | P719 WARGAMING DEMOLITION, MCB QUANTICO, VA | $9K |
| Jun 1, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $67K |
| Apr 27, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $186K |
| Apr 26, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $67K |
| Apr 14, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00062 | 236220 | C106724,C10770,C102867 AND C105670 - REAL TIME LOCATOR SYSTEM,UNINTERRUPTIBLE POWER SUPPLY AND BATTERY MONITORING SYSTEMS,INTERNAL SECURITY CAMERA AND MASS NOTIFICATION SYSTEM IN BLDG. 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $3.2M |
| Mar 1, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4250 | 236220 | REPAIR LIGHTING AT FARRAGUT FIELD | $617K |
| Feb 24, 2021 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008021F4250 | 236220 | REPAIR LIGHTING AT FARRAGUT FIELD | $1.6M |
| Jan 21, 2021 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $58K |
| Dec 18, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $55K |
| Sep 30, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5422 | 236220 | X005 B1775 NMMC GALLERIES 13 AND 14 BUILD-OUTS | $1.9M |
| Sep 30, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5490 | 236220 | WNY-219/220 HVAC RENOVATION | $6.1M |
| Sep 23, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5346 | 236220 | X004 ACQR PUSH FOR BUILDING 1136 - RENOVATIONS | $1.3M |
| Sep 17, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $22K |
| Sep 17, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F5251 | 236220 | X003 CONTRACT CONSTRUCTION FOR WO1603227 -- IPL B-168 CREATE STOR | $2.3M |
| Sep 14, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00062 | 236220 | C106724,C10770,C102867 AND C105670 - REAL TIME LOCATOR SYSTEM,UNINTERRUPTIBLE POWER SUPPLY AND BATTERY MONITORING SYSTEMS,INTERNAL SECURITY CAMERA AND MASS NOTIFICATION SYSTEM IN BLDG. 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $1.5M |
| Sep 1, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200004 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $131K |
| Sep 1, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $43K |
| Aug 7, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $5K |
| Jul 2, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $7K |
| Jun 1, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $41K |
| May 28, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F4652 | 236220 | P719 WARGAMING DEMOLITION, MCB QUANTICO, VA | $554K |
| May 27, 2020 | Department of DefenseNAVFACSYSCOM WASHINGTON | N4008020F4536 | 236220 | NRL-260 E-2 RECORD CONSTRUCT NEW LAB SPACE PW 5887 | $3.7M |
| Apr 21, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200007 | 236220 | C101156 - CONSTRUCTION SERVICES FOR BUILDING ENVELOPE LEAK STUDY AND REPAIRS AT CHILDREN'S INN (BUILDING 62/62A) - NIH BETHESDA, MD CAMPUS | $12K |
| Apr 15, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200004 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $1.3M |
| Apr 6, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $2.0M |
| Mar 10, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $2.0M |
| Mar 10, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $18K |
| Feb 24, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200005 | 236220 | IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $39K |
| Feb 21, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $36K |
| Feb 5, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $12K |
| Jan 27, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $125K |
| Jan 15, 2020 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200007 | 236220 | C101156 - CONSTRUCTION SERVICES FOR BUILDING ENVELOPE LEAK STUDY AND REPAIRS AT CHILDREN'S INN (BUILDING 62/62A) - NIH BETHESDA, MD CAMPUS | $5K |
| Sep 27, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00062 | 236220 | C106724,C10770,C102867 AND C105670 - REAL TIME LOCATOR SYSTEM,UNINTERRUPTIBLE POWER SUPPLY AND BATTERY MONITORING SYSTEMS,INTERNAL SECURITY CAMERA AND MASS NOTIFICATION SYSTEM IN BLDG. 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $6.8M |
| Sep 20, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00059 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $72K |
| Sep 18, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | HHSN29200005 | 236220 | IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT. | $91K |
| Sep 10, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00060 | 236220 | IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR | $1K |
| Aug 20, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99018F00008 | 236220 | C102819 - FIRE ALARM/MASS NOTIFICATION - PHASE 2, BETHESDA CAMPUS | $3K |
| Aug 20, 2019 | Department of Health and Human ServicesNIH A E CONSTRUCTION | 75N99019F00061 | 236220 | C102579 - REMOVAL OF R-22 REFRIGERANT, REPLACEMENT OF CHILLERS AND COOLING TOWERS, INSTALL CONDENSER WATER PIPING, BLDG 11 PERFORMANCE CONSTITUTES ACCEPTANCE | $5.7M |
Get Alerted Before Egi Hsu Jv LLC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free