Home/Contractors/Egi Hsu Jv LLC/contracts

Federal Contractor Profile

Egi Hsu Jv LLC

$106M obligated·37 awards·3 agencies·1 NAICS

Federal Contracts

Showing contracts 101144 of 144 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jun 27, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$18K
Jun 9, 2019Department of Health and Human ServicesNIH A E CONSTRUCTION75N99019F00059236220IGF::OT::IGF - TAS::75 0838::TAS - C102981 - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, MECHANICAL ROOM, BUILDING 6B CHUCK KIRBY. SEE ATTACHED SOW. BASE - REPLACEMENT OF THE SUPPLY FANS AND SUPPORTIVE SYSTEMS. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $3,799,692.94. OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED AT THE ESCALATION PRICE LISTED BELOW. OPTION 1 - REPLACEMENT OF THE CONTROLS AND BOXES FOR THE SPACES ON THE BUILDING FLOORS. IF OPTION 1 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED. ESCALATION PRICE PROPOSED FOR OPTION #1. OPTION 1 PRICE - 2019 $ 1,740,038.64 OPTION 1 PRICE - 2020 $ 1,961,515.61 OPTION 1 PRICE - 2021 $ 2,150,935.21 THE PERIOD OF PERFORMANCE FOR THIS TASK IS FROM 06/17/2019 TO 06/25/2021, WHICH INCLUDES 10 DAYS FOR MOBILIZATION, 312 DAYS (4/20/2020) FOR BASE COMPLETION, 355 DAYS (4/20/2021) FOR OPTION 1 COMPLETION, AND 60 DAYS FOR FINAL INVOICING AND CLOSEOUT. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8037135, ORF TAS::75 0838::TAS 08023820195DB0 DUNS # 827923850 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$3.8M
May 15, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$51K
May 13, 2019Department of Health and Human ServicesNIH A E CONSTRUCTION75N99019F00060236220IGF::OT::IGF - TAS::75 0838::TAS - C105256 - CONSTRUCTION SERVICES - CC/DLM CASEWORK REPLACEMENT - PHASE 2, ROOM 2C324, BUILDING 10. SEE ATTACHED SOW. BASE - PERFORM DEMOLITION AND INSTALL NEW CASEWORK, PLUMBING, ELECTRICAL, MECHANICAL, AND FLOOR$1.7M
May 13, 2019Department of DefenseNAVFACSYSCOM WASHINGTONN4008019F4555236220IGF::OT::IGF X001 FY19 SB MACC-MINIMUM GUARANTEE-EGI HSU JV$10K
Mar 29, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200006236220IGF::OT::IGF C100405 - BLDG 14F REPLACE SUPPLY AND EXHAUST FANS - CONSTRUCTION - CHUCK KIRBY$60K
Mar 27, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$10K
Mar 7, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200007236220C101156 - CONSTRUCTION SERVICES FOR BUILDING ENVELOPE LEAK STUDY AND REPAIRS AT CHILDREN'S INN (BUILDING 62/62A) - NIH BETHESDA, MD CAMPUS$34K
Feb 13, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200006236220IGF::OT::IGF C100405 - BLDG 14F REPLACE SUPPLY AND EXHAUST FANS - CONSTRUCTION - CHUCK KIRBY$20K
Feb 12, 2019Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$23K
Dec 13, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$210K
Nov 28, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200007236220C101156 - CONSTRUCTION SERVICES FOR BUILDING ENVELOPE LEAK STUDY AND REPAIRS AT CHILDREN'S INN (BUILDING 62/62A) - NIH BETHESDA, MD CAMPUS$1.8M
Nov 6, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$4K
Nov 5, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$280
Sep 26, 2018Department of Health and Human ServicesNIH A E CONSTRUCTION75N99018F00008236220C102819 - FIRE ALARM/MASS NOTIFICATION - PHASE 2, BETHESDA CAMPUS$3.5M
Aug 27, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200006236220IGF::OT::IGF C100405 - BLDG 14F REPLACE SUPPLY AND EXHAUST FANS - CONSTRUCTION - CHUCK KIRBY$70K
Aug 24, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$94K
Aug 14, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$28K
Jul 30, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$3K
Jun 1, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$1K
May 30, 2018Department of DefenseNAVFACSYSCOM WASHINGTONN4008018F4581236220IGF::OT::IGF X001 FY18 DBB SB MACC-MINIMUM GUARANTEE$5K
May 23, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$1.2M
May 4, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$5K
May 1, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$1K
Apr 23, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$1K
Mar 15, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200006236220IGF::OT::IGF C100405 - BLDG 14F REPLACE SUPPLY AND EXHAUST FANS - CONSTRUCTION - CHUCK KIRBY$459K
Mar 12, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$9K
Mar 9, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$25K
Mar 7, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200007236220C101156 - CONSTRUCTION SERVICES FOR BUILDING ENVELOPE LEAK STUDY AND REPAIRS AT CHILDREN'S INN (BUILDING 62/62A) - NIH BETHESDA, MD CAMPUS$2.9M
Feb 23, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$72K
Feb 2, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$88K
Jan 30, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$3K
Jan 10, 2018Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$2K
Sep 24, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$122K
Sep 18, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$61K
Sep 13, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200006236220IGF::OT::IGF C100405 - BLDG 14F REPLACE SUPPLY AND EXHAUST FANS - CONSTRUCTION - CHUCK KIRBY$4.0M
Sep 1, 2017Department of DefenseNAVFACSYSCOM WASHINGTON0002236220IGF::OT::IGF REPAIR SINKHOLES AND WEST WALL SANTEE BASIN AT THE UNITED STATES NAVAL ACADEMY COMPLEX, ANNAPOLIS, MD$319K
Jul 5, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200005236220IGF::OT::IGF - ("OTHER FUNCTIONS") C103789 - CONSTRUCTION SERVICES TO UPGRADE THE EXISTING BLDG 10 COMPLEX FIRE SYSTEM ALARM CONTROL EQUIPMENT - MICHAEL OPPELT BASE: BUILDING 10 COMPLEX FIRE ALARM SYSTEM CONTROL EQUIPMENT UPGRADE $5,746,759.01 OPTION 1: ADD TO PROVIDE CIRCUIT INTEGRITY (CI) RATED CABLE IN LIEU OF STANDARD CABLE SPECIFIED. REFER TO SPECIFICATION SECTION 283111 SUBPART 1.3 M. $116,243.10. OPTION 1 WILL NOT BE MADE AS PART OF THE BASE AWARD, BUT MAY BE EXERCISED BY THE GOVERNMENT THROUGH NOVEMBER 30, 2018. OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 07/13/2017 - 09/16/2018 TASK ORDER: 07/13/2017 - 12/16/2018 MILESTONE: WORK RELATED FOR BUILDING 10 E-WING RISERS AND PANELS SHALL BE COMPLETE AND FULLY OPERATIONAL EXCEPT FOR FINAL ACCEPTANCE TESTING PER SPECIFICATION SECTION 11000, SUBPART 1.2, PARAGRAPH C PERFORMANCE TIME (CALENDAR DAYS): WITHIN 180 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: JANUARY 9, 2018 MILESTONE: SUBSTANTIAL COMPLETION PERFORMANCE TIME (CALENDAR DAYS): WITHIN 430 DAYS OF THE DATE OF NOTICE TO PROCEED DATE OF COMPLETION: SEPTEMBER 16, 2018 MILESTONE: COMPLETION OF PUNCH LIST PERFORMANCE TIME (CALENDAR DAYS): WITHIN 14 DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: SEPTEMBER 30, 2018 MILESTONE: PROJECT CLOSEOUT DOCUMENTS PERFORMANCE TIME (CALENDAR DAYS): WITHIN 21DAYS OF THE DATE OF SUBSTANTIAL COMPLETION DATE OF COMPLETION: OCTOBER 7, 2018 PRICE: BASE TASK ORDER: $5,746,759.01 CLARIFICATIONS INCLUDED: PO: PAGE 13 OF THE PDF FILE STATES: "1) ASSUMPTION: ALL WORK TO BE PERFORMED DURING NORMAL WORK HOURS, EXCEPT FOR THE CHANGEOVER OF THE SURGICAL SUITE PANELS." PLEASE CLARIFY THE INTENT IN COMPLYING WITH FINAL ACCEPTANCE SYSTEM TESTING (SPEC SECTION 283111, SUBPART 3.4.F.4), AND THE FIRE WATCH REQUIREMENTS PER SPEC SECTION 283111, SUBPART 3.1.O.6. GC: FINAL TESTING WILL BE PERFORMED OVER 4 CONSECUTIVE WEEKENDS AS INDICATED IN THE SPECIFICATIONS. FIRE WATCH WILL BE PROVIDED IF THE SHUTDOWN EXTENDS BEYOND THE HOURS OF 6AM TO 4PM AS INDICATED IN THE SPECIFICATIONS. DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8026903, ORF TAS::75 7/1 0838::TAS 08023820175DB0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN SEPTEMBER 16, 2018. * THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$5.7M
Apr 11, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200004236220IGF::OT::IGF - TAS::75 0838::TAS - HHSN292201400011I - HHSN29200004 - C100802 - TASK ORDER - CONSTRUCTION SERVICES - REPLACE AIR HANDLING UNITS, BUILDING 5 JAMES NG SEE ATTACHED SOW AND PROVIDED BASIS OF DESIGN, SPECIFICATIONS, AND DRAWINGS.BASE - REPLACE AIR HANDLING UNIT #2. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $1,442,683.82.OPTION 1 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,171,700.22.OPTION 1 - REPLACE AIR HANDLING UNIT #1 IN 2018. IF OPTION 1 IS NOT EXERCISED IN CY 2018 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 1:OPTION 1 PRICE - 2018 $ 1,171,700.22OPTION 1 PRICE - 2019 $ 1,258,585.94OPTION 1 PRICE - 2020 $ 1,354,724.24OPTION 1 PRICE - 2021 $ 1,452,466.29OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $1,237,586.57.OPTION 2 - REPLACE AIR HANDLING UNIT #3 IN 2019. IF OPTION 2 IS NOT EXERCISED IN CY 2019 THAN ESCALATION PRICE AS PROPOSED WILL APPLY FOR THE RESPECTIVE YEAR IF/WHEN THE OPTION IS EXERCISED.ESCALATION PRICE PROPOSED FOR OPTION 2:OPTION 2 PRICE - 2019 $ 1,237,586.57OPTION 2 PRICE - 2020 $ 1,330,735.84OPTION 2 PRICE - 2021 $ 1,429,859.53OPTION 2 PRICE - 2022 $ 1,530,812.06THE PERIOD OF PERFORMANCE TO COMPLETE THE BASE SCOPE OF WORK IS FROM 04/17/2017 TO 04/15/2018 HOWEVER SUFFICIENT TIME WILL BE SPECIFIED TO IMPLEMENT THE OPTION ITEMS WITH CONSIDERATION GIVEN TO ESCALATION.DELIVER TO: NIH CAMPUS, BUILDING 5PRODUCT SERVICE CODE: Y1JZPRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8027361, ORFTAS::75 0838::TAS 08023820175DB0DUNS # 827923850ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$1.4M
Feb 3, 2017Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200003236220IGF::OT::IGF C103755 ELEVATOR DOOR MODERNIZATION IN BLDGS. 10, 38A AND 45 PROJECT OFFICER: JAMES KOWAL POP 9/28/2016 - 04/03/2017. ADDITIONAL 60 DAYS ADDED FOR ADMIN AND CLOSEOUT.$16K
Sep 29, 2016Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200003236220IGF::OT::IGF C103755 ELEVATOR DOOR MODERNIZATION IN BLDGS. 10, 38A AND 45 PROJECT OFFICER: JAMES KOWAL POP 9/28/2016 - 04/03/2017. ADDITIONAL 60 DAYS ADDED FOR ADMIN AND CLOSEOUT.$499K
Sep 15, 2016Department of Health and Human ServicesNIH A E CONSTRUCTIONHHSN29200002236220IGF::OT::IGF - C101882- CONSTRUCTION SERVICES - BLDG. 10 ,11TH FLOOR, D-WING, LAB RENOVATIONS ROOMS 11B15, 11B17, 11B19, AND 11B12 LABORATORY IMMUNOREGULATION- GARDNER BAYLESS. THIS TASK ORDER IS TO PROCURE CONSTRUCTION SERVICES - BLDG. 10 11TH FLOOR D-WING, ROOMS 11B15, 11B17, 11B19 AND 11B12 LABORATORY OF IMMUNOREGULATION. OPTION ITEM 1: TEMPORARY POWER DURING REPLACEMENT OF TWO EXISTING PANELS. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $ 6,714.96. OPTION ITEM 2: HAZARDOUS MATERIALS ASSESSMENT. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $9,648.34. TOTAL FOR BASE AND TWO (2) OPTION ITEMS IS 439,844.12. PERIOD OF PERFORMANCE: WORK 09/16/2016 -03/14/2017 PERIOD OF PERFORMANCE: TASK ORDER 09/16/2016 - 06/12/2017 DELIVER TO: NIH CAMPUS, BLDG. 10 PRODUCT SERVICE CODE: Y1JZ PRODUCT/SERVICE DESCRIPTION: CONSTRUCTION OF MISCELLANEOUS BUILDINGS CAN # 8024525, TAS:: 75-7-0885:: TAS 08028520161DA0 DUNS # 827923850 FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR1984) THE CONTRACTOR SHALL BE REQUIRED TO (A) COMMENCE WORK UNDER THIS CONTRACT WITHIN 5 (FIVE) CALENDAR DAYS AFTER THE DATE THE CONTRACTOR RECEIVES THE NOTICE TO PROCEED, (B) PROSECUTE THE WORK DILIGENTLY, AND (C) COMPLETE THE ENTIRE WORK READY FOR USE NOT LATER THAN JUNE 12, 2017. THE TIME STATED FOR COMPLETION SHALL INCLUDE 10 DAYS FOR MOBILIZATION AND FINAL CLEANUP OF THE PREMISES. (END OF CLAUSE) ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.$440K
Aug 2, 2016Department of DefenseNAVFACSYSCOM WASHINGTON0002236220IGF::OT::IGF REPAIR SINKHOLES AND WEST WALL SANTEE BASIN AT THE UNITED STATES NAVAL ACADEMY COMPLEX, ANNAPOLIS, MD$6.1M
Dec 15, 2015Department of Health and Human ServicesOD OM ORFDO OA OFC ACQUISITIONSHHSN29200001236220IGF::OT::IGF - BLDG 34/34A DECOMMISSIONING SERVICES - TO REMOVE ALL ENVIRONMENTAL RISKS AS IDENTIFIED BY REPORT - ROBERT HORSCH$262K

Get Alerted Before Egi Hsu Jv LLC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free