| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Feb 3, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326C000004 | 237310 | PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK. | $5.7M |
| Nov 25, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00007N | 237310 | PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN | $13M |
| Oct 30, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7326F00004N | 237310 | TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH | $3.1M |
| Sep 16, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00010N | 237310 | PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | $900K |
| Sep 15, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324C000009 | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $1.4M |
| Aug 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00013N | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $440K |
| Jun 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324C000009 | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $1.5M |
| Apr 28, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00013N | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $647K |
| Mar 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325C000008 | 237310 | NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB | $33M |
| Jan 6, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324C000009 | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $137K |
| Dec 5, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00013N | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $2.1M |
| Nov 29, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00059N | 237310 | PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING | $150K |
| Nov 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7325F00010N | 237310 | PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | $1.8M |
| Sep 5, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00088N | 237310 | PROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME | $2.6M |
| May 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00059N | 237310 | PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING | $645K |
| May 20, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324C000009 | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $20M |
| Apr 26, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000018 | 237310 | PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | $29M |
| Apr 17, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7324F00055N | 237310 | PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK. | $322K |
| Mar 19, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $2.1M |
| Dec 13, 2023 | Department of the InteriorSER NORTH MABO (53000) | 140P5323C0043 | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER | $48K |
| Sep 11, 2023 | Department of the InteriorSER NORTH MABO (53000) | 140P5323C0035 | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WATER TANK REHAB SYSTEM | $857K |
| Sep 7, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00109N | 237310 | PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA | $376K |
| Sep 6, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000018 | 237310 | PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | $35M |
| Aug 30, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $277K |
| Aug 16, 2023 | Department of the InteriorSER NORTH MABO (53000) | 140P5323C0043 | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER | $488K |
| Aug 9, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000001 | 237310 | PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE | $23K |
| Jul 10, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00111N | 237310 | PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE | $32K |
| May 18, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $128K |
| Mar 2, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000001 | 237310 | PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE | $151K |
| Dec 20, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323F00009N | 237310 | PROJECT AL ERFO FW BOSE 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF THE BOARDWALK ON GATOR LAKE TRAIL AND OTHER MISCELLANEOUS WORK. | $525K |
| Oct 28, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7323C000001 | 237310 | PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE | $1.7M |
| Sep 15, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $7.4M |
| Sep 8, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00111N | 237310 | PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE | $540K |
| Sep 6, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F00109N | 237310 | PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA | $3.4M |
| Sep 1, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000024 | 237310 | PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM | $479K |
| Aug 22, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $562K |
| Jul 13, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $657K |
| Jun 9, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $326K |
| Jan 26, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322C000006 | 237310 | PROJECT NP-FOOT 8G16, 8H10: THE WORK INCLUDES FULL DEPTH RECLAMATION OF FOOTHILLS PARKWAY SECTIONS 8G AND 8H MAINLINE, PARKING AREAS, AND PULL-OFFS; ESTABLISHING ROADSIDE DITCHES AND RECONDITIONING PAVED WATERWAYS; REPLACING SIGNS AND PAVEMENT MARKI | $31M |
| Jan 4, 2022 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7322F000009 | 237310 | PROJECT MS ERFO NPS VICK 2020-1(1). THE PROJECT CONSIST OF RECONSTRUCTING ROADS TO RESTORE TO PRE-DISASTER CONDITION. THE WORK INCLUDES SLIDE REPAIRS AND BRIDGE REPAIRS. THE WORK ITEMS WILL INCLUDE EROSION AND SEDIMENT CONTROL, TEMPORARY DIVERSION B | $2.2M |
| Sep 16, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321P000048 | 237310 | PROJECT NP NATR 3Q9, 3P26, 3O23 - TRAFFIC CONTROL FOR SUBSURFACE INVESTIGATION (PAVEMENT CORES AND ROADWAY BORINGS) | $79K |
| Sep 8, 2021 | Department of JusticeUSP LEE | 15B11721PWP240055 | 237310 | TRANSPORT BACKHOE & SKIDSTEER FROM BUS CENTER | $3K |
| Sep 1, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000001 | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $4.2M |
| Sep 1, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000100 | 237310 | PROJECT TN ERFO FS 2019-1(5) THE PROJECT CONSISTS OF REPAIR OF VARIOUS DAMAGED SITES ON MEADOW CREEK ROAD, LOWER PAINT CREEK ROAD, AND WATAUGA POINT ROAD. THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION AND ROCKERY WALLS, AGGREGATE ROADWAY RES | $414K |
| Aug 27, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000070 | 237310 | PROJECT NP NATR BMS FY21(1) THE PROJECT CONSISTS OF EIGHTEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLING, CONCRETE | $87K |
| Aug 26, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321C000024 | 237310 | PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM | $3.6M |
| Aug 20, 2021 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 693C7321F000095 | 237310 | PROJECT NC ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE CONSTRUCTION OF STEEL H-PILE RETAINING WALL BEHIND EXISTING TIER 1 TIMBER RETAINING WALL, REMOVAL OF TIER 2 TIMBER RETAINING WALL RECONSTRUCTION OF PORTION OF PARKING LOT WITHIN BERRY MOUNTAI | $919K |
| Aug 10, 2021 | Department of AgricultureUSDA-FS, CSA EAST 12 | 12445221F0054 | 237310 | MINIMUM GUARANTEE FOR IDIQ | $3K |
| Aug 3, 2021 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2021C0046 | 237310 | VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK | $13K |
| Jul 23, 2021 | Department of the InteriorDSC CONTRACTING SERVICES DIVISION | 140P2021C0046 | 237310 | VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK | $80K |
Get Alerted Before Estes Bros. Const. INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free