Home/Contractors/Estes Bros. Const. INC./contracts

Federal Contractor Profile

Estes Bros. Const. INC.

$330M obligated·68 awards·4 agencies·2 NAICS

Federal Contracts

Showing contracts 150 of 106 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 3, 2026Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326C000004237310PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK.$5.7M
Nov 25, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00007N237310PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN$13M
Oct 30, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7326F00004N237310TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH$3.1M
Sep 16, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00010N237310PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK.$900K
Sep 15, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324C000009237310PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS$1.4M
Aug 26, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00013N237310PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I$440K
Jun 23, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324C000009237310PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS$1.5M
Apr 28, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00013N237310PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I$647K
Mar 26, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325C000008237310NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB$33M
Jan 6, 2025Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324C000009237310PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS$137K
Dec 5, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00013N237310PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I$2.1M
Nov 29, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00059N237310PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING$150K
Nov 21, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7325F00010N237310PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK.$1.8M
Sep 5, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00088N237310PROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME$2.6M
May 21, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00059N237310PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING$645K
May 20, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324C000009237310PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS$20M
Apr 26, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000018237310PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE$29M
Apr 17, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7324F00055N237310PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK.$322K
Mar 19, 2024Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$2.1M
Dec 13, 2023Department of the InteriorSER NORTH MABO (53000)140P5323C0043237110GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER$48K
Sep 11, 2023Department of the InteriorSER NORTH MABO (53000)140P5323C0035237110GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WATER TANK REHAB SYSTEM$857K
Sep 7, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00109N237310PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA$376K
Sep 6, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000018237310PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE$35M
Aug 30, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$277K
Aug 16, 2023Department of the InteriorSER NORTH MABO (53000)140P5323C0043237110GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER$488K
Aug 9, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000001237310PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE$23K
Jul 10, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00111N237310PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE$32K
May 18, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$128K
Mar 2, 2023Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000001237310PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE$151K
Dec 20, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323F00009N237310PROJECT AL ERFO FW BOSE 2020-1(1): THE PROJECT CONSISTS OF THE REMOVAL AND RECONSTRUCTION OF THE BOARDWALK ON GATOR LAKE TRAIL AND OTHER MISCELLANEOUS WORK.$525K
Oct 28, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7323C000001237310PROJECT TN ERFO FS 2019-1(4): THE PROJECT CONSISTS OF THE REPAIR OF VARIOUS DAMAGED SITES ON ROUND KNOB ROAD (FS-88), GREYSTONE SPUR (FS-88A), GREENE MOUNTAIN ROAD (FS-98). THE WORK INCLUDES ROADWAY RESURFACING, CONSTRUCTION OF GABION WALLS, REPLACE$1.7M
Sep 15, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$7.4M
Sep 8, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00111N237310PROJECT NC NP BLRI BR 5140-097P: THE PROJECT CONSISTS OF REDUCING LAKE WATER LEVEL, REPAIRING DAMAGE TO THE BRIDGE PIERS, AND REPLACING PRE-COMPRESSED FOAM-SUPPORTED SILICONE MATERIAL AT ABUTMENT BRIDGE JOINTS AND ASPHALT CONCRETE WEARING SURFACE$540K
Sep 6, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F00109N237310PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA$3.4M
Sep 1, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000024237310PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM$479K
Aug 22, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$562K
Jul 13, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$657K
Jun 9, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$326K
Jan 26, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322C000006237310PROJECT NP-FOOT 8G16, 8H10: THE WORK INCLUDES FULL DEPTH RECLAMATION OF FOOTHILLS PARKWAY SECTIONS 8G AND 8H MAINLINE, PARKING AREAS, AND PULL-OFFS; ESTABLISHING ROADSIDE DITCHES AND RECONDITIONING PAVED WATERWAYS; REPLACING SIGNS AND PAVEMENT MARKI$31M
Jan 4, 2022Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7322F000009237310PROJECT MS ERFO NPS VICK 2020-1(1). THE PROJECT CONSIST OF RECONSTRUCTING ROADS TO RESTORE TO PRE-DISASTER CONDITION. THE WORK INCLUDES SLIDE REPAIRS AND BRIDGE REPAIRS. THE WORK ITEMS WILL INCLUDE EROSION AND SEDIMENT CONTROL, TEMPORARY DIVERSION B$2.2M
Sep 16, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321P000048237310PROJECT NP NATR 3Q9, 3P26, 3O23 - TRAFFIC CONTROL FOR SUBSURFACE INVESTIGATION (PAVEMENT CORES AND ROADWAY BORINGS)$79K
Sep 8, 2021Department of JusticeUSP LEE15B11721PWP240055237310TRANSPORT BACKHOE & SKIDSTEER FROM BUS CENTER$3K
Sep 1, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000001237310TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9.$4.2M
Sep 1, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000100237310PROJECT TN ERFO FS 2019-1(5) THE PROJECT CONSISTS OF REPAIR OF VARIOUS DAMAGED SITES ON MEADOW CREEK ROAD, LOWER PAINT CREEK ROAD, AND WATAUGA POINT ROAD. THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION AND ROCKERY WALLS, AGGREGATE ROADWAY RES$414K
Aug 27, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000070237310PROJECT NP NATR BMS FY21(1) THE PROJECT CONSISTS OF EIGHTEEN BRIDGE PREVENTIVE MAINTENANCE REPAIRS WITHIN THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILLING, CONCRETE$87K
Aug 26, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321C000024237310PROJECT NP-CHCH 500(1), 501(1), ETC. THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 2.00 MILES OF GLENN-KELLY ROAD, 0.82 MILES OF BATTLELINE ROAD, AND 0.33 MILES OF POE ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, ALL WITHIN THE CHICKAM$3.6M
Aug 20, 2021Department of Transportation693C73 EASTERN FED LANDS DIVISION693C7321F000095237310PROJECT NC ERFO COE 2019-1(1) THE PROJECT CONSISTS OF THE CONSTRUCTION OF STEEL H-PILE RETAINING WALL BEHIND EXISTING TIER 1 TIMBER RETAINING WALL, REMOVAL OF TIER 2 TIMBER RETAINING WALL RECONSTRUCTION OF PORTION OF PARKING LOT WITHIN BERRY MOUNTAI$919K
Aug 10, 2021Department of AgricultureUSDA-FS, CSA EAST 1212445221F0054237310MINIMUM GUARANTEE FOR IDIQ$3K
Aug 3, 2021Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2021C0046237310VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK$13K
Jul 23, 2021Department of the InteriorDSC CONTRACTING SERVICES DIVISION140P2021C0046237310VARIOUS PAVEMENT REPAIRS, SHEN 222242, SHENANDOAH NATIONAL PARK$80K