Showing award actions 1–50 of 132 funded award actions, most recent first.

Contracts with positive obligations
13
Funded award actions shown
132
Obligations shown
$1.7B
Awarding agencies
1

This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.

Award data as of August 24, 2026. Source: USAspending federal award records.

DateAgencyPIIDNAICSDescriptionAmount
Aug 24, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$1.6M
Aug 24, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$39M
Aug 20, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$31M
Jul 14, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$800K
Jun 30, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$22M
May 13, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$23M
Apr 30, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$15M
Mar 31, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$6.8M
Mar 13, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$11M
Jan 26, 2026Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$25M
Dec 31, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$5.1M
Nov 26, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$30M
Nov 3, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$1.0M
Sep 29, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$6.9M
Sep 24, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$11M
Aug 29, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$16M
Aug 28, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$850K
Jul 31, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$24M
Jul 1, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$10M
Jun 18, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$2.2M
Jun 10, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$11M
May 14, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$14M
Apr 8, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$14M
Mar 13, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$9.4M
Feb 19, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$22M
Jan 7, 2025Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$19M
Dec 19, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$30K
Dec 19, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$5.9M
Nov 27, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$120K
Nov 26, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$24M
Nov 19, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$6K
Oct 10, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$15M
Sep 27, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$19M
Sep 19, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$400K
Aug 14, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$24M
Jul 15, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$15M
Jul 8, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$1.9M
Jun 25, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$7.8M
Jun 7, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$15M
May 2, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$18M
Apr 29, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$350K
Apr 8, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$200K
Mar 29, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$18M
Mar 6, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$1.4M
Feb 27, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$22M
Feb 7, 2024Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$200K
Dec 20, 2023Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$32M
Nov 15, 2023Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303123FEM400244562910THIS IS A TASK ORDER ISSUED AGAINST THE IDIQ CLIN 0401 OF DE-EM0004895 FOR THE SHIPMENT AND DESTRUCTION OF LEGACY R-114 FROM THE PADUCAH SITE.$1.0M
Nov 8, 2023Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFCDEEM0004895562910THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF$25M
Sep 29, 2023Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC89303122FEM400243562910PURPOSE OF TASK ORDER PARTIAL DISMANTLEMENT OF C-535-2 SWITCHYARD; PARTIAL CHARACTERIZATION OF C-531-2 SWITCHYARD; PARTIAL CHARACTERIZATION OF C-533-2 SWITCHYARD; PLUS OTHER OPTIONAL ITEMS.$3.4M