Federal Contractor Profile
Four Rivers Nuclear Partnership LLC
$1.7B obligated·13 awards·1 agencies·1 NAICS
Federal Contracts
Showing award actions 101–132 of 132 funded award actions, most recent first.
- Contracts with positive obligations
- 13
- Funded award actions shown
- 132
- Obligations shown
- $1.7B
- Awarding agencies
- 1
This table shows award actions with a positive obligation. Zero-dollar and negative-dollar actions, such as administrative changes and deobligations, are not displayed. Multiple award actions may belong to the same contract.
Award data as of August 24, 2026. Source: USAspending federal award records.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Jun 8, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $5.0M |
| May 26, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | 89303119FEM400004 | 562910 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION | $2.0M |
| May 8, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $750K |
| May 7, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $2.6M |
| Apr 16, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $19M |
| Mar 9, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $26M |
| Jan 24, 2020 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $21M |
| Dec 16, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $12M |
| Nov 22, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $13M |
| Sep 30, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $361K |
| Sep 23, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $18M |
| Sep 19, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | 89303119FEM400004 | 562910 | PADUCAH GASEOUS DIFFUSION PLANT DEACTIVATION AND REMEDIATION | $736K |
| Jul 16, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $44M |
| Apr 18, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $32M |
| Jan 25, 2019 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $33M |
| Dec 19, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $11M |
| Nov 14, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $15M |
| Oct 16, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $7.0M |
| Sep 24, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $1.9M |
| Sep 5, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | 89303118FEM400003 | 562910 | TASK ORDER TO COMPLETE DEMOLITION OF THE C-400 BUILDING. | $10M |
| Aug 24, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $18M |
| Jun 28, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $18M |
| Jun 14, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $21M |
| Apr 19, 2018 | Department of EnergyEM-PORTSMOUTH/PADUCAH PROJECT OFC | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $17M |
| Mar 8, 2018 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $19M |
| Feb 7, 2018 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $11M |
| Jan 19, 2018 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $11M |
| Dec 22, 2017 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $6.0M |
| Nov 9, 2017 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $28M |
| Sep 15, 2017 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $5.7M |
| Jun 29, 2017 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $2.0M |
| May 25, 2017 | Department of EnergyEM-ENVIRONMENTAL MGMT CON BUS CTR | DEEM0004895 | 562910 | THE SCOPE OF THIS CONTRACT FOCUSES ON THE CONTINUED DEACTIVATION OF THE PADUCAH GASEOUS DIFFUSION PLANT FACILITIES, PREPARING THE FACILITIES FOR FUTURE DEMOLITION, AND PERFORMING ENVIRONMENTAL REMEDIATION ACTIVITIES REQUIRED BY THE FEDERAL FACILITY AGREEMENT AND SITE MANAGEMENT PLAN. IGF::OT::IGF | $2.0M |